I.Z. EnvironMind Sdn Bhd (IZE) 5.0 PROJECT OPTION There are various project options relevant to the proposed establishment of agriculture (vegetables) plantation project plan to be initiated by TJ Natural Agro Farm (M) Sdn Bhd & Ratus Premium Sdn Bhd (TJRP) will be discussed and analyzed in this report such as project location, hectarage, benefit, impact and no project option. This is to initially identify the suitability of the proposed project site to be undertaken the proposed agriculture (vegetables) plantation project. And the criteria for selecting the options are related to accomplishing the following objectives of the overall proposed project development as listed below. Complementing Federal Government of Malaysia and State Government of Kelantan policy as well as strategy for future development Enhancement of greening pattern of the proposed project site Long term investment and financial strategy of the investment Having the least potential impact to the surrounding existing environment Provide benefit to all parties involve in the proposed agriculture (vegetables) plantation project Cost effectiveness in the overall proposed agriculture (vegetables) plantation project Availability of resources and infrastructure as well as suitability of the land use area Revenue will be gained in short and long term development 5.1 PROJECT LOCATION OPTION As described in Item 4.2 of Chapter 4.0, the proposed project site is located within the forest reserve area known as HSK Lojing based on the Rancangan Struktur Negeri Kelantan 2020 and Rancangan Tempatan Jajahan Gua Musang 2020. And based on the ‘Garis Panduan Pembangunan Kawasan Tanah Tinggi Lojing, 2005’, proposed project site is consists of Class I and II physical development in scattered area. Even though, there is some restriction occurred, the proposed project site has been approved and Perbadanan Pembangunan Ladang Rakyat Negeri Kelantan (PPLRNK) as a landlord with undergone a development agreement with TJ Natural Agro Farm (M) Sdn Bhd and Ratus Premium Sdn Bhd. The project location, which is being surrounded by various neighbouring agriculture plantation (Agridex Sdn Bhd, Liquid Gold Sdn Bhd, All Green Agritech Sdn Bhd, YAKIN and Koperasi Pembangunan Pulau Lumut Berhad) as well HSK Lojing and HSK Sungai Berok, is observed to have a various technical characteristic that make it’s suitable and adequate for undertaking the agriculture (vegetables) plantation activity. The proposed project site which located at the altitude ranged from 620 to 940 meter above sea level (ASL) has an adequate weather condition with day time temperature of 22oC to 26oC. The implementation of proposed agriculture (vegetables) plantation project will keep on maintain the primary objectives set up by the state and federal government in enhancing the agriculture sector as well as implementing the ‘greening of the nation’ programme. It also compliments not only to the state government but also the overall nation initiative in encouraging private agencies involvement in commercial agricultural (vegetables) programme. The used of chosen proposed project site area will also be more cost-effective compare to other type of land use. If other land use type is chosen, the process involve will be tedious, which will result not only delayed the project implementation but also involve a very high project cost. The proposed project site located some 1.6 km away at the north part area from Simpang Pulai-Lojing-Gua MusangKuala Berang highway thus considered near for transporting the seedling, building material, raw material, machine, equipments, pesticide, fertilizers and workers needed for the proposed plantation project activity. Implementation of this proposed agriculture (vegetables) plantation activity is a direct contribution to the environmental conservation effort. Development of this proposed project site area will help the state government agency in controlling and minimizing the illegal encroachment, illegal logging activity, preventing soil erosion, preservation of biological diversity as well as reverse deforestation processes. And due to the location of the proposed project site which is closed to the various Orang Asli community area (Orang Asli Kg Jekjok, Kg Kingkong, Kg Chekau, Kg Brooke and Kg Jedip), it will give an advantage to the project proponent in term of the source of workers needed for the overall proposed Preliminary EIA TJ Natural Agro Farm (M) Sdn Bhd & Ratus Premium Sdn Bhd (TJRP) Page 5-1 I.Z. EnvironMind Sdn Bhd (IZE) agriculture (vegetables) plantation activities. On the other way, the proposed project activity will beneficial the surrounding Orang Asli community in providing the employment, small business opportunity, upgrading of daily life, enhance the infrastructure facility, sharing the latest agriculture technology, increasing value of the surrounding land area, etc. 5.2 HECTARAGE OPTION The 589.381 acres (238.515 hectares) of proposed project site is considered economically feasible for medium scale of proposed agriculture (vegetables) plantation project. Analysis made using the ArcGIS 9, a GIS software on the overall proposed project site revealed that almost 76.086 hectares of area has more than 25o of slope whilst about 11.926 hectares of area has slope more than 35o of slope. According to the Department of Agriculture (DOA), no any development activity can be implemented at area which having slope more than 25o. And based on “Garis Panduan Pembangunan Di Kawasan Tanah Tinggi Lojing, 2005”, no any development can be implemented at all area which having slope more than 35o. It was expected that the proposed project could generate a good return to the project proponent within a short period time, especially taking into consideration the sixty (60) years of leasing period granted from Perbadanan Pembangunan Ladang Rakyat Negeri Kelantan (PPLRNK), where approximately quite a number of rotations as well as vegetables planting exercise can be undertaken and replanted by TJRP. As the proposed agriculture (vegetables) plantation