FIRE AND GAS LIFE EXPANSION AND MODIFICATION AUSTRALIA BROWNFIELDS CONFERENCE | PERTH | AUGUST 2014 | GEIR SOLEM 1 AUTRONICA FIRE AND SECURITY • 
A leading innovator, manufacturer and supplier of fire safety equipment • 
Founded in 1957 • 
Employs more than 450 persons • 
ProtecTng life, environment and property • 
First IEC 61508/61511 SIL 2 approved F&G detecTon system in the world 2 DRIVING PERFORMANCE VS SAFETY Utilization
•  As business strives for opTmum economic value through throughput and performance, the plant is pushed to its highest safer operaTng limits •  Probability of failure increases •  Dependence upon Fire ProtecTon systems, people, process and procedures Ope
increases ra6n
g •  Goal: Highest Safety •  Strategy: Loop integrity •  Method: Fault tolerance & Redundancy •  Measurement: Reliability & Availability Availability
3 ECONOMIC LIFE CYCLE OF A PROCESS Plan and
purchase
Install and
commission
Operate and maintain
Cash Flow
Increased plant
performance
AutroSafe SelfVerify®
Time
Classic conventional
Shorter scheduled
outage
Faster Plant
Start-up
Fewer unscheduled outages
Increased up-time
between scheduled outages
4 F&G UPGRADE – WHY CHANGE? • 
IEC 61508 SIL2 (no legacy system opTmized for FuncTonal Safety) • 
More flexible soluTons • 
Increased quality and safety requirements • 
Beder integraTon to top systems (SAS/Safety PLC) • 
Step-­‐wise upgrade opTons (keep exisTng detectors) • 
SelfVerify (automaTc, calibrated tesTng) – reduced tesTng and maintenance 5 AUTROSAFE IFG AUTROSAFE INTEGRATED FIRE AND GAS (IFG) TUV IEC 61508 SIL2 APPROVED SYSTEM 6 AUTROSAFE SELFVERIFY® 7 7 LIVE UPGRADES – CHALLENGES • 
ConTnuous operaTon • 
Old and new system – parallel operaTon • 
Fall-­‐back opTons has to be possible • 
Keep downTme to a minimum – at loop level • 
F&G panel / top system (SAS) communicaTon 8 PROJECT IMPLEMENTATION Loops AutroSafe F&G alarm system w/loop interfaces for connecTon of old detector loops Config Temporary config without detectors Test TesTng of communicaTon between all panels and SAS Upload Pre-­‐made config uploaded Commissioning F&G alarm system ready for changeover 9 PROJECT IMPLEMENTATION Step by step… • 
All BS-­‐100 detector texts exported, processed and uploaded to AutroSafe config. 10 PROJECT IMPLEMENTATION – COMMISSIONING TOOL 11 FROM BS-­‐100 TO AUTROSAFE 12 PROJECT IMPLEMENTATION 13 CONOCO PHILLIPS B11: F&G REPLACEMENT Scope of Work Design of new F&G system New documentaTon Replacement of 322 detectors incl. Flame detectors Supervision of offshore work and responsibity for actual installaTon work As-­‐built documentaTon 14 CONOCO PHILLIPS B11: F&G CABINETS BEFORE (Servoteknikk) AFTER (AutroSafe) 15 CONOCO PHILLIPS B11: LOOP DRAWINGS Flame detectors Smoke/Heat/MAC 16 BORGLAND DOLPHIN: BS-­‐100 TO AUTROSAFE • 
BS-­‐100 to AutroSafe upgrade project. • 
Scope of Work similar to B11; System design, F&G Cabinet engineering, documentaTon incl. Loop drawings. • 
Autronica was not responsible for the installaTon. • 
Use of BS-­‐100 adapter socket/plate. • 
Flame and Gas integrated to AutroSafe via 4-­‐20mA interface cards. • 
Detector count (for replacement) : 109 ea. Gas (HC and H2S) 6 ea. Flame 422 ea. Smoke/Heat/MCP 17 BORGLAND DOLPHIN: CONTROL ROOM 18 BORGLAND DOLPHIN: PROJECT IMPLEMENTATION • 
Old cabinet moved, but sTll funcTonal. New AutroSafe cabinet installed and commissioned towards SAS. • 
CommunicaTon between AutroSafe and SAS verified and tested. • 
Loops gradually transferred to AutroSafe, by creaTng loop breaks and changing to new AutroSafe detectors – 5 at a Tme. • 
Every day was completed by commissioning and tesTng new detectors and verifying placement in SAS. • 
PlaHorm always protected. 19 BORGLAND DOLPHIN: F&G CABINETS BEFORE (BS-­‐100) AFTER (AutroSafe) 20 F&G UPGRADES: COMMON CUSTOMER CHALLENGES • 
ConnecTon boxes (JB’s) for detectors (open hidden above ceiling). • 
Faults or missing informaTon in current (old) documentaTon. Might require changes in the field. • 
EX equipment connected to non-­‐cerTfied equipment. • 
Consumables like cable glands, blind plugs, cables, JB’s etc are not taken into consideraTon while planning. • 
Resources, more resources à faster execuTon 21 F&G UPGRADES TO AUTROSAFE – CUSTOMER FEEDBACK • 
A fully IEC 61508 SIL2 cerTfied system • 
Flexible changeover -­‐ funcTonality maintained • 
Controlled, scheduled replacement • 
Minimal downTme and minimal expenses for correcTve measures • 
Minimal disrupTon to daily operaTons • 
Significantly reduced requirements for manual tesTng/maintenance • 
Beder integraTon to SAS top system • 
Easier updates 22 23