What to Expect Regional Connector Transit Project リージョナルコネクター・トランジット ・ プロジェクト 1st St Roadway Widening/1stストリート道路拡張 Starting as early as Saturday, October 24, 2015 for approximately 10 weeks. 約10週間2015年10月24日(土曜日)として早くも開始 • South side sidewalk closed on 1st St between Hewitt St and just west of Vignes St. Local pedestrian access to businesses will be maintained at all times. • Crosswalks closed at the 1st/Hewitt intersection. Pedestrian detours in place. Use 1st St at Vignes and Alameda. • Left turns permanently restricted at the 1st/Hewitt intersection. • 1st St reduced to one lane in each direction between Alameda St and Vignes St. Work Areas/作業エリア Pedestrian Detours/歩道者のための迂回路 MOCA Geffen Contemporary Thru traffic/本線 Alameda St Crosswalks closed at 1st/Hewitt intersection 1st/Hewitt交差点の横断歩道は閉鎖されます。 Mangrove Staging Yard 1st St Businesses Open During Construction All left turns restricted at 1st/Hewitt intersection 1st/Hewitt交差点の左折は禁止されています。 Japanese American National Museum P Information is subject to change. Call the Project Hotline at 213.922.7277 or visit metro.net/regionalconnector for more details. Public Parking/公共駐車場 Little Tokyo/Arts District Station Little Tokyo/Arts District駅 P 予測されること Temple Medical Center Nishi Hongwanji LA Buddhist Temple • HewittストリートとVignesストリートの西側の間にある1stスト リートの南側歩道が閉鎖されます。建設期間中も地域のビ ジネスへの歩道者アクセスは可能です。 • 1st/Hewitt交差点の横断歩道は閉鎖されます。歩道者のた めの迂回路をご利用できます。Vignes と Alamedaの1stスト リートをご利用ください。 • 1st/Hewitt交差点の左折は禁止されています。 • Alameda ストリートとVignes ストリートの間の1stストリートは 各方向で1車線になります。 1st/Central Station (Under Construction) Hewitt St Rose St Alameda St Zenshuji Buddhist Temple Garey Building Development (Under Construction) 2nd St N 2nd St 建設中も1stストリートに位置するビジネスは営業 します 情報は変更される可能性があります。詳細はプロジェクト・ ホットラインまでお電話いただくか(213.922.7277)または metro.net/regionalconnectorまでごアクセスください。
© Copyright 2024 ExpyDoc