QSE Balcony Quote Example 2014

Luke O’Neill
Registered builder DBL 31305
Suite 2 80 Station St Somerville 3912
ABN 72 081 651 156
Mob 0409101069 [email protected]
Date:
Quote Q001
12 April 2014
Customer Name.
Peter Needle
Mobile 0431 438 888
Service Address.
62 Randall Av Glen Waverley
Email:
[email protected]
Home
Quote valid for 60 days from date above. There is no allowance for removal of asbestos unless clearly stated below.
Scope of Works
Tiled Balcony 2.0m x 1.2m approx
Current tiled balcony is leaking water into soffit below. Substrate has collapsed in parts.
No compliant upstand at doorway. The fitting of a trafficable membrane instead of tiles
will create a small upstand at doorway.
• Fit drop sheets to floor inside as required. Tape up door frames and sills
• Remove and dispose of tiles/screed and substrate.
• Remove balustrading to be able to be reused. Store on site.
• Prepare joists (no allowance for replacement or repairs to joists), laminate
MGP10 Treated Pine to joists to improve fixing, screw and glue Scyon Secura
to joists.
• Rebate alumium drip flashing to end of sheeting.
• Inject polyurethane under sill to seal to frame and sheeting
• Fit cement sheet skirting to walls approx 80mm high to allow membrane to
return up wall. Clean balcony ready for membrane.
• Prime and fit customer selected glass topped trafficable membrane to
sheeting
• Hose test the balcony to ensure watertightness.
• Re-fit handrail.
• Remove all work associated debris.
• Provide 10 year guarantee on waterproofing works
• Soffit works maybe required and will be assessed during works.
Note: We cannot guarantee that during works, damage will not be caused to ceiling plaster below and or
surrounding balcony walls though all care will be taken not to cause damage. Any damage caused that
requires repairs will become a quoted variation subject to customer approval. It should also be noted that
works are to balcony floor ONLY and water ingress from sills, walls, frames, flashings, roofs, cavities and
gutters unrelated to these works may be allowing water into house also. If membrane passes water testing,
this will trigger works to continue and it is important for you to know that requests to delay or stop works
may trigger a variation to works of $150.00 per day we are prevented from finishing works. Our guarantee
only applies to elements we fitted and obviously we cannot guarantee other building elements installed by
others or how they may affect our works and guarantee.
All quotes above $5,000.00 require a building contract and if over $12,000 also require HWI. Any works required or requested that are not listed above with become
a quoted variation.
WORK WILL BE DISCONTINUED UNLESS PAYMENT REQUIREMENTS ARE MET. I/WE
THE UNDERSIGNED CUSTOMER HEREBY REQUEST YOU TO PERFORM THE
SERVICES SET OUT ABOVE.
Name
__________________________________
Signed
_______________________________
Date
____________________________________
Progress Payment 1 of $ is due upon completion of demolition works.
Progress payment 2 of $ is due upon completion of membrane works.
Final payment of upon completion of all works is $
Payments to be made within 3 business days of when stage completed. Invoices for
payments will become receipts once paid.
$
Subtotal
GST
$
Total Including GST
$
Deposit & Materials prepayment $Required for
acceptance of quote and scope of works