Engineering for SH Operations Voith’s new StreamDiver® technology StreamDiver | B Murtha, NWHA Sisters Oregon | 2014-09-04 1 97% of existing dams in the US are not used for hydropower and similarly with 85% worldwide. Today the investment costs and projected operating costs are too high for attractive new development. Tough environmental regulations prolong the approval process and upfront increase the investment costs. StreamDiver | B Murtha, NWHA Sisters Oregon | 2014-09-04 2 Utilizing New Hydro Power Potential Hydro Power Potential Innovative Plant Concepts New Requirements for E+M Equipment • submersible design • limited accessibility • low maintenance • oil free solutions • ‘Set-and-forget’ StreamDiver | B Murtha, NWHA Sisters Oregon | 2014-09-04 3 Contents Technical highlights Plant concepts Proof of concept Expected operations and maintenance StreamDiver | B Murtha, NWHA Sisters Oregon | 2014-09-04 4 Potential Sites • Irrigation canals • Undeveloped / underdeveloped dams (marginally feasible) • Remote locations • Modernization of decommissioned plant • Complete unit replacement • Aesthetic restrictions StreamDiver | B Murtha, NWHA Sisters Oregon | 2014-09-04 5 Key Operational Features • No powerhouse • Minimized ancillaries • Standardized sizes Basic Design Philsophy of the StreamDiver: Fewer moving parts means fewer potential failure points. StreamDiver | B Murtha, NWHA Sisters Oregon | 2014-09-04 6 The StreamDiver Concept 2 1 3 2 4 5 1 Permanent magnet generator • Water-floated 2 Thrust and guide bearings • Water-lubricated 3 Turbine bulb • Water-filled • No dynamic seals 4 Turbine housing with fixed guide vanes 5 Propeller runner High availability, low maintenance and minimal peripheral systems StreamDiver | B Murtha, NWHA Sisters Oregon | 2014-09-04 7 Standardization Modular concept with 5 different runner diameter • Runner diameter between 790mm – 1310mm • Overlapping application range • Best combination of StreamDiver module and no. of units based on project specific hydraulic data Flow[cfs] 450 70 6 Head [ft] 30 StreamDiver | B Murtha, NWHA Sisters Oregon | 2014-09-04 8 Grid Connection Variants PMG PMG Grid Direct grid connection: • Synchronization by draft-tube gate • High efficiency • No flow rate or reactive power regulation Grid Grid connection with reactive power regulation: • Reactive power regulation possible • High efficiency • No flow rate regulation Grid Grid connection with frequency converter: • Reactive power regulation possible • Flow regulation via variable-speed operation • Efficiency optimization possible CB CB C PMG CB FC StreamDiver | B Murtha, NWHA Sisters Oregon | 2014-09-04 9 Contents Technical highlights Plant concepts Proof of concept Expected operations and maintenance StreamDiver | B Murtha, NWHA Sisters Oregon | 2014-09-04 10 Flexible Power Plant Integration The plant configuration process will be influenced by local site condition, the owner/operater and local regulations. StreamDiver | B Murtha, NWHA Sisters Oregon | 2014-09-04 11 Development aSisters flood-regulating weir with StreamDiver. StreamDiver | B Murtha,of NWHA Oregon | 2014-09-04 12 StreamDiver | B Murtha, NWHA Sisters Oregon | 2014-09-04 13 The turbines are integrated within a movable frame and regulated (grid synchronization and shut-down) with a gate valve. StreamDiver | B Murtha, NWHA Sistersturbine Oregon | 2014-09-04 14 Both gate and turbine can be retrieved for maintenance works without dewatering of the intake chamber. StreamDiver | B Murtha, NWHA Sisters Oregon | 2014-09-04 15 Development ecologically sensitive regions with the StreamDiver StreamDiver | B Murtha,of NWHA Sisters Oregon | 2014-09-04 16 StreamDiver retrieval. StreamDiver | B Murtha, NWHA Sisters Oregon | 2014-09-04 17 Contents Technical highlights Plant concepts Proof of concept Expected operations and maintenance StreamDiver | B Murtha, NWHA Sisters Oregon | 2014-09-04 18 Full Scale Prototype Nussdorf • R&D Project between Voith/Kössler, Verbund, EVN and Wienstrom • Exchange of existing 500 kW turbine by a StreamDiver • Operating experience since August 2012 with direct grid connection and frequency converter application StreamDiver | B Murtha, NWHA Sisters Oregon | 2014-09-04 19 Component Tests Hydraulic Development: • Model tested hydraulic profiles • Currently model test for a new hydraulic profile ongoing Bearing Test Rig: • Test of bearing concept and lifetime • Service intervals of bearings investigated within an 16.000 h operating period StreamDiver | Hydroenergia 2014 | 2014-05-22 20 Contents Technical highlights Plant concepts Proof of concept Expected operations and maintenance StreamDiver | B Murtha, NWHA Sisters Oregon | 2014-09-04 21 Known and expected maintenance • Pilot has been in operation continuously* for 16,000 hours – * One plant load rejection shut down unit • Expected maintenance – Continuous operation expected – 5 year cycle for unit inspection to inspect / replace wear elements (bearing pads, shaft ends) – 50+ years expected lifetime StreamDiver | B Murtha, NWHA Sisters Oregon | 2014-09-04 22 StreamDiver | B Murtha, NWHA Sisters Oregon | 2014-09-04 23
© Copyright 2025 ExpyDoc