INSTALLATION INSTRUCTIONS KRAIBURG KKM LongLine / KIM LongLine / KE LongLine prerequisites: for animal well-being some litter is necessary to absorb moisture (e.g. soft milled straw or mineral material) mats: even temperature: minimum 5° C to maximum 30° C (store according to initial temperature) concrete area: • smoothed • clean • with at least 3 % slope You will need this: measuring: cutting: marking: or or drilling and installing: KRAIBURG fastening elements: • nail plugs ø 10 x 80 mm - A2 or • washers ø 30 mm - A2 or (or fastening elements with at least the same resistance and durability) 1 Roll out continuous rolls chamfer rear concrete edge: minimum 3 cm distance! 2 Fastening start in the middle and alternately work towards the right and to the left fasten at the front edge through the prefabricated fastening points: If there are no fastening points, fasten at the front approx. every 40 cm, with a distance of 5 cm from the edge drilling Appropriate installation may differ due to local conditions. Therefore the manufacturer is not liable for installation! pound the plastic plugs in flush pound in nails and washers until they are seated evenly fast and are slightly countersunk 09/2013 Legal basis is the German version of the document. Gummiwerk KRAIBURG Elastik GmbH & Co. KG, Göllstr. 8, 84529 Tittmoning, Germany Tel. +49/8683/701-303, Fax +49/8683/701-190, e-mail: [email protected], www.kraiburg-elastik.com
© Copyright 2024 ExpyDoc