SUMARIO DE OPERACIONES PRODUCCION Y

SUMARIO DE OPERACIONES
PRODUCCION Y PERFORACION
Página 1 de 7
Fecha de Impresión:
21/02/2015 7:21:42
OPERACIONES CON TORRES: 20/02/2015 06:00am AL 21/02/2015 06:00am
RIG:
POZO:
CCDC-038
TAPI-C014
TAPC-014
EN COMPLETACION
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
DETALLE:
SACAN 3 1/2" TUBING, L-80, EUE, 9.3 PPF, EN PARADAS A LA TORRE. TOTAL:33 PARADAS
RIG:
POZO:
PETREX 5824
APAIKA-A014
EN COMPLETACION
APKA-014
MD (Pies):
8,446
TVD (Pies):
7,292.3
PROD.ESTIMADA: (BPPD)
DETALLE:
EVALUANDO POZO APAIKA 14
RIG:
POZO:
SINOPEC 191
OSO-I005I
OSOI-005I
EN COMPLETACION
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
CIRCULADO CON BOMBAS DEL TALADRO Y HERRAMIENTA HYDRAJET @ 11216' MD (TOPE DEL
DETALLE:
CIBP), PARA DEJAR EL POZO CON KCL LIMPIO DE 8.9 PPG.
RIG:
POZO:
SINOPEC 248
CONONACO-I042
EN COMPLETACION
CNOI-042
MD (Pies):
10,847
TVD (Pies):
10,576.6
PROD.ESTIMADA: (BPPD)
DETALLE:
FINALIZA EVENTO DE COMPLETACION DEL POZO CNOI-042
RIG:
POZO:
OCEAN SPUR
AMISTAD-010
AMS-010
EN MOVILIZACION
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
DETALLE:
OREDEN, LIMPIEZA + PINTURA
RIG:
POZO:
CCDC-036
PAKA NORTE-A017
EN PERFORACION
PKNA-017
MD (Pies):
10,919
TVD (Pies):
9,450.9
PROD.ESTIMADA: (BPPD)
DETALLE:
BAJANDO BHA #7 VIAJE DE CALIBRACION @ 8164' CON BOMBA Y ROTARIA
RIG:
CCDC-039
SUMARIO DE OPERACIONES
PRODUCCION Y PERFORACION
Página 2 de 7
Fecha de Impresión:
21/02/2015 7:21:42
POZO:
CUYABENO-C068
EN PERFORACION
CYBC-068
MD (Pies):
4,251
TVD (Pies):
3,915.5
PROD.ESTIMADA: (BPPD)
DETALLE:
REALIZANDO VIAJE A FONDO CON BHA #3 @ 3214 FT.
RIG:
POZO:
CCDC-066
COCA-A057H
EN PERFORACION
COCA-057H
MD (Pies):
11,177
TVD (Pies):
9,480.6
PROD.ESTIMADA: (BPPD)
DETALLE:
SACANDO BHA#8 CONVENCIONAL CON BROCA DE 8-1/2" TRICONICA @ 10000' LIBRE.
RIG:
POZO:
CCDC-068
AUCA-K182
ACAK-182
MD (Pies):
240
TVD (Pies):
240
PROD.ESTIMADA: (BPPD)
DETALLE:
EN PERFORACION
RIG:
POZO:
CCDC-069
AUCA-O157
EN PERFORACION
ACAO-157
MD (Pies):
10,450
TVD (Pies):
10,043.6
PROD.ESTIMADA: (BPPD)
PERFORANDO SECCION DE 8.5" CON BHA # 5 DD BROCA DSR619M-B10 JETS 6 X12 1/32 nd @
DETALLE:
10450 FT. ROP Avg: 41 FT/H.
RIG:
POZO:
HILONG 17
PAYAMINO-G025
EN PERFORACION
PYMG-025
MD (Pies):
9,932
TVD (Pies):
9,410.1
PROD.ESTIMADA: (BPPD)
DETALLE:
BAJANDO TUBERIA 5-1/2" HLST-54 CON BHA # 8 DIRECCIONAL Y BROCA PDC 8-1/2" A 2700 FT.
RIG:
POZO:
NABORS 609
RUMIYACU-A006
EN PERFORACION
RMYA-006
MD (Pies):
5,551
TVD (Pies):
5,488.3
PROD.ESTIMADA: (BPPD)
REALIZANDO ESTACION DE CIRCULACION A 5551', BOMBEA PILDORA Y CIRCULA A ZRNDS.
DETALLE:
NORMALES SIN TERMINAR.
RIG:
POZO:
SINOPEC 119
COCA-K046
EN PERFORACION
SUMARIO DE OPERACIONES
PRODUCCION Y PERFORACION
Página 3 de 7
Fecha de Impresión:
21/02/2015 7:21:42
COCK-046
MD (Pies):
11,529
TVD (Pies):
9,725.7
PROD.ESTIMADA: (BPPD)
DETALLE:
CON ZAPATO FLOTADOR DE 7" A 11521' CIRCULA LIMPIANDO POZO.
