SUMARIO DE OPERACIONES PRODUCCION Y PERFORACION Página 1 de 7 Fecha de Impresión: 10/03/2015 7:39:58 OPERACIONES CON TORRES: 09/03/2015 06:00am AL 10/03/2015 06:00am RIG: POZO: CCDC-036 PAKA NORTE-A017 EN COMPLETACION PKNA-017 MD (Pies): 11,540 TVD (Pies): 9,984.5 PROD.ESTIMADA: (BPPD) DETALLE: CONTINUA BAJANDO EQUIPO BES DUAL @ 3500', 6 JUNTAS POR HORA RIG: POZO: CCDC-068 AUCA-K182 ACAK-182 EN COMPLETACION MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) DETALLE: LLENANDO TANQUES DE AGUA DEL SISTEMA DE REINYECCION DE LA ESTACION AUCA SUR RIG: POZO: OCEAN SPUR AMISTAD-010 EN COMPLETACION AMS-010 MD (Pies): 7,305 TVD (Pies): 7,215.5 PROD.ESTIMADA: (BPPD) REBAJANDO CEMENTO CON BROCA 8-1/2", PROFUNDIDAD ACTUAL 7305 FT, WOB 5-15 KLBS, 690 DETALLE: PSI 350 GPM RIG: POZO: SAXON 47 ATACAPI-001 ATC-001R1 EN COMPLETACION MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) RETIRAN LLAVES DE TORQUE COMPUITARIZADO Y ACCESORIOS DE TRABAJO DE CÍA. DETALLE: WEATHERFORD. SIN TERMINAR RIG: POZO: SINOPEC 128 AUCA-Q164 EN COMPLETACION ACAQ-164 MD (Pies): 10,968 TVD (Pies): 10,682.4 PROD.ESTIMADA: (BPPD) DETALLE: BAJANDO BHA DE LIMPIEZA COMBINADO CON BROCA TRICONICA DE 6 1/8" A 7000' RIG: POZO: SINOPEC 156 AUCA-P178 ACAP-178 EN COMPLETACION MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) W/L HALLIBURTON REALIZA RIG UP DE HERRAMIENTAS PARA CORRELACIONAR PROFUNDIDAD DETALLE: DE JETTEO SUMARIO DE OPERACIONES PRODUCCION Y PERFORACION Página 2 de 7 Fecha de Impresión: 10/03/2015 7:39:58 RIG: POZO: SINOPEC 169 DRAGO NORTE-E062 EN COMPLETACION DRRE-062 MD (Pies): 11,440 TVD (Pies): 12,181.4 PROD.ESTIMADA: (BPPD) BAJANDO BHA # 2 DE LIMPIEZA CON BROCA TRICONICA 6-1/8" Y TANDEM DE LIMPIEZA DE 7" Y DETALLE: 9-5/8" EN 5.5" DP @ 11200 FT RIG: POZO: SINOPEC 191 OSO-I005I OSOI-005I EN COMPLETACION MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) DETALLE: INSTALANDO BOP RIG: POZO: CCDC-039 CUYABENO-E071 CYBE-071 EN MOVILIZACION MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) DETALLE: RIG DOWN: 100%, RIG MOVE: 100%, RIG UP: 80%. RIG: POZO: CCDC-038 TAPI-C010 EN PERFORACION TAPC-010 MD (Pies): 8,800 TVD (Pies): 8,467 PROD.ESTIMADA: (BPPD) DETALLE: PERFORANDO SECCIÓN DE 12 1/4" CON BHA # 05 DIRECCIONAL Y BROCA PDC @ 8800' RIG: POZO: CCDC-066 COCA-A002I EN PERFORACION COCA-002I MD (Pies): 5,211 TVD (Pies): 4,790.2 PROD.ESTIMADA: (BPPD) DETALLE: PERFORANDO SECCIÓN DE 16" CON BHA # 02 DIRECCIONAL @ 5211'. RIG: POZO: CCDC-069 AUCA-O158 EN PERFORACION ACAO-158 MD (Pies): 4,130 TVD (Pies): 4,040.4 PROD.ESTIMADA: (BPPD) DETALLE: CIRCULANDO POZO @ 4130 FT CON 1050 GPM, 2800 PSI RIG: HILONG 17 SUMARIO DE OPERACIONES PRODUCCION Y PERFORACION Página 3 de 7 Fecha de Impresión: 10/03/2015 7:39:58 POZO: PAYAMINO-G026 EN PERFORACION PYMG-026 MD (Pies): 4,010 TVD (Pies): 3,996.2 PROD.ESTIMADA: (BPPD) PERFORANDO SECCIÓN DE 16" CON BHA #02 DIRECCIONAL Y BROCA PDC DESDE 2685 FT HASTA DETALLE: 4010 RIG: POZO: NABORS 794 PALO AZUL-N055 EN PERFORACION PLAN-055 MD (Pies): 5,880 TVD (Pies): 5,779.1 PROD.ESTIMADA: (BPPD) DETALLE: BAJANDO CASING COMBINADO 13 3/8" BTC EN 4300' RIG: POZO: SINOPEC 119 COCA-K047 EN PERFORACION COCK-047 MD (Pies): 3,008 TVD (Pies): 2,889.8 PROD.ESTIMADA: (BPPD) DETALLE: CIRCULANDO EN SECCION DE 16" A 3008 PIES. RIG: POZO: SINOPEC 127 OSO-H124 EN PERFORACION OSOH-124 MD (Pies): 5,550 TVD (Pies): 5,138.5 PROD.ESTIMADA: (BPPD) BAJANDO BHA DIR # 3 CON DP 5 1/2"FH @ 5408 FT, LLENANDO TUBERIA CADA 10 PARADAS DETALLE: PREVIO A ROMPER TAPONES DE CEMENTACIÓN (5501 FT - TOPE DEL COLLAR FLOTADOR). RIG: POZO: SINOPEC 191 OSO-I141 EN PERFORACION OSOI-141 MD (Pies): 5,543 TVD (Pies): 5,146.5 PROD.ESTIMADA: (BPPD) DETALLE: ARMANDO BHA # 3 DD : PDC 12 1/4" + POWER DRIVE RIG: POZO: SINOPEC 220 OSO-G100 EN PERFORACION OSOG-100 MD (Pies): 4,790 TVD (Pies): 4,697.1 PROD.ESTIMADA: (BPPD) DETALLE: REALIZANDO MANTENIMIENTO A COMPONENTES DEL RIG RIG: POZO: SINOPEC 248 CONONACO-F053 EN PERFORACION SUMARIO DE OPERACIONES PRODUCCION Y PERFORACION Página 4 de 7 Fecha de Impresión: 10/03/2015 7:39:58 CNOF-053 MD (Pies): 6,725 TVD (Pies): 6,436.5 PROD.ESTIMADA: (BPPD) DETALLE: MOLIENDO CEMENTO CON BHA DIRECCIONAL # 04 CON BROCA PDC 12-1/4" RIG: POZO: HILONG 18 EDEN YUTURI-C026 EDYC-026 EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) DETALLE: FINALIZANDO ARMADA DE EQUIPO BES RIG: POZO: CCDC-052 AUCA SUR-B004 ACSB-004 EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) CONTINÚA EVACUANDO AGUA FRESCA DEL POZO CON BOMBA JET 2.812 11K Y UNIDAD MTU DE DETALLE: SERTECPET AL TANQUE BOTA DEL RIG. RIG: POZO: DYGOIL-30 AGUARICO-A011 EN WORKOVER AGRA-011 MD (Pies): 9,535 TVD (Pies): 9,535 PROD.ESTIMADA: (BPPD) DETALLE: PREPARANDO 10 BLS DE FLUIDO PARA PRUEBA DE ADMISION CON CLAY FIX-5. RIG: POZO: GEOPETSA-01 PARAHUACU-A021 EN WORKOVER PRHA-021 MD (Pies): 572.2 TVD (Pies): 572 PROD.ESTIMADA: (BPPD) PERSONAL DE CIA. TRIPOINT ARMANDO DE LINEAS DE ALTA PRESION EN SUPERFICIE Y DETALLE: PROBANDO CON PRESION OK RIG: POZO: GEOPETSA-04 GUANTA-F027 EN WORKOVER GNTF-027 MD (Pies): 10,389.7 TVD (Pies): 10,066.7 PROD.ESTIMADA: (BPPD) DETALLE: CIRCULANDO CSG-TBG CON FLUIDO DE CONTROL @ 10390 FT, PARA LIMPIEZA DEL POZO RIG: POZO: GEOPETSA-06 LAGO AGRIO-034 LGA-034 EN WORKOVER SUMARIO DE OPERACIONES PRODUCCION Y PERFORACION Página 5 de 7 Fecha de Impresión: 10/03/2015 7:39:58 MD (Pies): 10,077 TVD (Pies): 10,077 PROD.ESTIMADA: (BPPD) DETALLE: INICIA MOVILIZACION DE EQUIPO DE REACONDICIONAMIENTO DE LGA-034 HACIA LAG-031 RIG: POZO: HILONG 28 PALMERAS NORTE-A006 PLNA-006 EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) CIA. BAKER ARMANDO HERRAMIENTA PFC + SETTING TOOL CON 7" PACKER FAB-1 + PATA DE DETALLE: MULA, AVANCE 30%. RIG: POZO: KEY 80051 SHUSHUFINDI-028 EN WORKOVER SHS-028 MD (Pies): 2,458 TVD (Pies): 2,458 PROD.ESTIMADA: (BPPD) A LAS 06:00 HRS RIH EQ BES EN 2-7/8" TBG TSH BLUE 6.4 LBS/PIE L80 TENARIS CLASE "A" DETALLE: SUBIEDNO TUBO A TUBO. DENTRO DEL POZO 3023' (90 JTS + BHA + EQ BES). PESO DE LA SARTA 35 KLBS. RIG: POZO: KEY 80057 SHUSHUFINDI-059 SHS-059 EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) DETALLE: