AF Military Munitions Response Program Integrity-Service-Excellence Joint Base Charleston – Weapons MMRP RI and IRA Project Update 14 May 2014 Presentation Agenda Introduction JB CHS-Weapons MMRP Overview Current Document Schedule Completed Documents Fieldwork Progress Diving Operations Overview Fieldwork Concerns Questions/Comments Integrity-Service-Excellence 2 JB CHS-Weapons MMRP Overview Integrity-Service-Excellence 3 MRS ID MRS Name MRS Acreage CSE Phase II EE/CA and Action Memo Interim Removal Action RI Field Activities RI Report FS Report DMT, Public/Tech Support, AR/IR Proposed Plan/Decision Document JB CHS-Weapons MMRP Overview SWMU 20 South Annex Munitions Washout 4 SWMU 22 Old South Annex Possible Munitions Disposal Area 3 SWMU 25 Old South Annex Munitions Disposal Area: Water Range & Unexploded Area (Only) Burial Areas 1 and 2 and Parking Lot (Only) 20 SWMU 79 South Annex Marsh Dumping Area 4.5 SWMU 81 Southside EOD Training Area 4 SWMU 82 Old M-79 Grenade Range 1 Southside Borrow Pit 1 9 AOC L AOC N AOC P South Annex Potential Munitions Disposal Area Along Rail Trestle Northside Small Squad Training Area 31 Integrity-Service-Excellence 4 Current Document Schedule Document Statement of Basis AOC P (Draft Final) IRA Abbreviated MRS-Specific Summary Documents2 (SWMUs 20, 25 [Burial Area 1 and 2], 79, 81, 82, AOCs L & N) Site Specific Final Report (IRA Report) (SWMUs 20, 25 [Burial Area 1 and 2], 79, 81, 82, AOCs L & N) 1 2 Reviewer USACE JB CHS SCDHEC Done Done May1 April-June May-June May-July August September October Delayed based on AFLOA notice to proceed with Draft Final (April 2014) MEC investigation results documented and reported for stakeholder review prior to completing RI MC sampling fieldwork Integrity-Service-Excellence 5 Completed Documents Document CSE Phase II Report EE/CA RI Work Plan RI Work Plan Addendum IRA Work Plan Diving Operations Plan (Appendix I of RI and IRA Work Plans) Integrity-Service-Excellence 6 Fieldwork Progress (SWMU 20) • Visual survey and surface clearance (complete) • Subsurface MEC investigation of target anomalies is underway (weekends only due to proximity to SPAWAR facilities) • No MEC, MD, or RRD identified during visual survey/surface clearance; all debris was nonmunitions-related debris (NMRD) Surface Clearance Integrity-Service-Excellence 7 Fieldwork Progress (SWMU 22) • Visual survey and surface clearance (complete) • Subsurface MEC investigation of target anomalies (complete) • No MEC, MD, RRD identified; all debris was NMRD • No finds (23) replaced with alternative digs. Surface clearance completed before reacquisition. Other target anomalies found to be associated with utilities, guardrail, etc. Integrity-Service-Excellence Subsurface Investigation 8 Fieldwork Progress (SWMU 25) (Unexploded Area) • Visual survey and surface clearance (complete) • Digital geophysical mapping (complete) • Subsurface MEC investigation of target anomalies (complete); 7 no finds replaced • Unsurveyable areas due to unstable piles of construction debris • No MEC, MD, or RRD identified; all debris was NMRD Surface Clearance Subsurface Subsurface Investigation Investigation Integrity-Service-Excellence 9 Fieldwork Progress (SWMU 25) (Burial Area 1/Parking Lot) • Visual survey and surface clearance (complete) • Subsurface investigation of target anomalies in Parking Lot and Burial Area 1 (not yet complete) • No MEC, MD, RRD identified to date; all debris has been NMRD • Trying to minimize impact on SDDC shipping operations Integrity-Service-Excellence Subsurface Investigation 10 Fieldwork Progress (SWMU 25) (Burial Area 2) • Visual survey and surface clearance (complete, except for potential fuze