RIG:
POZO:
SINOPEC 128
AUCA-Q164
EN PERFORACION
ACAQ-164
MD (Pies):
2,754
TVD (Pies):
2,683
PROD.ESTIMADA: (BPPD)
PERFORANDO SECCIÓN DE 16" ROTANDO Y DESLIZANDO CON BHA # 02 DIRECCIONAL Y BROCA
DETALLE:
PDC @ 2754'
RIG:
POZO:
SINOPEC 156
AUCA-P178
EN PERFORACION
ACAP-178
MD (Pies):
8,300
TVD (Pies):
8,023
PROD.ESTIMADA: (BPPD)
DETALLE:
PERFORANDO CON BHA # 4 CON PARAMETROS CONTROLADOS A 8300'
RIG:
POZO:
SINOPEC 169
DRAGO NORTE-E062
EN PERFORACION
DRRE-062
MD (Pies):
8,446
TVD (Pies):
7,365
PROD.ESTIMADA: (BPPD)
SACANDO BHA #4 DIRECCIONAL EN VIAJE A LA ZAPATA DE 13-3/8" (POR 45 HRS DE
DETALLE:
PERFORACION) HASTA 6870'
RIG:
POZO:
SINOPEC 220
OSO-G100
EN PERFORACION
OSOG-100
MD (Pies):
4,380
TVD (Pies):
4,328.1
PROD.ESTIMADA: (BPPD)
DETALLE:
PERFORANDO CON BHA DIRECCIONAL # 3 CON BROCA PDC DE 16" A 4380 FT
RIG:
POZO:
HILONG 18
EDEN YUTURI-J076
EDYJ-076
EN WORKOVER
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
DETALLE:
TEC. SLB REALIZA EMPATE ENTRE CABLES, ( SIN TERMINAR).
RIG:
POZO:
CCDC-052
AUCA-024
ACA-024
EN WORKOVER
SUMARIO DE OPERACIONES
PRODUCCION Y PERFORACION
Página 4 de 7
Fecha de Impresión:
21/02/2015 7:21:42
MD (Pies):
9,700
TVD (Pies):
9,700
PROD.ESTIMADA: (BPPD)
DETALLE:
TÉCNICO SLB-ATL REALIZA EMPALME DE CABLE DE POTENCIA A CARRETO # 3 A 8,499 FT.
RIG:
POZO:
DYGOIL-30
SHUSHUFINDI-H154
EN WORKOVER
SHSH-154
MD (Pies):
8,420
TVD (Pies):
8,020.4
PROD.ESTIMADA: (BPPD)
DETALLE:
ESPERANDO POR LOCACIÓN PARA EL RIG DYGOIL 30.
RIG:
POZO:
GEOPETSA-01
PARAHUACU-A021
EN WORKOVER
PRHA-021
MD (Pies):
572.2
TVD (Pies):
572
PROD.ESTIMADA: (BPPD)
BAJANDO BHA DE LIMPIEZA CON 6 1/8" BROCA EN 3 1/2" IF DRILL PIPE, MIDIENDO,
DETALLE:
CALIBRANDO Y SUBIENDO TUBO A TUBO DESDE LOS CABALLETES
RIG:
POZO:
HILONG 28
PALMAR OESTE-A008
PLOA-008
EN WORKOVER
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
ESPERANDO LUZ DEL DIA PARA CONTINUAR CON LA MOVILIZACION DESDE CEDROS SUR HACIA
DETALLE:
PALMAR OESTE. EQUIPO MOVIDO 80% ARMADO 40% MINI CAM MOVIDO 0 % ARMADO 0%
RIG:
POZO:
KEY 80051
SHUSHUFINDI-014
EN WORKOVER
SHS-014
MD (Pies):
8,000
TVD (Pies):
8,000
PROD.ESTIMADA: (BPPD)
CONT. BAJANDO BHA PUNTA LIBRE PARA TAPON BALANCEADO , NORMALIZANDO TORQUE EN
DETALLE:
JUNTAS DE DRILL PIPE ; MIDIENDO Y CALIBRANDO CADA 20 PARADAS
RIG:
POZO:
KEY 80057
SHUSHUFINDI-I133
SHSI-133
EN WORKOVER
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
DETALLE:
DESARMA BHA DE PRODUCCION SOBRE EQUIPO BES
RIG:
POZO:
NABORS 794
PALO AZUL-N049H
PLAN-049H
EN WORKOVER
SUMARIO DE OPERACIONES
PRODUCCION Y PERFORACION
Página 5 de 7
Fecha de Impresión:
21/02/2015 7:21:42
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
DETALLE:
TECNICO DE BAKER CENTRILIF CORTA CABLE A 7085 FT Y CAMBIA CARRETO. 06H00 FINALIZA
RIG:
POZO:
NABORS 813
AUCA SUR-A018
ACSA-018S1
EN WORKOVER
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
BAJANDO BHA DE LIMPIEZA EN TANDEM CON BROCA 6-1/8" CON SCRAPER DE 7" Y 9 5/8" EN 3
DETALLE:
1/2" DP. A LAS 06H00 DENTRO DEL POZO 8300'
RIG:
POZO:
NABORS 814
PALO AZUL-B010
PLAB-010S1
EN WORKOVER
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
DETALLE:
REUNION DE SEGURIDAD (ATS) PREVIO A CONTINUAR CON MOVIMIENTO DESDE PATA-006.
