information on the Hollard Daredevil Road Race

Dare Devil JHB Walk 2015 Route
Description.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
Start Point at Zoo Lake upper grass section on Princes
of Wales Terrace facing east.
Cross Jan Smuts Ave into Erisworld Wy.
Right turn into Beechworld Rd.
Left turn in Ettick Rd.
Right turn into Oxford Rd.
Left turn into Gordon Hill rd.
Continue underneath the M1 to Traffic Circle.
Enter Hollard office on the left at first gate.
Exit Hollard offices and turn left through 2nd gate onto
the main rd.
Right turn under the M1 joining Oxford rd north.
Left turn into Sherwood .
Right turn into The Valley rd.
Left turn into Rannoch rd.
Left turn into Upper Park Dr.
Right turn into Jan Smuts Ave.
Left turn into Princes of Wales Terrace .
Through Zoo Lake crossing Princes of Wales Dr entering
Zoo Lake Sports Club for the finish.
Marshaling Points.
General Notes
Event:
Dare Devil RUN 2015
Date:
30 January 2015
Times:
12:00 - 17:00
Venue:
Zoo Lake Prescient.
Attendance:
3000 - 5000
Layout Approval
Layout Approval Subject to the
following conditions:
1:
2:
3:
4:
5:
Venue Permission letter.
SAPS Risk Rating Certificate.
Structural Engineers Certificate.
Electrical Compliance Certificate.
All Emergency Exits and Routes
must be kept clear of obstacles
and obstructions at all times.
6: Traffic Support ( when applicable).
7: Gas Plan ( when applicable).
8: Waste Management plan.
9: Vendors Certificate of compliance.
10: All Fire fighting equipment must
kept clear and serviced.
11: Fire Rationale ( when applicable).
Eyethu Events (PTY) LTD
C:\Users\Ettiene\Desktop\AUTOCAD MASTER 2014\log jpeg.JPG
T: + 27 (0) 86 131 3000
F: + 27 (0) 114 214 406
www.eyethuevents.co.za
Drawn by:
Sheet
Shaun Pretorius
1 of 1
These drawing are not to be scaled, only figured dimensions are to be followed.
Contractors are to check all dimensions, heights, depths, excavations, number
of steps, heights of plinths and levels before any work commences and must
refer to the architect when any apparent discrepancies are discovered. The
contractor is responsible for the setting out of the building and for all site visits by
local authorities and inspectors and shall pay all fees in connection therewith.
may not be copied or reproduced without the owner's written consent. All
structural work must be designed by a professional engineer. All electrical
and plumbing work to be carried out by registered artisans. Finishing to be
to owners satisfaction. The Architect will not be responsible for any work
done before plans have been approved by local authority. No revisions to