OPERACIONES CON TORRES: 09/03/2015 06:00am AL 10/03/2015 06:00am
RIG:
POZO:
CCDC-036
PAKA NORTE-A017
EN COMPLETACION
PKNA-017
MD (Pies):
11,540
TVD (Pies):
9,984.5
PROD.ESTIMADA: (BPPD)
DETALLE:
CONTINUA BAJANDO EQUIPO BES DUAL @ 3500', 6 JUNTAS POR HORA
RIG:
POZO:
CCDC-068
AUCA-K182
ACAK-182
EN COMPLETACION
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
DETALLE:
LLENANDO TANQUES DE AGUA DEL SISTEMA DE REINYECCION DE LA ESTACION AUCA SUR
RIG:
POZO:
OCEAN SPUR
AMISTAD-010
EN COMPLETACION
AMS-010
MD (Pies):
7,305
TVD (Pies):
7,215.5
PROD.ESTIMADA: (BPPD)
REBAJANDO CEMENTO CON BROCA 8-1/2", PROFUNDIDAD ACTUAL 7305 FT, WOB 5-15 KLBS, 690
DETALLE:
PSI 350 GPM
RIG:
POZO:
SAXON 47
ATACAPI-001
ATC-001R1
EN COMPLETACION
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
RETIRAN LLAVES DE TORQUE COMPUITARIZADO Y ACCESORIOS DE TRABAJO DE CÍA.
DETALLE:
WEATHERFORD. SIN TERMINAR
RIG:
POZO:
SINOPEC 128
AUCA-Q164
EN COMPLETACION
ACAQ-164
MD (Pies):
10,968
TVD (Pies):
10,682.4
PROD.ESTIMADA: (BPPD)
DETALLE:
BAJANDO BHA DE LIMPIEZA COMBINADO CON BROCA TRICONICA DE 6 1/8" A 7000'
RIG:
POZO:
SINOPEC 156
AUCA-P178
ACAP-178
EN COMPLETACION
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
W/L HALLIBURTON REALIZA RIG UP DE HERRAMIENTAS PARA CORRELACIONAR PROFUNDIDAD
DETALLE:
DE JETTEO
SUMARIO DE OPERACIONES
PRODUCCION Y PERFORACION
Página 2 de 7
Fecha de Impresión:
10/03/2015 7:39:58
RIG:
POZO:
SINOPEC 169
DRAGO NORTE-E062
EN COMPLETACION
DRRE-062
MD (Pies):
11,440
TVD (Pies):
12,181.4
PROD.ESTIMADA: (BPPD)
BAJANDO BHA # 2 DE LIMPIEZA CON BROCA TRICONICA 6-1/8" Y TANDEM DE LIMPIEZA DE 7" Y
DETALLE:
9-5/8" EN 5.5" DP @ 11200 FT
RIG:
POZO:
SINOPEC 191
OSO-I005I
OSOI-005I
EN COMPLETACION
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
DETALLE:
INSTALANDO BOP
RIG:
POZO:
CCDC-039
CUYABENO-E071
CYBE-071
EN MOVILIZACION
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
DETALLE:
RIG DOWN: 100%, RIG MOVE: 100%, RIG UP: 80%.
RIG:
POZO:
CCDC-038
TAPI-C010
EN PERFORACION
TAPC-010
MD (Pies):
8,800
TVD (Pies):
8,467
PROD.ESTIMADA: (BPPD)
DETALLE:
PERFORANDO SECCIÓN DE 12 1/4" CON BHA # 05 DIRECCIONAL Y BROCA PDC @ 8800'
RIG:
POZO:
CCDC-066
COCA-A002I
EN PERFORACION
COCA-002I
MD (Pies):
5,211
TVD (Pies):
4,790.2
PROD.ESTIMADA: (BPPD)
DETALLE:
PERFORANDO SECCIÓN DE 16" CON BHA # 02 DIRECCIONAL @ 5211'.
RIG:
POZO:
CCDC-069
AUCA-O158
EN PERFORACION
ACAO-158
MD (Pies):
4,130
TVD (Pies):
4,040.4
PROD.ESTIMADA: (BPPD)
DETALLE:
CIRCULANDO POZO @ 4130 FT CON 1050 GPM, 2800 PSI
RIG:
HILONG 17
SUMARIO DE OPERACIONES
PRODUCCION Y PERFORACION
Página 3 de 7
Fecha de Impresión:
10/03/2015 7:39:58
POZO:
PAYAMINO-G026
EN PERFORACION
PYMG-026
MD (Pies):
4,010
TVD (Pies):
3,996.2
PROD.ESTIMADA: (BPPD)
PERFORANDO SECCIÓN DE 16" CON BHA #02 DIRECCIONAL Y BROCA PDC DESDE 2685 FT HASTA
DETALLE:
4010
RIG:
POZO:
NABORS 794
PALO AZUL-N055
EN PERFORACION
PLAN-055
MD (Pies):
5,880
TVD (Pies):
5,779.1
PROD.ESTIMADA: (BPPD)
DETALLE:
BAJANDO CASING COMBINADO 13 3/8" BTC EN 4300'
RIG:
POZO:
SINOPEC 119
COCA-K047
EN PERFORACION
COCK-047
MD (Pies):
3,008
TVD (Pies):
2,889.8
PROD.ESTIMADA: (BPPD)
DETALLE:
CIRCULANDO EN SECCION DE 16" A 3008 PIES.
