VINYL-TACK D712 FEEZE/THAW STABLE VINYL FLOORING ADHESIVE PRODUCT DESCRIPTION STAUF D712 is a highly specialized flooring adhesive that is designed specifically for the installation of vinyl types of flooring (LVT, VCT, LVP, SVT) . It has a superior green tack with very high shear strength. It is very installer friendly due to its long open time. STAUF D712 is non-hazardous, and is freeze/thaw stable making it ideal for colder climates. Due to the "green properties", STAUF D712 is eligible for LEED points. PRODUCT FEATURES General Features: Installation Features: Long Term Features: • • • • • ow odor • Cleans with warm water and soap • x ellent spread rate • on open time • preads easily • i her temp will shorten drying time • o ris o sensiti ation • esistant a ainst a in • o health ha ards uali ied on lamma le one riendly A-dispersion ase cleans with water • Free e thaw sta le Flash Time (wet lay): • 5 min. 0˚F 21˚C PRODUCT USAGE Approved Flooring: Approved Primers: Approved Trowels: • heet inyl (homogeneous or foam backing) • heet inyl (structured back) • inyl tiles and lan s (VCT, LVT, LVP, SVT) • rimer is normally not re uired • AUF A -200 Eco-Prime • mooth a Floorin Trowel #1: 11 x11 x11 up to 1 0 F al • ou h a ed Floorin Trowel #2: 18 x18 x11 up to 90 F al Approved Sealers: • Approved Sub Floors: • Con rete sla s • lywood Particle or Chipboard (underlayment grade) • ld loors with adhesi e residues, sanded • Cured e elin Compounds • adiant heated su loors AUF AC -210 True Seal Approved Leveling Compounds • AUF F -520 ui Floor at h • AUF C-540 Self Leveling Compound • AUF FF-5 0 ui Feather Float Open Time (wet lay): • 50 min. 0˚F 21˚C Packaging Size: •1 •4 allon plasti pail allon plasti pail Shelf Life: • 12 months in ori inal unopened container VINYL FLOORING ADHESIVE VINYL-TACK D712 INSTALLATION PROCEDURE LIMITATIONS Pre-Installation Checklist: A successful installation requires proper preparation of the sub floor. Read and understand all applicable guidelines and technical data sheets before beginning installation. Follow industry standards and flooring manufacturer’s recommendations for sub floor moisture content, design, layout and application of flooring materials. All slab constructions must meet the specific requirements of the floor covering to be installed. When using other than Stauf products in combination with Stauf primers, sealers, leveling compounds, or adhesives, we deny any and all responsibility for any ensuing problems and/or damages without prior written permission from Stauf. Sub Floor Examination: Prior to installation, the sub floor must be checked according to applicable installation guidelines. It must be solid and sound, flat, permanently dry, clean, free of chaps, indentations and anti-adherents, as well as resistant to pressure and tension. Moisture content of all floors must be measured before installation. This adhesive will maintain its integrity and performance even when higher levels of moisture are present. While adhesive can withstand up to 8#/24 hrs/1,000 SF (Calcium Chloride Test) and 85% RH (in situ probe) of moisture, it does not qualify as a moisture inhibitor. If a moisture barrier is required, please see Approved Sealers under Product Usage on front of page for recommended sealers. Sub Floor Preparation: Depending on type and condition of sub floor, a mechanical treatment (e.g. mechanical brushing, grinding or sanding) may be required. Intensity of such work must be determined at the site by the installer. Dust, paint, residual adhesives or other surface pollution must be removed by suitable means. Cleaning the surface with an industrial vacuum cleaner is recommended. Cracks and gaps must be filled with concrete crack filler unless they are expansion joints. Level when necessary to 3/16 inches within 10 feet. Heated sub floors must be primed. ADHESIVE PROPERTIES Installation: Spread the adhesive with the appropriate notched trowel. Avoid excessive adhesive thickness by passing the trowel evenly through the adhesive at a 60 degree angle. Observe the appropriate flash time (if applicable). Lay the flooring into the adhesive, correctly position it and press down firmly. Be sure to check the back of the flooring to make certain good adhesive transfer from floor to flooring is accomplished. Roll flooring approx. 15-30 min after installation with a 75-100# roller. Push down raised edges approx. 30-60 min after installation. In case of accident, injury, spill or exposure, see MSDS sheet for information. Consult technical data sheet at www.staufusa.com for updated information. Cure Time until Normal Traffic • Approximately 24 hours Clean-up • Use soap and water Temperature Range During Installation • 50˚ - 90˚F Relative Humidity Range During Installation • 30% - 80% Weight (lbs./gal.) • 10.2 Color • Cream USAGE & ACCIDENT INFORMATION Please refer to our technical data sheet and MSDS for information. See website at www.staufusa.com . www.staufusa.com • 1.866.GLUE USA (1-866-458-3872) 0512
© Copyright 2024 ExpyDoc