project required a medium investment cost, the proposed project site can be preferred however it is a non-option issue for the project proponent, as the area given is fixed by the State Government of Kelantan. The proposed project success will mark new milestone for the agriculture industry as well as sustainable forest development activity, which could encourage more private sector or may be local or even foreign investor in venturing similar project in State Government of Kelantan area. This will provide a boost to the federal and state government strategy in encouraging private sectors involvement in reforestation and forest rehabilitation activities. In term of environmental conservation, 589.381 acres (238.515 hectares) is considered significant, however it is very much depends on the compliances and also methods of project implementation as well as mitigating measures that are willing to be carried out by the project proponent (TJRP). The proposed project site will function as a carbon sink apart from playing effective roles in water conservation and preservation of genetic resources. It was also expected during the final establishment of the proposed agriculture programme, the proposed site can always be maintained as a green area. It will also contribute socio economically to the nearby local community in provide more business, experience and employment opportunity. 5.3 BENEFIT OPTION The proposed agriculture (vegetables) plantation project is expected to initially generate the net profit income after the third year of overall project implementation to TJRP. A part of that indirect profit is also expected to be received by nearby Orang Asli community area (Orang Asli Kg Jekjok, Kg Kingkong, Kg Chekau, Kg Brooke and Kg Jedip), Lojing, Daerah Bertam but also to the State Government of Kelantan. Information gathered from the officer on-site as well as observation made during various fieldworks exercise revealed that almost 212.5345 acres (86.01 ha) at various scattered area within the proposed project site has partially being developed and planted with vegetables. The agriculture product has great values which can easily being export to local and international market. And with the available easy access from the Simpang Pulai-Lojing-Gua Musang-Kuala Berang highway, the harvested agriculture product can be easily transported out from the proposed project site. It is expected to further enhance the socio economic aspect as well as the infrastructure of the surrounding area which is expected to be accommodated by TJRP to the nearby area. Compared to other industrial sectors or activity that requires large numbers of skilled or semi-skilled workers, the agriculture sector particularly the planting will require labour and workers with minimal skills and experience. This segment of labour force is readily available in Lojing, Daerah Bertam, Gua Musang as well as other part of State Government of Kelantan, which currently is deprived of growth in manufacturing services industry compared to other states in Malaysia. The proposed agriculture (vegetables) plantation project is expected to generate other supporting businesses trade in the Lojing, Daerah Bertam as well as Jajahan Gua Musang area. These are mainly in the form of supply or rental of hardware, machinery, vehicle, equipment spare-part, transportation, fertilizer, pesticide, pastry food, etc. Preliminary EIA TJ Natural Agro Farm (M) Sdn Bhd & Ratus Premium Sdn Bhd (TJRP) Page 5-2 I.Z. EnvironMind Sdn Bhd (IZE) 5.4 IMPACT OPTION In any kind of development there is a potential impact that may occur on the existing environment within and also surrounding of the proposed project sites. Even though without any development occur there were still a potential impact that might occur at the existing proposed project site area which normally being classified as natural event. The potential impact can be direct and indirect approach and also short term and long term impact depending on the overall project implementation as well as effort given by the project proponent. Chapter 7.0 and 9.0 has comprehensively described on the various type of potential impacts that may occur as a result of the overall project implementation. All the identify impact can become very significant if not being properly taken care by the project proponent. And in order to control, minimize and resolve the possible impact, various mitigating measures has been recommended and suggested to be undertaken by the project proponent as highlighted in Chapter 8.0. Most of the recommended mitigating measures can be considered as practical on-site and does not burden the project proponent in providing the financial. As mentioned earlier, the level of potential impact that might occur on the existing environment within and surrounding the proposed project site is very much depend on the willingness and effort contributed by the project proponent. As described in Chapter 8.0 of this report, all the forecasted impacts can be controlled, minimized and resolved provided most of the mitigating measures have been in place at least before the overall project being executed especially those related to the nearby various Orang Asli community area (Orang Asli Kg Jekjok, Kg Kingkong, Kg Chekau, Kg Brooke and Kg Jedip). A part of that, understanding of each potential impact and its mitigating measures as well as overall environmental compliance matter shall be incorporated in every level of management. By doing this, the overall proposed agriculture project can generate more benefit option rather than impact option not only to the project proponent but also to the nearby Orang Asli community area (Orang Asli Kg Jekjok, Kg Kingkong, Kg Chekau, Kg Brooke and Kg Jedip), Lojing, Daerah Bertam, Jajahan Gua Musang, State Government of Kelantan and the whole nation of Malaysia. As commonly known that any developments activity may give some impacts to the environment, but the proposed agriculture (vegetables) plantation project will keep the proposed project site back to normal with green area after a few years of plantation. Hence, it is just a temporary impact to the environment because the proposed project site will be covered with vegetables and also the cover crops. TJRP will ensure that the proposed project site is in a proper maintenance and also fulfill the compliances as required by DOE Negeri Kelantan and also other respective government agencies. In addition, even the agriculture plantation project may give a critical situation includes social justice for local Orang Asli community, the problem can be resolve by taken a few resolution steps from a respectively parties. 