Full Network Model Scope for FNM DB69 Production (4/17/2014), RIMS Cutoff Date (7/1/2014) Transmission Projects PG&E 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. Palermo - Rio Oso 115 kV Reconductoring, phase # 1 Moss Landing -- convert 230 kV bus to BAAH, phase # 1 Arco - Paramount Farms 70 kV Line upgrade, phase # 1 Arco - Paramount Farms 70 kV Line upgrade, phase # 2 Kern-Old River 70 kV # 1 & 2 Reconductoring, phase # 1 Cortina 60 kV Reliability- Install an additional 115/60 kV or 230/60 kV transformer at Cortina, phase # 2 FRV Regulus Solar Generation Interconnection Project, phase # 1 Salado 115/60 kV Transformer Addition, phase # 1 Humboldt Sub 60 kV Bus Upgrade Project (BAAH in GIS)), phase # 1 Humboldt Sub 60 kV Bus Upgrade Project (BAAH in GIS)), phase # 3 Humboldt Sub 60 kV Bus Upgrade Project (BAAH in GIS)), phase # 4 Humboldt Sub 60 kV Bus Upgrade Project (BAAH in GIS)), phase # 5 Humboldt Sub 60 kV Bus Upgrade Project (BAAH in GIS)), phase # 6 115kV clearance for the Cortina Project (3/20/14 to 6/1/2014), phase # 1 SCE 1. Vestal 220/66kV Sub- Reconfigure 1A & 2A Banks from bank/bus to double-breaker configuration, phase # 2 2. East Kern Wind Resource Area (EKWRA) 66kV (formerly Antelope-Bailey-WindHub 66kV) System Reconfiguration (old 6885), phase # 15 3. East Kern Wind Resource Area (EKWRA) 66kV (formerly Antelope-Bailey-WindHub 66kV) System Reconfiguration (old 6885), phase # 17 4. East Kern Wind Resource Area (EKWRA) 66kV (formerly Antelope-Bailey-WindHub 66kV) System Reconfiguration (old 6885), phase # 18 5. East Kern Wind Resource Area (EKWRA) 66kV (formerly Antelope-Bailey-WindHub 66kV) System Reconfiguration (old 6885), phase # 19 6. East Kern Wind Resource Area (EKWRA) 66kV (formerly Antelope-Bailey-WindHub 66kV) System Reconfiguration (old 6885), phase # 21 7. Sandlot (aka Lockhart, Hinkley, Water Valley) NEW 220kV Substation - (Q125), phase # 4 8. Antelope 66kV bus generator interconnections, phase # 1 9. Devers-Garnet-Venwind 115kV - reconfigured, phase # 1 10. Western Antelope Dry Ranch (Q653H) and Blue Sky Ranch A (Q660) generator interconnection @ Antelope 66kV bus, phase # 1 11. Tehachapi Segment 11 - upgrade Mesa-Vincent 220kV to Mesa-Gould Gould-Vincent 500kV lines, phase # 11-C4 SDGE 1. 2. 3. 4. 5. 6. 7. Reconductor TL695B: Japanese Mesa-Talega Tap, phase # 1 Sycamore-Chicarita Reconductor - TL13820, phase # 1 Talega Area Dynamic Reactive Support, phase # 1 Cannon 138kV Sub- Rebuild Substation, phase # 1 Cannon 138kV Sub- Rebuild Substation, phase # 2 Replace Talega 138/69 kV Bank 50, phase # 1 East County Project (ECO Proj) new 500/230/138kV Substations and lines California ISO – Public Page 1 of 4 Full Network Model Scope for FNM DB69 Production (4/17/2014), RIMS Cutoff Date (7/1/2014) VEA None External 1. 2. 3. 4. 5. APS: Palo Verde 500kV Substation - add new bay 10, phase # 1 SRP: Abel-Browning-Pinal Central plus Randolph new 500kV lines, phase # 1 SRP: Abel-Browning-Pinal Central plus Randolph new 500kV lines, phase # 2 SRP: Abel-Browning-Pinal Central plus Randolph new 500kV lines, phase # 1A SRP: Abel-Browning-Pinal Central plus Randolph new 500kV lines, phase # 3A California ISO – Public Page 2 of 4 Full Network Model Scope for FNM DB69 Production (4/17/2014), RIMS Cutoff Date (7/1/2014) Generation Projects 1. Clover Flat LFG • PGE • Capacity: 0.9 MW • RES_ID: CSTOGA_6_LNDFIL • POD: Calistoga 60kV Bus 2. Cloverdale Solar I Project • PGE • Capacity: 1.5 MW • RES_ID: CLOVDL_1_SOLAR • POD: Cloverdale 115 kV Bus 3. Digger Creek Hydro • Capacity: 0.6 MW • RES_ID: VOLTA_6_DIGHYD • POD: Volta 60kV Bus 4. Dry Farm Ranch B • SCE • Capacity: 5 MW • RES_ID: DELSUR_6_DRYFRB • POD: Antelope 66kV Bus 5. Expressway Solar A • SCE • Capacity: 2 MW • RES_ID: VICTOR_1_EXSLRA • POD: Victor 115kV Bus 6. Expressway Solar B • SCE • Capacity: 2 MW • RES_ID: VICTOR_1_EXSLRB • POD: Victor 115kV Bus 7. Midway Sunset Cogeneration Company – Increase EMS PMax from 234 MW to 2910MW • PGE • Capacity: 291 MW • RES_ID: SUNSET_2_UNITS • POD: Midway 230kV Bus 8. Mojave Solar Project • SCE • Capacity: 250 MW • Aggregated RES_ID: SANDLT_2_SUNITS • Child RES_IDs: SANDLT_2_STGA (125 MW) SANDLT_2_STGB (125 MW) • POD: Kramer 230 kV Bus 9. Victor Dry Farm Ranch A LLC • SCE California ISO – Public Page 3 of 4 Full Network Model Scope for FNM DB69 Production (4/17/2014), RIMS Cutoff Date (7/1/2014) • • • Capacity: 5 MW RES_ID: VICTOR_1_VDRYFA POD: Victor 115kV Bus 10. White River West • PGE • Capacity: 19.8 MW • RES_ID: OLIVEP_1_SOLAR2 • POD: Olive Switching Station 115kv Bus 11. Windland Refresh I • SCE • Capacity: 7 MW • RES_ID: MIDWD_6_WNDLND • POD: Winhub 230kV bus 12. Windstream 6040 • SCE • Capacity: 6.9 MW • RES_ID: NZWIND_6_WDSTR2 • POD: Winhub 230kV bus 13. Windstream 6041 • SCE • Capacity: 6 MW • RES_ID: NZWIND_6_WDSTR3 • POD: Winhub 230kV bus 14. Windstream 6042 • SCE • Capacity: 6.8 MW • RES_ID: NZWIND_6_WDSTR4 • POD: Winhub 230kV bus California ISO – Public Page 4 of 4
© Copyright 2024 ExpyDoc