RIG:
POZO:
NABORS 815
OSO-B076
EN WORKOVER
OSOB-076
MD (Pies):
9,348.5
TVD (Pies):
8,994.8
PROD.ESTIMADA: (BPPD)
DETALLE:
CIRCULANDO POZO PARA LIMPIEZA CON 3.0 BPM y 600 PSI.
RIG:
POZO:
NABORS 819
YANAQUINCHA ESTE-A007
YNEA-007
EN WORKOVER
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
COORDINANDO ENVIO DE LA TUBERIA DE COMPLETACION DE 4-1/2" SEC DESDE EL BLOQUE 12
DETALLE:
AL POZO YNEA 007 A CARGO DEL DEPARTAMENTO DE MATERIALES
RIG:
POZO:
SAXON 47
ATACAPI-D029
ATCD-029
EN WORKOVER
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
DETALLE:
SACANDO HERRAMIENTAS DE SLICKLINE SIN TERMINAR
RIG:
POZO:
MD (Pies):
SAXON 53
EDEN YUTURI-F117
EDYF-117
EN WORKOVER
SUMARIO DE OPERACIONES
PRODUCCION Y PERFORACION
Página 6 de 7
Fecha de Impresión:
21/02/2015 7:21:42
TVD (Pies):
PROD.ESTIMADA: (BPPD)
DETALLE:
DESARMANDO EQUIPO BES Y Y TOOL
RIG:
POZO:
SAXON 55
SHUSHUQUI-002
SHH-002
EN WORKOVER
MD (Pies):
TVD (Pies):
PROD.ESTIMADA:200 (BPPD)
DETALLE:
EVALUANDO ARENA "U INFERIOR " (9100' - 9105') CON JET 11K A TANQUE BOTA DEL RIG.
RIG:
POZO:
SINOPEC-905
EDEN YUTURI-G045
EN WORKOVER
EDYG-045
MD (Pies):
5,900
TVD (Pies):
5,484.4
PROD.ESTIMADA: (BPPD)
DETALLE:
BAJANDO BHA DE CEMENTACION PARA REALIZAR TAPON BALANCEADO A ARENA "M1"
RIG:
POZO:
TRIBOILGAS-006
PACAYACU-A006
PYAA-006
EN WORKOVER
MD (Pies):
TVD (Pies):
PROD.ESTIMADA:100 (BPPD)
CONTINUA SACANDO COMPLETACION MECANICA EN 3 1/2" EUE TUBERIA CLASE B, MIDIENDO
DETALLE:
CADA 22 PARADAS HASTA 8500',
RIG:
POZO:
TRIBOILGAS-101
CUYABENO-K063
CYBK-063
EN WORKOVER
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
SACANDO EQUIPO BES P18H EN 3-1/2" TUBERIA HQST-1. QUEBRANDO A LOS CABALLETES. 3600
DETALLE:
FT FUERA DEL POZO.
RIG:
POZO:
TRIBOILGAS-102
YULEBRA-A008
YLBA-008
EN WORKOVER
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
DETALLE:
CAMBIANDO BLOQUE IMPRESOR DE 5 1/2'' POR 4''.
RIG:
POZO:
MD (Pies):
TVD (Pies):
TRIBOILGAS-105
DRAGO NORTE-A011
DRRA-011
9,930
9,543.3
EN WORKOVER
SUMARIO DE OPERACIONES
PRODUCCION Y PERFORACION
PROD.ESTIMADA: (BPPD)
DETALLE:
DESARMANDO BHA DE LIMPIEZA.
RIG:
POZO:
TRIBOILGAS-107
VICTOR HUGO RUALES-009
VHR-009
EN WORKOVER
MD (Pies):
TVD (Pies):
PROD.ESTIMADA: (BPPD)
DETALLE:
06H00 LEVANTANDO SARTA+ RETIRANDO TUBING HANGER 7 1/16" x 3 1/2"EUE.
DESCRIPCION DE UNIDADES:
BPPD: Barriles de Petróleo por día
Página 7 de 7
Fecha de Impresión:
21/02/2015 7:21:42