RIG:
POZO:
SINOPEC 127
OSO-H124
EN PERFORACION
OSOH-124
MD (Pies):
5,550
TVD (Pies):
5,138.5
PROD.ESTIMADA: (BPPD)
BAJANDO BHA DIR # 3 CON DP 5 1/2"FH @ 5408 FT, LLENANDO TUBERIA CADA 10 PARADAS
DETALLE:
PREVIO A ROMPER TAPONES DE CEMENTACIÓN (5501 FT - TOPE DEL COLLAR FLOTADOR).
RIG:
POZO:
SINOPEC 191
OSO-I141
EN PERFORACION
OSOI-141
MD (Pies):
5,543
TVD (Pies):
5,146.5
PROD.ESTIMADA: (BPPD)
DETALLE:
ARMANDO BHA # 3 DD : PDC 12 1/4" + POWER DRIVE
RIG:
POZO:
SINOPEC 220
OSO-G100
EN PERFORACION
OSOG-100
MD (Pies):
4,790
TVD (Pies):
4,697.1
PROD.ESTIMADA: (BPPD)
DETALLE:
REALIZANDO MANTENIMIENTO A COMPONENTES DEL RIG
RIG:
POZO:
SINOPEC 248
CONONACO-F053
EN PERFORACION
SUMARIO DE OPERACIONES
PRODUCCION Y PERFORACION
Página 4 de 7
Fecha de Impresión:
10/03/2015 7:39:58
CNOF-053
MD (Pies):
6,725
TVD (Pies):
6,436.5
PROD.ESTIMADA: (BPPD)
DETALLE:
MOLIENDO CEMENTO CON BHA DIRECCIONAL # 04 CON BROCA PDC 12-1/4"
RIG:
POZO:
HILONG 18
EDEN YUTURI-C026
EDYC-026
EN WORKOVER
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
DETALLE:
FINALIZANDO ARMADA DE EQUIPO BES
RIG:
POZO:
CCDC-052
AUCA SUR-B004
ACSB-004
EN WORKOVER
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
CONTINÚA EVACUANDO AGUA FRESCA DEL POZO CON BOMBA JET 2.812 11K Y UNIDAD MTU DE
DETALLE:
SERTECPET AL TANQUE BOTA DEL RIG.
RIG:
POZO:
DYGOIL-30
AGUARICO-A011
EN WORKOVER
AGRA-011
MD (Pies):
9,535
TVD (Pies):
9,535
PROD.ESTIMADA: (BPPD)
DETALLE:
PREPARANDO 10 BLS DE FLUIDO PARA PRUEBA DE ADMISION CON CLAY FIX-5.
RIG:
POZO:
GEOPETSA-01
PARAHUACU-A021
EN WORKOVER
PRHA-021
MD (Pies):
572.2
TVD (Pies):
572
PROD.ESTIMADA: (BPPD)
PERSONAL DE CIA. TRIPOINT ARMANDO DE LINEAS DE ALTA PRESION EN SUPERFICIE Y
DETALLE:
PROBANDO CON PRESION OK
RIG:
POZO:
GEOPETSA-04
GUANTA-F027
EN WORKOVER
GNTF-027
MD (Pies):
10,389.7
TVD (Pies):
10,066.7
PROD.ESTIMADA: (BPPD)
DETALLE:
CIRCULANDO CSG-TBG CON FLUIDO DE CONTROL @ 10390 FT, PARA LIMPIEZA DEL POZO
RIG:
POZO:
GEOPETSA-06
LAGO AGRIO-034
LGA-034
EN WORKOVER
SUMARIO DE OPERACIONES
PRODUCCION Y PERFORACION
Página 5 de 7
Fecha de Impresión:
10/03/2015 7:39:58
MD (Pies):
10,077
TVD (Pies):
10,077
PROD.ESTIMADA: (BPPD)
DETALLE:
INICIA MOVILIZACION DE EQUIPO DE REACONDICIONAMIENTO DE LGA-034 HACIA LAG-031
RIG:
POZO:
HILONG 28
PALMERAS NORTE-A006
PLNA-006
EN WORKOVER
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
CIA. BAKER ARMANDO HERRAMIENTA PFC + SETTING TOOL CON 7" PACKER FAB-1 + PATA DE
DETALLE:
MULA, AVANCE 30%.
RIG:
POZO:
KEY 80051
SHUSHUFINDI-028
EN WORKOVER
SHS-028
MD (Pies):
2,458
TVD (Pies):
2,458
PROD.ESTIMADA: (BPPD)
A LAS 06:00 HRS RIH EQ BES EN 2-7/8" TBG TSH BLUE 6.4 LBS/PIE L80 TENARIS CLASE "A"
DETALLE:
SUBIEDNO TUBO A TUBO. DENTRO DEL POZO 3023' (90 JTS + BHA + EQ BES). PESO DE LA
SARTA 35 KLBS.
