The Wisconsin Department of Transportation 2014 WisDOT SE Region Utility Conference Local Program Projects DAAR Engineering, Inc. SE Region Local Program Management Consultant DAAR Engineering, Inc. is the Management Consultant (MC) representing the Wisconsin Department of Transportation CONTACTS MANAGEMENT CONSULTANT (MC) CONTACTS: STAN LUKASZ, P.E. TODD BECKER, P.E. WisDOT SE Region MC – Program Manager DAAR Engineering, Inc. 325 E. Chicago Street, Ste. 500 Milwaukee WI 53202 Office (414) 225-9817 Direct (414) 935-4360 [email protected] WisDOT SE Region MC – Design Manager DAAR Engineering, Inc. 325 E. Chicago Street, Ste. 500 Milwaukee WI 53202 Office (414) 225-9817 Direct (414) 935-4359 [email protected] JOE KLARKOWSKI, R.L.S. RON ANDERSON WisDOT SE Region MC – Construction Manager DAAR Engineering, Inc. 325 E. Chicago Street, Ste. 500 Milwaukee WI 53202 Office (414) 225-9817 Direct (414) 935-4410 [email protected] WisDOT SE Region MC – Utility & RR Coordinator DAAR Engineering, Inc. 325 E. Chicago Street, Ste. 500 Milwaukee WI 53202 Office (414) 225-9817 Direct (414) 935-4368 [email protected] MANAGEMENT CONSULTANT ROLE OF MANAGEMENT CONSULTANT Retained by WisDOT as an extension of SE Region Staff Serve as a resource to Municipalities, Utility Companies, Design and Construction Engineers, and Contractors Ensure compliance with State and Federal Standards regarding design and construction projects with utility involvements Review and Process PS&Es and Utility Documentation for LET Provide construction oversight including, but not limited to, facilitating utility conflicts during construction MANAGEMENT CONSULTANT MC REVIEWS (PRIOR TO PS&E): Submittal materials - utility correspondence, emails, letters, phone logs to ensure all steps of the utility coordination process have been completed Municipality approval of WORK PLANS (Roadway Permitting Authority), design plans, plat, UTILITY LOG, and USR **Designer provides copy of above to MC for WisDOT Project File 28 days prior to PS&E Approval MANAGEMENT CONSULTANT COORDINATION BETWEEN PS&E & LET THIS IS WHERE THOSE SPECIAL PROVISIONS ARE IMPORTANT: If Specials state that they will be moving PRIOR/DURING –ORNOT AT ALL; documentation of utility commitments becomes a major factor for bidding and scheduling of construction activities Sponsor or Designer is responsible for monitoring and reporting progress of utility relocations between PS&E and LET. UTILITY COORDINATION DURING CONSTRUCTION MC may assist in resolving utility conflicts MANAGEMENT CONSULTANT ROLE OF MANAGEMENT CONSULTANT MC does NOT : Ensure the accuracy of plans or utility involvements in PS&Es Approve Utility Work Plans on behalf of the Municipality Grant permits to Utility Companies on behalf of the Municipality Issue Notice to Proceed to Utility Companies to begin relocations or adjustments within Local Road R/W on behalf of the Municipality Utility Process Overview UTILITIES MANUALS AND TOOLS WisDOT Guide to Utility Coordination http://roadwaystandards.dot.wi.gov/standards/util/index.htm WisDOT Guide to Utility Coordination (Chapter 17 – LPA) http://roadwaystandards.dot.wi.gov/standards/util/chapter17.pdf WisDOT Facilities Development Manual (Chapter 18 – Utility Coordination) https://trust.dot.state.wi.us/static/standards/fdm/18-00-000toc.pdf WisDOT FDM 18-15-1 & State Statutes (Utility Rights & Responsibilities) https://trust.dot.state.wi.us/static/standards/fdm/18-15-001.pdf Title 23 CFR - Federal Aid Policy Guide (FAPG) http://www.fhwa.dot.gov/legsregs/directives/cfr23toc.htm Utility Process Overview LOCAL PROGRAM (FEDERAL-AID) PROJECTS DO NOT FALL UNDER ADMINISTRATIVE RULE TRANS 220 Use of Trans 220 forms is NOT allowed. MC will furnish similar forms that have been created for the Local Program. Despite not falling under Trans 220, utility coordination process for all Local Program Projects remains the same, including timeframes necessary for coordination and approval of Utility Work Plans. Following utility coordination LEAD TIMES during design is KEY (60/90/120 calendar days afforded to Utilities for return of Work Plans) UTILITY COORDINATION MEETINGS Should have TWO (2) Meetings: Operation Planning Meeting (OPM) is required Recommended meeting for Plan submittal to Utility Companies for request of UTILITY WORK PLANS Utility Process Overview UTILITY WORK PLANS FOR PS&E PURPOSES Municipality (and Designer) reviews UTILITY WORK PLANS to Account for: WHAT the work is WHEN the work will be done WHO will be doing the work (utility company forces or contractors) WHERE they will be doing the work needed to clear construction ***Once ALL questions are answered, a clear picture should emerge of time lines and activities. NOTE: When requesting information from a utility, request Station/Outs to describe all relocations of BOTH EXISTING & PROPOSED facilities. Utility Process Overview UTILITY STATUS REPORT (USR) NEW USR (DT1080) completed by the DESIGNER & Signed by LPPM ALL dates and columns are required to be filled in COMPLETELY with necessary information DT 1080 instructions in Utility Guide CHAPTER 15 PS&E DOCUMENTS - REVIEW AND TIMING ALL UTILITY DOCUMENTS/MATERIALS SUBMITTED TO MC TWENTYEIGHT(28) DAYS PRIOR TO FINAL PS&E DATE (FDM 19-1-1) UTILITY SPECIAL PROVISIONS based on Municipality Approved utility work plans USR reflects what is stated in APPROVED UTILITY WORK PLANS and SPECIAL PROVISIONS COPIES of correspondence that documents commitments stated in PS&E SPECIAL PROVISIONS STATUS of any compensable utility interest(s) and copies of those documents FY 11-14 Local Program Highlighted Projects KENOSHA COUNTY #5 3766-00-70 CTH E Bridge Over Pike River (Replace) LET 08/11/2015 #1 3751-00-70 CTH W CTH F– CTH FR LET 09/08/2015 (Reconstruct) #2 3736-00-72 CTH C CTH KD– CTH W LET 12/08/2015 (Reconstruct) #3 3736-05-00 CTH C CTH U – W Frontage Rd No Scheduled LET (Reconstruct) #4 1693-35-75 Kenosha County Park & Ride LLC 05/25/2014 #6 3729-00-74 39th AVENUE STH 165 – 97th St LET 3/10/2015 (Reconstruct) #2 2100-02-71 S. 35th STREET Burnham to STH 59 LET TBD (Reconstruct) #3 2160-10-70 S 76th STREET (CTH U) 600 ft N OF W. High St – Carter Blvd LET 2/11/2014 (Cap Expansion) #5 2660-05-70 S WHITNALL AVE Bridge over Union Pacific RR LET 02/10/2015 (Replacement) #6 2987-00-14 5th AVENUE RELOCATION STH 32 to Ryan Rd No Scheduled LET (Reconstruct) MILWAUKEE COUNTY Local Program Highlighted Projects #1 2984-16-71 W LLOYD STREET N 60th St – N 47th St LET 02/09/2016 (Reconstruct) #4 2545-03-71 W HAMPTON AVE Green Bay Ave – Teutonia Ave LET 04/08/2014 (Reconstruct) #8 2670-00-71 GREEN TREE ROAD Jean Nicolet Rd to River Rd. LET 07/08/2014 (Resurface) #9 2155-03-71 FOND DU LAC AVENUE Intersection with Sherman Blvd. LET 11/11/2014 (Intersection Mod) #10 2984-39-72 45TH STREET BRIDGE Over Menomonee River LET 02/11/2014 (Rehab) #11 2160-15-70 S 76TH STREET Intersection with Edgerton & Layton Ave LET 03/10/2015 (Intersection Mod) MILWAUKEE COUNTY FY11-14 Local Program Highlighted Projects #7 2500-00-70 N GRANVILLE RD Bridge over Little Menomonee River LET 07/08/2014 (Removal) #16 2160-14-70 S 76TH STREET W Greenfield to W Pierce LET 07/08/2014 (Recondition) #14 2080-00-71 NORTH TEUTONIA AVENUE W. Capitol Ave to W. Ruby Ave LET 3/10/2015 (Pavement Replacement) #15 2505-00-75 S. 13TH STREET West Forest Ave to W Windlake Ave LET 04/14/2015 (Pavement Replacement) #17 2405-00-74 W. MORGAN AVENUE W. Forest Home Ave to S 43rd St LET 8/11/2015 (Reconstruct) MILWAUKEE COUNTY FY11 -14 Local Program Highlighted Projects #12 2595-00-70 N 60TH STREET W Fairy Chasm Rd to W Cnty Line LET 3/10/2015 (Pavement Replacement) #13 2968-02-70 RANGE LINE ROAD Bridge over Milwaukee River LET 11/11/2014 (Rehab) OZAUKEE COUNTY FY11 -14 Local Program Highlighted Projects #1 2697-00-75 MAIN STREET Division Street to Concord Place LET 03/10/2015 (Resurface) FY11-14 Local Program Highlighted Projects #1 2699-02-70 MALCINE ROAD Bridge over Wind Lake Canal LET 11/10/2015 (Replacement) #2 3755-00-01 CTH D (Washington Ave) Bridge over Fox River NO SCHEDULED LET (Replacement) #3 3755-02-00 CTH D Heritage Rd – Rochester Village Limits LET 1/13/15 (Reconstruct) #4 2704-00-73/74 OHIO STREET 16TH St to Washington Ave LET 04/08/2014 (Reconstruct) RACINE COUNTY FY11-14 Local Program Highlighted Projects #1 3841-00-71 BORG RD Bridge over Swan Creek LET 07/14/2015 (Replacement) #2 3849-00-71 CTH DD Bridge Sugar Creek NO SCHEDULED LET (Replacement) #3 3849-00-71 SHERIDAN SPRINGS RD Bridge over White River LET 7/08/2014 (Replacement) WALWORTH COUNTY FY11-14 Local Program Highlighted Projects WASHINGTON COUNTY #1 3944-00-01 CTH N (STATE STREET) Dodge Cnty Limits to Airport Dr. LET 1/13/15 (Reconstruct) #2 2712-00-01 DONGES BAY ROAD Division Rd. S to STH 145 N NO SCHEDULED LET (Pavement Replacement) FY11-14 Local Program Highlighted Projects #1 (Replacement) 2949-00-70 CTH CW (MAPLETON RD) Bridge over Ashippun River LET 03/10/2015 #2 2718-00-74 SUMMIT AVENUE 2nd St. to Thackery Trail LET 06/10/2014 (Reconstruct) #3 2714-04-70 SAWYER RD (CTH P) Bridge over Bark River LET 03/10/2015 (Replacement) #1 (Approaches) 3947-05-71 CTH CW Amber Ln. to 1000’ of Amber Ln LET 03/10/2015 #4 2758-01-70 CTH JJ Intersect with CTH J & CTH SR LET 07/14/2015 (Intersection Mod) #5 3853-00-72 WEST LAKE DRIVE CTH P – Road B LET 3/10/2015 (Resurface) #6 2370-00-73 CTH F(REDFORD RD) Busse Rd to STH 190 South Ramp LET 02/11/2014 (Recondition) #7 2722-11-70 LINCOLN AVENUE Calhoun Rd – CTH O LET 02/11/2014 (Reconstruct) #8 2722-10-70 COFFEE ROAD Calhoun – National LET 1/14/2014 (Reconstruct) #9 2718-12-70 S EAST Avenue Sunset Dr – Wabash Ave LET 12/9/2014 (Reconstruct) WAUKESHA COUNTY FY11-14 Projects & FY13-18 Projects SUNSET DATES PROJECTS THAT WERE APPROVED IN THE FY2011-2014 CYCLE BUILT BY JUNE 30, 2017. PROJECTS THAT WERE APPROVED IN THE FY2013-2018 CYCLE BUILT BY JUNE 30, 2020. WisDOT Programs for Local Governments FY13-18 Projects - 28 Roadway & 15 Bridge Projects HTTP://WWW.DOT.STATE.WI.US/LOCALGOV/INDEX.HTM Questions/Answers Thank You for Listening! We Look Forward to working with You.
© Copyright 2024 ExpyDoc