English CV - Cesare Rovaldi Personal Website

CURRICULUM VITAE
ROVALDI CESARE
DATE OF BIRTH
:
11 February 1962
NATIONALITY
:
Italian
EDUCATION
:
Industrial Mechanic Technician -1981
Industrial mechanic high school
IPSIA “CALZECCHI” Senigallia (AN)
LANGUAGES
:
Italian
English
– mother tongue
– intermediate
EXPERTISE
:
Piping design
CURRENT POSITION
:
Senior piping designer
_________________________________________________________________
Personal profile:
Employed in ENERECO as Senior piping designer since (1998). Previous
experience acquired in various piping engineering companies since 1984 as
draftsman and piping designer.
Computer skills:
Operating systems
Application software
Calculation software
: Windows
: Autocad, Microstation, PDMS(knowledge),
Word
: Excel
Training and specialization courses
PDMS (by Aveva Italy)
Nome File: CV-ROVALDI-ENG.doc
Page 1 of 8
CURRICULUM VITAE
ROVALDI CESARE
Work experience:
2012
Project
:
REVAMPING OF THE SANNAZZARO - ENI GROUP
REFINERY - ITALY
Site surveys and design of mechanical works for the
revamping of various refinery units.
2011
Client
:
ENI Refining & Marketing (ITALY)
Position
:
Senior piping designer
Activities :
client liaison, site survey, project development.
Project
BASIC ENGINEERING DESIGN WATER INJECTION
UPGRADE PROJECT
-ATYRAU - KAZAKHSTAN
:
Basic and detailed design (using AUTOCAD) of water
injection project inside CHEVRON TCO area in ATYRAU
and TENGIZ Field
2010
Client
:
CHEVRON TCO (KAZAKHSTAN)
Position
:
Project Specialist Leader on site
Activities :
client liaison, site survey, project development.
Project
BASIC ENGINEERING DESIGN FOR PROCESS
TRAINING PLANT
-ATYRAU - KAZAKHSTAN
:
Basic and detailed design (using AUTOCAD) of gas process
training plant inside AGIP KCO area in ATYRAU TRAINING
CENTER
2009
Client
:
ENI AGIP KCO (KAZAKHSTAN)
Position
:
Project Specialist Leader on site
Activities :
client liaison, project development.
Project
REALIZATION HPRS & LAUCHING/RECEIVING
PIG TRAPS - GENOVA - ITALY
:
Surveys and design (using PDMS) of pressure reduction
systems, gas distribution and cleaning systems (pressure
reduction and filtering system, launching and receiving
traps, branch points).
Client
:
SNAMRETEGAS ENI GROUP (ITALY)
Position
:
Senior piping designer
Activities :
Survey, client liaison, project development.
Nome File: CV-ROVALDI-ENG.doc
Page 2 of 8
CURRICULUM VITAE
ROVALDI CESARE
2008
Project
:
TANK FARM CONNECTION
CIVITAVECCHIA-PANTANO-SERAM - ITALY
Site surveys and mechanical works needed to transfer the
product from the tank farm to the airport. Installation of
filtering units in the Civitavecchia and Pantano tank farms.
2008
Client
:
PRAOIL ENI GROUP (ITALY)
Position
:
Senior piping designer
Activities :
Survey, client liaison, project development.
Project
LINE CLASSIFICATION
FERRARA – ITALY
:
FOR
STOGIT
PLANTS
Site survey of lines larger than 2”, line classification
according to the product and degree of hazard, preparation
of line lists.
2007
Client
:
STOGIT ENI GROUP (ITALY)
Position
:
Senior piping designer
Activities :
Survey, client liaison, classification lines.
Project
REALIZATION OF THE 1ST TRAIN FOR THE
DESALTER UNIT OF BIN RAMAA NORTH ALGERIA
:
Site surveys and design of the oil desalter unit (installation
of no. 2 desalters (1st and 2nd stage), oil and water pumps
for the desalting process, connection to existing pipes and
separator).
Client
:
AGIP-SONATRACH (ALGERIA)
Position
:
Senior piping designer
Activities
:
Survey, client liaison, project development.
