Full Network Model DB69 Work Scope

Full Network Model Scope for FNM DB69
Production (4/17/2014), RIMS Cutoff Date (7/1/2014)
Transmission Projects
PG&E
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
Palermo - Rio Oso 115 kV Reconductoring, phase # 1
Moss Landing -- convert 230 kV bus to BAAH, phase # 1
Arco - Paramount Farms 70 kV Line upgrade, phase # 1
Arco - Paramount Farms 70 kV Line upgrade, phase # 2
Kern-Old River 70 kV # 1 & 2 Reconductoring, phase # 1
Cortina 60 kV Reliability- Install an additional 115/60 kV or 230/60 kV transformer at Cortina,
phase # 2
FRV Regulus Solar Generation Interconnection Project, phase # 1
Salado 115/60 kV Transformer Addition, phase # 1
Humboldt Sub 60 kV Bus Upgrade Project (BAAH in GIS)), phase # 1
Humboldt Sub 60 kV Bus Upgrade Project (BAAH in GIS)), phase # 3
Humboldt Sub 60 kV Bus Upgrade Project (BAAH in GIS)), phase # 4
Humboldt Sub 60 kV Bus Upgrade Project (BAAH in GIS)), phase # 5
Humboldt Sub 60 kV Bus Upgrade Project (BAAH in GIS)), phase # 6
115kV clearance for the Cortina Project (3/20/14 to 6/1/2014), phase # 1
SCE
1. Vestal 220/66kV Sub- Reconfigure 1A & 2A Banks from bank/bus to double-breaker
configuration, phase # 2
2. East Kern Wind Resource Area (EKWRA) 66kV (formerly Antelope-Bailey-WindHub 66kV)
System Reconfiguration (old 6885), phase # 15
3. East Kern Wind Resource Area (EKWRA) 66kV (formerly Antelope-Bailey-WindHub 66kV)
System Reconfiguration (old 6885), phase # 17
4. East Kern Wind Resource Area (EKWRA) 66kV (formerly Antelope-Bailey-WindHub 66kV)
System Reconfiguration (old 6885), phase # 18
5. East Kern Wind Resource Area (EKWRA) 66kV (formerly Antelope-Bailey-WindHub 66kV)
System Reconfiguration (old 6885), phase # 19
6. East Kern Wind Resource Area (EKWRA) 66kV (formerly Antelope-Bailey-WindHub 66kV)
System Reconfiguration (old 6885), phase # 21
7. Sandlot (aka Lockhart, Hinkley, Water Valley) NEW 220kV Substation - (Q125), phase # 4
8. Antelope 66kV bus generator interconnections, phase # 1
9. Devers-Garnet-Venwind 115kV - reconfigured, phase # 1
10. Western Antelope Dry Ranch (Q653H) and Blue Sky Ranch A (Q660) generator interconnection
@ Antelope 66kV bus, phase # 1
11. Tehachapi Segment 11 - upgrade Mesa-Vincent 220kV to Mesa-Gould Gould-Vincent 500kV
lines, phase # 11-C4
SDGE
1.
2.
3.
4.
5.
6.
7.
Reconductor TL695B: Japanese Mesa-Talega Tap, phase # 1
Sycamore-Chicarita Reconductor - TL13820, phase # 1
Talega Area Dynamic Reactive Support, phase # 1
Cannon 138kV Sub- Rebuild Substation, phase # 1
Cannon 138kV Sub- Rebuild Substation, phase # 2
Replace Talega 138/69 kV Bank 50, phase # 1
East County Project (ECO Proj) new 500/230/138kV Substations and lines
California ISO – Public
Page 1 of 4
Full Network Model Scope for FNM DB69
Production (4/17/2014), RIMS Cutoff Date (7/1/2014)
VEA
None
External
1.
2.
3.
4.
5.
APS: Palo Verde 500kV Substation - add new bay 10, phase # 1
SRP: Abel-Browning-Pinal Central plus Randolph new 500kV lines, phase # 1
SRP: Abel-Browning-Pinal Central plus Randolph new 500kV lines, phase # 2
SRP: Abel-Browning-Pinal Central plus Randolph new 500kV lines, phase # 1A
SRP: Abel-Browning-Pinal Central plus Randolph new 500kV lines, phase # 3A
California ISO – Public
Page 2 of 4
Full Network Model Scope for FNM DB69
Production (4/17/2014), RIMS Cutoff Date (7/1/2014)
Generation Projects
1. Clover Flat LFG
• PGE
• Capacity: 0.9 MW
• RES_ID: CSTOGA_6_LNDFIL
• POD: Calistoga 60kV Bus
2. Cloverdale Solar I Project
• PGE
• Capacity: 1.5 MW
• RES_ID: CLOVDL_1_SOLAR
• POD: Cloverdale 115 kV Bus
3. Digger Creek Hydro
• Capacity: 0.6 MW
• RES_ID: VOLTA_6_DIGHYD
• POD: Volta 60kV Bus
4. Dry Farm Ranch B
• SCE
• Capacity: 5 MW
• RES_ID: DELSUR_6_DRYFRB
• POD: Antelope 66kV Bus
5. Expressway Solar A
• SCE
• Capacity: 2 MW
• RES_ID: VICTOR_1_EXSLRA
• POD: Victor 115kV Bus
6. Expressway Solar B
• SCE
• Capacity: 2 MW
• RES_ID: VICTOR_1_EXSLRB
• POD: Victor 115kV Bus
7. Midway Sunset Cogeneration Company – Increase EMS PMax from 234 MW to 2910MW
• PGE
• Capacity: 291 MW
• RES_ID: SUNSET_2_UNITS
• POD: Midway 230kV Bus
8. Mojave Solar Project
• SCE
• Capacity: 250 MW
• Aggregated RES_ID: SANDLT_2_SUNITS
• Child RES_IDs: SANDLT_2_STGA (125 MW)
SANDLT_2_STGB (125 MW)
• POD: Kramer 230 kV Bus
9. Victor Dry Farm Ranch A LLC
• SCE
California ISO – Public
Page 3 of 4
Full Network Model Scope for FNM DB69
Production (4/17/2014), RIMS Cutoff Date (7/1/2014)
•
•
•
Capacity: 5 MW
RES_ID: VICTOR_1_VDRYFA
POD: Victor 115kV Bus
10. White River West
• PGE
• Capacity: 19.8 MW
• RES_ID: OLIVEP_1_SOLAR2
• POD: Olive Switching Station 115kv Bus
11. Windland Refresh I
• SCE
• Capacity: 7 MW
• RES_ID: MIDWD_6_WNDLND
• POD: Winhub 230kV bus
12. Windstream 6040
• SCE
• Capacity: 6.9 MW
• RES_ID: NZWIND_6_WDSTR2
• POD: Winhub 230kV bus
13. Windstream 6041
• SCE
• Capacity: 6 MW
• RES_ID: NZWIND_6_WDSTR3
• POD: Winhub 230kV bus
14. Windstream 6042
• SCE
• Capacity: 6.8 MW
• RES_ID: NZWIND_6_WDSTR4
• POD: Winhub 230kV bus
California ISO – Public
Page 4 of 4