W E LWY N DATA C E N T R E Welwyn Data Centre BUILDING OVERVIEW SCHEDULE OF AREAS The Welwyn data centre is situated within a highly secure double fenced site and has been designed and built to a high specification. The data centre is designed to be concurrently maintainable and the resilient mechanical and electrical design includes high levels of redundancy. It has been designed to exceed the requirements of Uptime Institute’s Tier III rating and much of the infrastructure design is more in line with Tier IV topology. Total site area: 9.4 acres Location Size (sq m) Size (sq ft) Main Building 8,930 96,123 DRUPS Building (East) 1,054 11,345 DRUPS Building (West) 1,054 11,345 Construction was completed in 2009 and it was the first data centre in the UK to be awarded a BREEAM ‘Excellent’ rating. Gatehouse The data centre has been planned to provide a total of 2,900 sq m of net technical space, arranged over two data halls. Data Hall 1 has been fitted out and went live in 2010 and will be available for immediate occupation; the second hall is currently in shell condition to provide for future expansion space. The facility also includes offices, logistics and ancillary space, together with car parking for 30 cars. Gross Internal Area Reception 82883 4995,371 11,619 125,067 Size (sq m) Size (sq ft) Data Hall 1 (Fitted) 1,450 15,608 Data Hall 2 (Shell) 1,450 15,608 Total Data Centre Space 2,900 31,216 Location Welwyn Data Centre TECHNICAL OVERVIEW Incoming Power Cooling • Two incoming HV supplies of 25 MVA • Chilled Water System designed to N+2 redundancy • Two diverse on site sub-stations • Current installed chiller capacity: 4,800 kW IT Power • Design capacity: 9,600 kW • The building is designed to ultimately provide 1,600 W per sq m of IT power (2,320 kW per hall) Fire Detection and Suppression UPS • Argonite fire suppression system installed • DRUPS system in N+N configuration Physical Storage Capacities • Current installed capacity: 1,188 kW per unit no break supply (1 unit per side installed) • Design capacity: 5,940 kW no break supply • BMS and EMS systems installed to monitor building and electrical systems • VESDA early detection and warning system • 7 days Water Storage • 7 days Diesel Storage Security and Physical Protection • Highly secure site with double fencing around the perimeter Connectivity • Vehicle lock to entrance • Diverse fibre routes to the building • External and Internal CCTV • Diverse Meet-Me-Rooms • Radar based intruder detection • Carriers present currently include Colt, Vodafone/Cable and Wireless, BT, Verizon and Level 3 • Biometric access control systems FLOOR PLAN Data Hall 1 Data Hall 2 Data Hall Plant Areas Offices and Ancillary Areas Plans are not to scale. For indicative purposes only. Welwyn Data Centre PROXIMITY TO LONDON WELWYN GARDEN CITY A1 The data centre is located in Welwyn Garden City, easily accessible from central London and is close to the national motorway network. Enfield Rail London Kings Cross Edgware 27 mins Romford Road A1 (M) - Junction 4 A1 (M) - Junction 6 M25 - Junction 2 DIGSWELL Central London 2.5 miles 3 miles 8 miles 26 miles PARK Air BR Luton Airport Stansted Airport Heathrow Airport Shepherd’s Bush O AD W 14 miles 28 DIGSWELL miles WATER 35 miles AT E R LONDON Croydon RO AD Epson TEMPLE WOOD SITE LAYOUT PLAN 00 B1 0 00 0 DIG SW ELL RO AD A1 A1 00 WELWYN GARDEN CITY FOOTBALL CLUB 0 PANSHANGER GOLF COMPLEX HILLY FIELDS MEADOW DRUPS BUILDING (WEST) B1 95 AT E R ADW BRO WELWYN GARDEN CITY ROA D RECEPTION DI GS W EL L RO AD MAIN BUILDING DRUPS BUILDING (WEST) GATEHOUSE Mundells, Welwyn Garden City, Herts, AL7 1GE CONTACTS TERMS Simon Moore The building is held leasehold. Further terms are available upon application. CBRE Data Centre Solutions St Martin’s Court, 10 Paternoster Row, London, EC4M 7HP D +44 (0)20 7182 3260 [email protected] www.cbre.com SUBJECT TO CONTRACT – January 2015 DISCLAIMER: CBRE LIMITED. CBRE Limited on its behalf and for the Vendors or Lessors of this property whose Agents they are, give notice that: 1.These particulars are set out as a general outline only for guidance to intending Purchasers or Lessees, and do not constitute any part of an offer or contract. 2. Details are given without any responsibility and any intending Purchasers, Lessees or Third Parties should not rely on them as statements or representations of fact, but must satisfy themselves by inspection or other wise as to the correctness of each of them. 3. No person in the employment of CBRE Limited has any authority to make any representation or warranty whatsoever in relation to this property. 4. Unless otherwise stated, all prices and rents are quoted exclusive of VAT. Brochure designed and produced by SAENTYS www.saentys.com
© Copyright 2024 ExpyDoc