Nome File: CV-ROVALDI-ENG.doc
Page 3 of 8
CURRICULUM VITAE
ROVALDI CESARE
2006
Project
:
ADDITIONAL DEVELOPMENT OF
SUBBA OIL FIELD PROJECT - IRAK
LUHAIS
&
Basic and detailed design of two reservoir fields in Iraq
having a total oil production of 250,000 bbl/day.
2005
Client
:
SCOP (IRAK)
Position
:
Senior piping designer
Activities :
Project development.
Project
DUKHAN FIELD & MESAIEED TANK FARM DOHA (QATAR)
:
Surveys carried out in the Dukhan Field for various
mechanical works and replacement of the ND 3” oil pipeline.
Surveys and design of the tank farm and pumping station in
the storage area of Mesaieed.
2004
Client
:
QATAR PETROLEUM (QATAR)
Position
:
Senior piping designer on site
Activities :
Survey, client liaison, project development on site
Project
WATER TREATMENT PLANT AND STORAGE
TANKS INSTALLATION – VENICE - ITALY
:
Surveys and design of the water treatment plant of the Fuel
Tank Farm of Venice.
2003
Client
:
PETROVEN ENI GROUP (ITALY)
Position
:
Senior piping designer
Activities :
Survey, project development.
Project
BRASS TERMINAL-GUN BARREL PUMP
INSTALLATION - NIGERIA
:
Design activities for the installation of booster pumps used
to distribute oil from tanks to the existing lines.
Client
:
NAOC (NIGERIA)
Position
:
Senior piping designer
Activities :
Project development.
Nome File: CV-ROVALDI-ENG.doc
Page 4 of 8
CURRICULUM VITAE
ROVALDI CESARE
2003
Project
:
REVAMPING OF MEDAVOX CHEMICAL PLANT
PESCARA - ITALY
Prefabrication of pipes, pipe erection and hydraulic test for
the sodium perborate plant (detergent).
2002
Client
:
DEGUSSA-MEDAVOX (GERMANY- ITALY)
Position
:
Construction Assistant
Activities :
Supervisor on site
Project
EN NAGA NORTH & WEST FIELD DEVELOPMENT
CENTRAL PROCESS FACILITIES- LIBYA
:
Design and construction of a CPF and 100 km long ND 12”
oil pipeline. The CPF was complete with LP and HP
separating units, stripping column, heater, coalescing plant,
storage area and pipeline pumping plant.
2001
Client
:
PIRECO (TUNISIA)
Position
:
Senior piping designer
Activities :
Project development.
Project
DUKHAN FIELD GAS LIFT PROJECT - QATAR
:
Design activities for various gas treatment and distribution
plants, manifolds, HP and LP separating and compression
units, gas heating systems, launching and receiving pig
stations, metering, storage and pumping stations.
2000
Client
:
QPC (QATAR)
Position
:
Senior piping designer
Activities :
Project development.
Project
HIGH PRESSURE REDUCING SYSTEMS &
LAUNCHING / RECEIVING PIG TRAPS - ITALY
:
Surveys and design of pressure reduction systems, gas
distribution and cleaning (pressure reduction and filtering
system, launching and receiving traps, branch).
Client
:
SNAMRETEGAS ENI GROUP (ITALY)
Position
:
Senior piping designer
Activities :
Survey, client liaison, project development.
Nome File: CV-ROVALDI-ENG.doc
Page 5 of 8
CURRICULUM VITAE
ROVALDI CESARE
1999
Project
:
GAS SUPPLY TO BET/OMPADEC/PHRC- NIGERIA
Design and construction of a fuel gas supply system,
including three ND 6” distribution pipelines and gas
treatment facilities (gas separator, pressure reducing
system, metering system, control system etc).
1998
Client
:
SNAMPROGETTI ENI GROUP (ITALY)
Position
:
Senior piping designer
Activities :
Project development.
Project
VARIOUS LAUNCHING & RECEIVING
PIG TRAPS - ITALY
:
Surveys and design of gas distribution plants (launching and
receiving pig traps).
1997
Client
:
SNAMPROGETTI ENI GROUP (ITALY)
Position
:
Senior piping designer
Activities :
Project development.
Project
BAB-MAQTA-TAWEELAH GAS PLANTS - UAE
:
Design activities for various gas treatment and distribution
plants, manifolds, separating and compression units,
launching and receiving pig stations, metering, storage and
pumping stations.
