ISO A0 841mm x 1189mm PROJECT Approved: SJB STUDENT RESIDENCES Checked: ADT PHASE 10 CLIENT Designer: AC ROOF VOID FROM L TO R: 35Ø MCWS , 20Ø HTG F&R, 35Ø DHWS F AND 22Ø DHWS R TO SECOND FLOOR APARTMENTS ROOF VOID FROM L TO R: 35Ø MCWS, 20Ø HTG F&R, 35Ø DHWS F AND 22Ø DHWS R TO SECOND FLOOR APARTMENTS Project Management Initials: FROM L TO R: 35Ø MCWS, 35Ø DHWS F, 22Ø DHWS R AND 20Ø HTG F&R TO SECOND FLOOR APARTMENTS 35Ø MCWS CONSULTANT HOT WATER CIRCULATING PUMP EXPANSION VESSEL SV EXPANSION VESSEL THERMOSTATIC VALVE ON RETURN AAV CONSTANT FLOW BYPASS VALVE (10% OF BLOCK FLOW RATE) THERMOSTATIC VALVE ON RETURN AECOM 1 New York Street MANCHESTER, M1 4HD +44 (0) 161 601 1700 tel +44 (0) 161 601 1799 fax www.aecom.com SV SV AAV CONSTANT FLOW BYPASS VALVE (10% OF BLOCK FLOW RATE) EDGEHILL UNIVERSITY 42Ø MCWS EXPANSION VESSEL CHECK VALVE NOTES 35Ø MCWS 42Ø MCWS FLUSHING BYPASS HTG MAINS 20Ø HTG F&R H C 42Ø MCWS CHECK VALVE 54Ø MCWS 40Ø HTG F&R HTG TO BLOCK 32Ø HTG F&R FLUSHING BYPASS (NC) H C HTG MAINS H C 40Ø HTG F&R HEATING AND HOT WATER PLATE HEAT EXCHANGER TO SERVE BEDROOMS, STAIRWELL AND KITCHEN 20Ø HTG F&R HTG MAINS 20Ø HTG F&R 28Ø CONDENSATE EXTEND INTO LOCAL POD PLANT CUPBOARD AND CONNECT TO WASTE STACK WITH TUNDISH AND TRAP ARRANGEMENT REFER TO DETAIL 'B' HTG TO BLOCK HTG TO BLOCK HEATING AND HOT WATER PLATE HEAT EXCHANGER TO SERVE BEDROOMS, STAIRWELL AND KITCHEN 1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL OTHER DRAWINGS, SPECIFICATIONS AND SCHEDULES. 2. SERVICES REQUIRING MAINTENANCE OR ACCESS FOR COMMISSIONING PURPOSES TO BE KEPT WITHIN ACCESSIBLE AREAS. 3. FIRE COLLARS SHALL BE FITTED ON ALL PIPEWORK PENETRATIONS THROUGH FLOORS AND FIRE COMPARTMENT WALLS. ALL PENETRATIONS THROUGH FLOORS AND FIRE COMPARTMENT WALLS SHALL BE FIRE STOPPED IN LINE WITH THE ARCHITECT'S FIRE COMPARTMENTATION DRAWINGS. 4. DRAIN COCKS SHALL BE FITTED AT LOW POINTS AND AIR VENTS SHALL BE FITTED AT HIGH POINTS. 5. PIPEWORK SHALL BE INSULATED AS DEFINED IN THE MECHANICAL SPECIFICATION DOCUMENT. 6. THE CONTRACTOR SHALL LIAISE WITH A THERMAL EXPANSION SPECIALIST AND MAKE A SUITABLE ALLOWANCE FOR THE ACCOMMODATION OF EXPANSION WITHIN ALL PIPEWORK SYSTEMS BASED UPON THEIR FINAL DESIGN. 