RIG:
POZO:
KEY 80057
SHUSHUFINDI-059
SHS-059
EN WORKOVER
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
DETALLE:
CONTINUA BAJANDO BHA DE EVALUACION EN 2-3/8" EUE TUBERIA CLASE "B"
RIG:
POZO:
NABORS 814
PALO AZUL-D042A
PLAD-042A
EN WORKOVER
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
SACANDO BHA # 2 DE ESTIMULACIÓN CON PACKER MECÁNICO DE 7" EN PARADAS DE TUBERÍA
DETALLE:
3-1/2" EUE A LA TORRE. A LAS 06:00 HRS 9500' FUERA DEL POZO.
RIG:
POZO:
NABORS 815
OSO-B080
EN WORKOVER
OSOB-080
MD (Pies):
600
TVD (Pies):
599.7
PROD.ESTIMADA: (BPPD)
DETALLE:
SACANDO BHA # 4 CON D.P. 3-1/2" @ 600'.
RIG:
POZO:
NABORS 819
PAKA SUR-B010
EN WORKOVER
SUMARIO DE OPERACIONES
PRODUCCION Y PERFORACION
Página 6 de 7
Fecha de Impresión:
10/03/2015 7:39:58
PKSB-010
MD (Pies):
11,846
TVD (Pies):
10,009.4
PROD.ESTIMADA: (BPPD)
TECNICO DE CIA. BAKER REALIZA EMPATE DE CABLE DE CARRETO # 1 A CABLE DE CARRETO # 2
DETALLE:
@ 4720'. OPERACION EN PROCESO.
RIG:
POZO:
SAXON 53
EDEN YUTURI-F117
EN WORKOVER
EDYF-117
MD (Pies):
8,446.9
TVD (Pies):
7,234.6
PROD.ESTIMADA: (BPPD)
DETALLE:
CONTINUA EVALUANDO ARENA "U" SUP. A ESTA HORA VAN 26 HORAS DE PRUEBA
RIG:
POZO:
SAXON 55
ATACAPI-C030
ATCC-030
EN WORKOVER
MD (Pies):
TVD (Pies):
PROD.ESTIMADA:300 (BPPD)
TEC SLB DESARMA EQUIPO BES D1750N HASTA PROTECTOR. INF. SIN TERMINAR NOTA; BOMBA
SUP. E INTERM. ATASCADAS, CON SÓLIDOS EN LA CABEZA. BOMBA INF GIRO LIBRE, COUPLING
DETALLE:
ENTRE BOMBA INF Y AGH SALE ROTO. AGH GIRO LIBRE, SEP DE GAS LIMPIO GIRO LIBRE.
SELLOS OK.
RIG:
POZO:
SINOPEC-905
EDEN YUTURI-G045
EDYG-045
EN WORKOVER
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
DETALLE:
OPERACIONES DE WO FINALIZADAS.
RIG:
POZO:
TRIBOILGAS-006
SECOYA-027
EN WORKOVER
SCY-027
MD (Pies):
7,500
TVD (Pies):
7,500
PROD.ESTIMADA:150 (BPPD)
TEC. SCHLUMBERGER REALIZA EMPALME DEL CABLE DE CARRETO # 1 A CARRETO # 2;
DETALLE:
PROFUNDIDAD 4980'
RIG:
POZO:
TRIBOILGAS-008
DRAGO ESTE-A013
DRTA-013
EN WORKOVER
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
REALIZA CORRELACIÓN CON HERRAMIENTAS GR-CCL; REGISTRA DESDE 9700' HASTA
DETALLE:
10100' (400'). REPUNZONA INTERVALO "Ti": 10050'-10057' (7') CON CAÑONES DE 4 1/2" +
DESARMA HERRAMIENTAS Y EQUIPO EN SUPERFICIE
SUMARIO DE OPERACIONES
PRODUCCION Y PERFORACION
RIG:
POZO:
TRIBOILGAS-101
CUYABENO-K025
CYBK-025
Página 7 de 7
Fecha de Impresión:
10/03/2015 7:39:58
EN WORKOVER
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
DETALLE:
CIA. TRIPOINT ASIENTAN 7" TAPON CIBP @7790'.
RIG:
POZO:
TRIBOILGAS-102
AUCA-I084
EN WORKOVER
ACAI-084
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
LLENANDO TANQUES DEL RIG: 500/1000 BLS DE AGUA FRESCA FILTRADA < 10 NTU Y
DETALLE:
PREPARANDO FLUIDO DE CONTROL BAKER DE 8.6 PPG.
RIG:
POZO:
TRIBOILGAS-107
CUYABENO-H046
CYBH-046
EN WORKOVER
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
Bajando equipo BES P12 de Cia. Baker en 4 1/2" EUE tubería clase "A" midiendo, calibrando y
DETALLE:
probando con 3000 PSI c/40 tubos + instalando protectores Cannon en cada cuello y colocando
bandas en mediaciones de cada tubo + mega cable cada 2000' hasta 550'