CONTINUA BAJANDO BHA DE EVALUACION EN 2-3/8" EUE TUBERIA CLASE "B" RIG: POZO: NABORS 814 PALO AZUL-D042A PLAD-042A EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) SACANDO BHA # 2 DE ESTIMULACIÓN CON PACKER MECÁNICO DE 7" EN PARADAS DE TUBERÍA DETALLE: 3-1/2" EUE A LA TORRE. A LAS 06:00 HRS 9500' FUERA DEL POZO. RIG: POZO: NABORS 815 OSO-B080 EN WORKOVER OSOB-080 MD (Pies): 600 TVD (Pies): 599.7 PROD.ESTIMADA: (BPPD) DETALLE: SACANDO BHA # 4 CON D.P. 3-1/2" @ 600'. RIG: POZO: NABORS 819 PAKA SUR-B010 EN WORKOVER SUMARIO DE OPERACIONES PRODUCCION Y PERFORACION Página 6 de 7 Fecha de Impresión: 10/03/2015 7:39:58 PKSB-010 MD (Pies): 11,846 TVD (Pies): 10,009.4 PROD.ESTIMADA: (BPPD) TECNICO DE CIA. BAKER REALIZA EMPATE DE CABLE DE CARRETO # 1 A CABLE DE CARRETO # 2 DETALLE: @ 4720'. OPERACION EN PROCESO. RIG: POZO: SAXON 53 EDEN YUTURI-F117 EN WORKOVER EDYF-117 MD (Pies): 8,446.9 TVD (Pies): 7,234.6 PROD.ESTIMADA: (BPPD) DETALLE: CONTINUA EVALUANDO ARENA "U" SUP. A ESTA HORA VAN 26 HORAS DE PRUEBA RIG: POZO: SAXON 55 ATACAPI-C030 ATCC-030 EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA:300 (BPPD) TEC SLB DESARMA EQUIPO BES D1750N HASTA PROTECTOR. INF. SIN TERMINAR NOTA; BOMBA SUP. E INTERM. ATASCADAS, CON SÓLIDOS EN LA CABEZA. BOMBA INF GIRO LIBRE, COUPLING DETALLE: ENTRE BOMBA INF Y AGH SALE ROTO. AGH GIRO LIBRE, SEP DE GAS LIMPIO GIRO LIBRE. SELLOS OK. RIG: POZO: SINOPEC-905 EDEN YUTURI-G045 EDYG-045 EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) DETALLE: OPERACIONES DE WO FINALIZADAS. RIG: POZO: TRIBOILGAS-006 SECOYA-027 EN WORKOVER SCY-027 MD (Pies): 7,500 TVD (Pies): 7,500 PROD.ESTIMADA:150 (BPPD) TEC. SCHLUMBERGER REALIZA EMPALME DEL CABLE DE CARRETO # 1 A CARRETO # 2; DETALLE: PROFUNDIDAD 4980' RIG: POZO: TRIBOILGAS-008 DRAGO ESTE-A013 DRTA-013 EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) REALIZA CORRELACIÓN CON HERRAMIENTAS GR-CCL; REGISTRA DESDE 9700' HASTA DETALLE: 10100' (400'). REPUNZONA INTERVALO "Ti": 10050'-10057' (7') CON CAÑONES DE 4 1/2" + DESARMA HERRAMIENTAS Y EQUIPO EN SUPERFICIE SUMARIO DE OPERACIONES PRODUCCION Y PERFORACION RIG: POZO: TRIBOILGAS-101 CUYABENO-K025 CYBK-025 Página 7 de 7 Fecha de Impresión: 10/03/2015 7:39:58 EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) DETALLE: CIA. TRIPOINT ASIENTAN 7" TAPON CIBP @7790'. RIG: POZO: TRIBOILGAS-102 AUCA-I084 EN WORKOVER ACAI-084 MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) LLENANDO TANQUES DEL RIG: 500/1000 BLS DE AGUA FRESCA FILTRADA < 10 NTU Y DETALLE: PREPARANDO FLUIDO DE CONTROL BAKER DE 8.6 PPG. RIG: POZO: TRIBOILGAS-107 CUYABENO-H046 CYBH-046 EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) Bajando equipo BES P12 de Cia. Baker en 4 1/2" EUE tubería clase "A" midiendo, calibrando y DETALLE: probando con 3000 PSI c/40 tubos + instalando protectores Cannon en cada cuello y colocando bandas en mediaciones de cada tubo + mega cable cada 2000' hasta 550' DESCRIPCION DE UNIDADES: BPPD: Barriles de Petróleo por día
© Copyright 2024 ExpyDoc