7. THERMOSTATIC BALANCING VALVES TO BE FITTED ON EACH MAIN RETURN HWS BRANCH PIPEWORK FOR COMMISSIONING AND THERMAL DISINFECTION CONTROL. STR 28Ø CONDENSATE EXTEND INTO LOCAL POD PLANT CUPBOARD AND CONNECT TO WASTE STACK WITH TUNDISH AND TRAP ARRANGEMENT REFER TO DETAIL 'B' STR STR QUICKFILL CONNECTION FLUSHING BYPASS (NC) QUICKFILL CONNECTION SECOND FLOOR FROM L TO R: 35Ø MCWS , 20Ø HTG F&R, 35Ø DHWS F AND 22Ø DHWS R TO SECOND FLOOR APARTMENTS FROM L TO R: 35Ø MCWS, 35Ø DHWS F, 22Ø DHWS R AND 20Ø HTG F&R TO FIRST FLOOR APARTMENTS SECOND FLOOR FROM L TO R: 35Ø MCWS, 20Ø HTG F&R, 35Ø DHWS F AND 22Ø DHWS R TO SECOND FLOOR APARTMENTS HOT WATER CIRCULATING PUMP EXPANSION VESSEL SV HOT WATER CIRCULATING PUMP EXPANSION VESSEL SV THERMOSTATIC VALVE ON RETURN SV THERMOSTATIC VALVE ON RETURN EXPANSION VESSEL FROM R TO L: 35Ø MCWS 35Ø DHWS F 22Ø DHWS R 67Ø MCWS FLUSHING BYPASS 35Ø MCWS FROM R TO L: 35Ø MCWS 35Ø DHWS F 22Ø DHWS R HTG MAINS H C CHECK VALVE 20Ø HTG F&R 20Ø HTG F&R 50Ø HTG F&R 65Ø HTG F&R HEATING AND HOT WATER PLATE HEAT EXCHANGER TO SERVE BEDROOMS, STAIRWELL AND KITCHEN 54Ø MCWS HTG TO BLOCK 42Ø MCWS HTG MAINS 32Ø HTG F&R FLUSHING BYPASS (NC) H C HTG MAINS H C 20Ø HTG F&R 28Ø CONDENSATE EXTEND INTO LOCAL POD PLANT CUPBOARD AND CONNECT TO WASTE STACK WITH TUNDISH AND TRAP ARRANGEMENT REFER TO DETAIL 'B' HTG TO BLOCK HTG TO BLOCK CHECK VALVE HEATING AND HOT WATER PLATE HEAT EXCHANGER TO SERVE BEDROOMS, STAIRWELL AND KITCHEN STR 28Ø CONDENSATE EXTEND INTO LOCAL POD PLANT CUPBOARD AND CONNECT TO WASTE STACK WITH TUNDISH AND TRAP ARRANGEMENT REFER TO DETAIL 'B' STR STR FLUSHING BYPASS (NC) QUICKFILL CONNECTION FLUSHING BYPASS (NC) QUICKFILL CONNECTION FIRST FLOOR FROM L TO R: 35Ø MCWS , 20Ø HTG F&R, 35Ø DHWS F AND 22Ø DHWS R TO SECOND FLOOR APARTMENTS FROM L TO R: 35Ø MCWS, 35Ø DHWS F, 22Ø DHWS R AND 20Ø HTG F&R TO GROUND FLOOR APARTMENTS FIRST FLOOR FROM L TO R: 35Ø MCWS, 20Ø HTG F&R, 35Ø DHWS F AND 22Ø DHWS R TO SECOND FLOOR APARTMENTS HOT WATER CIRCULATING PUMP EXPANSION VESSEL SV HOT WATER CIRCULATING PUMP EXPANSION VESSEL SV THERMOSTATIC VALVE ON RETURN SV THERMOSTATIC VALVE ON RETURN EXPANSION VESSEL FROM R TO L: 35Ø MCWS 35Ø DHWS F 22Ø DHWS R FLUSHING BYPASS 42Ø MCWS HTG MAINS H C HTG MAINS CHECK VALVE 32Ø HTG F&R 20Ø HTG