1996
Client
:
SAIPEM / SNAMPROGETTI ENI GROUP (ITALY)
Position
:
Piping designer
Activities :
Project development.
Project
ALRAR-HASSIR’MEL PLANTS - ALGERIA
:
Design supervision activities and isometric drawings for a
gas treatment and distribution plant, pipe spool for
transportation, and spool for the hydraulic test.
Client
:
BENTINI / SOFREGAZ (ALGERIA)
Position
:
Piping designer
Activities :
Project development.
Nome File: CV-ROVALDI-ENG.doc
Page 6 of 8
CURRICULUM VITAE
ROVALDI CESARE
1995
Project
:
CAPROLACTAM PLANT - CHINA
Complete design of the caprolactam plant in jacketing pipe.
1994
Client
:
TECHNIPETROL (ITALY)
Position
:
Piping designer
Activities :
Project development.
Project
BONNY GAS PLANT - NIGERIA
:
Design and construction of fuel gas supply system, including
14 km of duplex stainless steel ND 4” pipeline and gas
treatment facilities (slug catcher, gas separator, pressure
reducing system, etc).
1993
Client
:
SNAMPROGETTI ENI GROUP (ITALY)
Position
:
Piping designer
Activities :
Project development.
Project
DESALINATION PLANT OF BRINDISI - ITALY
:
Design of a desalination plant complete with filtering units,
vessels, distribution pumps.
1992
Client
:
SNAMPROGETTI ENI GROUP (ITALY)
Position
:
Piping designer
Activities :
Project development.
Project
REVAMPING OF THE ANCONA REFINERY - ITALY
:
Site surveys and design of mechanical works for the
revamping of various refinery units.
1990 - 1991
Client
:
ASS. PETR. ITALIA (ITALY)
Position
:
Piping designer
Activities :
Survey, client liaison, project development.
Project
VARIOUS INDUSTRIAL PLANTS, PETROCHEMICAL
& GAS PLANTS – ITALY
:
Site surveys and design of mechanical works for the
revamping of various refinery units. Site surveys and design
of launching and receiving pig stations.
Client
:
SNAMPROGETTI, API, TECHNIPETROL (ITALY)
Position
:
Piping designer
Activities :
Survey, client liaison, project development
Nome File: CV-ROVALDI-ENG.doc
Page 7 of 8
CURRICULUM VITAE
ROVALDI CESARE
1987 - 1989
Project
:
VARIOUS INDUSTRIAL PLANTS, GAS PLANTS &
STRUCTURES, SUPPORTS - ITALY
Design of launching and receiving pig traps. Modular cabs
for turbogenerators, supports for petrochemical plants.
1986
Client
:
SNAMPROGETTI, INSO (NUOVO PIGNONE), FOCHI
ENGINEERING - ITALY
Position
:
Piping designer/ Technical draftsman
Activities :
Client liaison, project development
Project
WASTE WATER TREATMENT &
GARBAGE DISPOSAL PLANTS - ITALY
:
Gridding, nitrification and oxidation vessels, decanting
basins, raw sludge thickener, digester and disposal.
Collecting pool, heater, fume filter, stack, installation of a
turbogenerator for the distribution of electrical power and
heat to users.
1985
Client
:
Position
:
SNAMPROGETTI - ITALY
Piping designer/ Technical draftsman
Activities :
Design
Project
ASSIR
PROJECT
WATER
PIPELINE
DESALINATION PLANT – SAUDI ARABIA
:
&
Water pipeline, 100 km long, with a desalination plant, no. 2
pumping stations and storage tanks.
1984
Client
:
Position
:
CONSORTIUM SAIPEM–CAT-TEKFEN (SAUDI ARABIA)
Technical draftsman on site
Activities :
Survey, design
Project
VARIOUS TECHNICAL DESIGN ACTIVITIES
(P&I D, STANDARDS, ASSEMBLIES)
:
Drafting activities (piping & instrument diagrams, standards,
assemblies, piping layouts, plot plans, etc.).
Client
:
Position
:
Activities :
SNAMPROGETTI
Draftsman
Piping design.
Nome File: CV-ROVALDI-ENG.doc
Page 8 of 8