5.5 NO PROJECT OPTION Leaving the proposed project site without any proper development will make it very susceptible to potential illegal encroachments which lately become a serious issue in the State Government of Kelantan especially in Lojing and Gua Musang area. The limited manpower of enforcement units from relevant government agency has made much more difficult to control and to resolve the matter. Encroached areas are very difficult to manage and control, normally resulting the area to be alienated to public, or being used for other purposes. And the worst case is the area being exposed to the open burning activity which also known to be one of the biggest problem in State of Kelantan. There are many cases in the past which after many years then the local authority as well as state government were get to know that the area has been illegally being developed either by the individual or group. At this time normally is too late to take the action because damaged has been made and the government has already loss the source of potential revenue that may gathered from the respective area. The ‘no project option’ will also deprive the state government from the much-needed private investment into the agricultural sector to generate the revenue. It will be a lost of opportunity for the surrounding nearby Orang Asli community area (Orang Asli Kg Jekjok, Kg Kingkong, Kg Chekau, Kg Brooke and Kg Jedip), Lojing, Daerah Bertam, Jajahan Gua Musang as well as State Government of Kelantan not only to earn an additional income from the proposed agriculture project but also to gain knowledge, experience, expertise and skills in plantation establishment and management which known to be very rare in Malaysia. A part of that it may slowdown the production of agriculture sector in State Government of Kelantan as well as Malaysia and unable to cope with the local and worldwide high demand thus loss in foreign exchange revenues. And much more Preliminary EIA TJ Natural Agro Farm (M) Sdn Bhd & Ratus Premium Sdn Bhd (TJRP) Page 5-3 I.Z. EnvironMind Sdn Bhd (IZE) important is the State Government of Kelantan has issued the ‘Hak Milik Sementara’ to the various individual landlord which in principle has allow the project proponent to develop the proposed project site. Withdrawing the approval may expose State Government of Kelantan to legal matter which may create lots of difficulties for both parties (State Government of Kelantan and TJRP). 5.6 PROPOSED AND SUGGESTED OPTION It is of the consultant opinion that the proposed project is viable, appropriate and can be considered for the implementation by the project proponent and be beneficial to various parties who direct and indirectly involve in the development. Even though there is a potential environmental impact targeted to be occurred on the existing environment within and surrounding the proposed project site especially during the initial stage of project implementation, it is justified and more on localized as well as can be minimized and controlled provided most of the recommended mitigating measure by the consultant and also guidelines issued by the respective government agencies (DOE Negeri Kelantan, Department of Irrigation & Drainage, Department of Forestry, Pejabat Pengarah Tanah & Galian, Pejabat Tanah & Jajahan Kecil Lojing, Department of Agriculture, Department of Wildlife & National Parks, Department of Health, Department of Occupational Safety & Health, Jabatan Kemajuan Orang Asli, etc.) is being well undertaken by the project proponent. This mitigating measure as well as environmental monitoring exercise is suggested to be made mandatory by DOE Negeri Kelantan to the project proponent to undertake without compromise based on all the PEIA Condition of Approval. A proper Erosion & Sediment Control Plan (ESCP) shall be prepared and submitted by a qualified and competent person for approval from DID Negeri Kelantan. And upon approval all component of ESCP shall be implemented on-site on mandatory basis. Any issue arise pertaining to the community of Orang Asli Kg Jekjok, Kg Kingkong, Kg Chekau, Kg Brooke and Kg Jedip shall be treated seriously and an immediate action shall be taken in order to resolve the respective issue. The project proponent is also suggested to officially assign a permanent and qualified Project Environmental Officer (PEO) on site to cater all the environmental compliance works that required to be undertaken on-site during the whole proposed agriculture development. An immediate action such as heavy penalty and even a court action shall be taken by respective government agencies on any incompliance matter done by the project proponent or other parties involve in the proposed project implementation. In especially remote areas, the agriculture plantation should be asked to be always sensitive on the workers need and also attention must be given on the workers includes their family health care. These steps can help make agriculture production more equitable and environmentally friendly. A part of that, in long term the proposed project will not only beneficial to the nearby Orang Asli community area (Orang Asli Kg Jekjok, Kg Kingkong, Kg Chekau, Kg Brooke and Kg Jedip), Lojing, Daerah Bertam, Jajahan Gua Musang, State of Kelantan but also to the nation especially in sustaining the high quality of greening area. Preliminary EIA TJ Natural Agro Farm (M) Sdn Bhd & Ratus Premium Sdn Bhd (TJRP) Page 5-4
© Copyright 2024 ExpyDoc