F&R 28Ø CONDENSATE EXTEND INTO LOCAL POD PLANT CUPBOARD AND CONNECT TO WASTE STACK WITH TUNDISH AND TRAP ARRANGEMENT REFER TO DETAIL 'B' FROM R TO L: 35Ø MCWS 35Ø DHWS F 22Ø DHWS R HEATING AND HOT WATER PLATE HEAT EXCHANGER TO SERVE BEDROOMS, STAIRWELL AND KITCHEN HTG TO BLOCK FLUSHING BYPASS (NC) H C HTG MAINS H C 20Ø HTG F&R 28Ø CONDENSATE EXTEND INTO LOCAL POD PLANT CUPBOARD AND CONNECT TO WASTE STACK WITH TUNDISH AND TRAP ARRANGEMENT REFER TO DETAIL 'B' HTG TO BLOCK HTG TO BLOCK CHECK VALVE HEATING AND HOT WATER PLATE HEAT EXCHANGER TO SERVE BEDROOMS, STAIRWELL AND KITCHEN STR 20Ø HTG F&R 67Ø MCWS 67Ø MCWS Last saved by: CHILDSA(2014-12-12) Last Plotted: 2014-12-15 Filename: F:\PROJECTS\BUILDING ENGINEERING - EHU RESIDENCES PHASE 8\PHASE 10\MECHANICAL PLANS\SHT-C-000-M-5000.DWG 50Ø HTG F&R Printed on ___% Post-Consumer Recycled Content Paper STR STR 65Ø HTG F&R T T T FLUSHING BYPASS (NC) QUICKFILL CONNECTION ENERGY METER WITH PULSED OUTLET TO BMS AND ND METER ACCESS PANELS REQUIRED WITHIN GROUND FLOOR RISER CUPBOARD TO ALLOW ACCESS TO METERS AND VALVES. EM IV QUICKFILL CONNECTION DC IV IV DC FROM T TO B: - SLEEVED 65Ø (ID) PREINSULATED HTG F&R (200Ø CASING) - 90Ø MDPE MCWS IV IV STR DCV DC DRV/OP ISSUE/REVISION WATER METER WITH PULSED OUTPUT TO BMS AND ND METER WM STR DC ACCESS PANELS REQUIRED WITHIN GROUND FLOOR RISER CUPBOARD TO ALLOW ACCESS TO METERS AND VALVES. EM WATER METER WITH PULSED OUTPUT TO BMS AND ND METER WM FLUSHING BYPASS (NC) QUICKFILL CONNECTION ENERGY METER WITH PULSED OUTLET TO BMS AND ND METER T DC DCV DC PREINSULATED MDPE PIPEWORK TRANSFORM TO COPPER (MCWS) AND STEEL (HTG) DRV/OP IV GROUND FLOOR FROM T TO B: - SLEEVED 75Ø (ID) PREINSULATED HTG F&R (200Ø CASING) - 90Ø MDPE MCWS REFER TO EXTERNALS DRAWING 60287786-SHT-S-U-9000 TYPICAL SINGLE HEATING RISER IN STAIRWELLS. PHASE 10 - 2 No RISERS NTS PREINSULATED MDPE PIPEWORK TRANSFORM TO COPPER (MCWS) AND STEEL (HTG) GROUND FLOOR 1 DEC 2014 TENDER ISSUE I/R DATE DESCRIPTION KEY PLAN REFER TO EXTERNALS DRAWING 60287786-SHT-S-U-9000 TYPICAL DOUBLE HEATING RISER IN STAIRWELLS. PHASE 10 - 2No RISERS NTS PROJECT NUMBER 60321010 SHEET TITLE HEATING AND DOMESTIC WATER SERVICES TYPICAL SCHEMATIC SHEET NUMBER C-M-5000
© Copyright 2024 ExpyDoc