masses) • Subsurface investigation (not yet complete) • Initial Mk I fuze demolition completed • Large buried masses of potential fuzes identified in tidal zone but unable to remove under current ESP and conditions (response to be determined) Surface Clearance Integrity-Service-Excellence 11 Fieldwork Progress (SWMU 79) • Visual survey and surface clearance (complete) • Subsurface investigation of target anomalies (complete) • No MEC, MD, RRD identified; all debris was NMRD • Evidence of burial/disposal not munitionsrelated (scrap metal, construction debris) Surface Clearance Subsurface Investigation Integrity-Service-Excellence 12 Fieldwork Progress (SWMU 81) • Visual survey and surface clearance (ongoing) • MD and RRD has been identified • Demolition of inert fuzes and training shapes (5-inch Mk 64, 155mm projectile, Mk 81, Mk 82, Mk 83, M117s, and 50-series mine shapes) that required venting • Coordinating with Weapons Safety to conduct demolition activities while munitions storage area vacant Integrity-Service-Excellence 13 Fieldwork Progress (SWMU 82) • Visual survey and surface clearance (complete) • Subsurface MEC investigation of target anomalies (complete) • MD (40mm practice grenade and indeterminate frag) and RRD (target vehicle) removed • Potential MEC (5-inch projectile) identified outside MRS boundary, JB CHS EOD removed Surface Clearance Subsurface Investigation Integrity-Service-Excellence 14 Fieldwork Progress (AOC L) • Visual survey and surface clearance (complete) • Subsurface MEC investigation of target anomalies (complete) • No MEC identified. MD and RRD primarily removed from a 2.5-3.0 foot pile (5,500lbs. RRD & 1,500lbs. MD) • RRD: ammunition containers, crates, cradles, etc. • MD: frag, M1A2 practice grenade components, fuze debris, inert hedgehog rocket debris, etc. Surface Clearance Subsurface Investigation Integrity-Service-Excellence 15 Fieldwork Progress (AOC N) • Visual survey and surface clearance (complete) • Four MEC items (Mk II grenades)required demolition. All other items identified were NMRD (mostly railroad trestle debris). • Subsurface MEC investigation of target anomalies (not yet complete) • Diving activities (not yet complete) Surface Clearance Integrity-Service-Excellence 16 Diving Operations Overview • Dive during slack water conditions. Typically one UXO-qualified diver in water at a time. • Unacceptable-to-move MEC detonated in place underwater. Acceptable-tomove MEC brought to surface for onshore demolition within MRS. • SWMU 25 (Water Range): Reacquire 100 anomaly locations and investigate using circle-line search with hand-held metal detector. • AOC N: Investigate and resolve 200+ anomalies in inlet area. Possibly reacquire anomalies in inland area (similar to SWMU 25) that could not be addressed by land-based UXO team; unlikely to be necessary. Integrity-Service-Excellence 17 Fieldwork Concerns 1. Remaining fieldwork: • • • • • • • 2. 3. SWMU 20: Finish subsurface investigation SWMU 25 (Parking Lot/Burial Area 1): Finish subsurface investigation SWMU 25 (Burial Area 2): Subsurface investigation and buried potential fuze masses SWMU 25 (Water Range): Diving operations SWMU 81: Finish surface clearance AOC N: Finish subsurface investigation plus diving activities All MRSs: RI sampling Working with EOTI, JB CHS, USACE, & Coast Guard to schedule diving activities at SWMU 25 (Water Range) & AOC N. SWMU 25 (TC Dock Finger Pier): • • Will require new or amended planning documents (e.g., Work Plan, ESP, and Diving Operations Plan) Likely to be addressed at a later date under a separate contract Integrity-Service-Excellence 18 Questions/Comments? Integrity-Service-Excellence 19
© Copyright 2024 ExpyDoc