SUMARIO DE OPERACIONES PRODUCCION Y PERFORACION Página 1 de 7 Fecha de Impresión: 21/02/2015 7:21:42 OPERACIONES CON TORRES: 20/02/2015 06:00am AL 21/02/2015 06:00am RIG: POZO: CCDC-038 TAPI-C014 TAPC-014 EN COMPLETACION MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) DETALLE: SACAN 3 1/2" TUBING, L-80, EUE, 9.3 PPF, EN PARADAS A LA TORRE. TOTAL:33 PARADAS RIG: POZO: PETREX 5824 APAIKA-A014 EN COMPLETACION APKA-014 MD (Pies): 8,446 TVD (Pies): 7,292.3 PROD.ESTIMADA: (BPPD) DETALLE: EVALUANDO POZO APAIKA 14 RIG: POZO: SINOPEC 191 OSO-I005I OSOI-005I EN COMPLETACION MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) CIRCULADO CON BOMBAS DEL TALADRO Y HERRAMIENTA HYDRAJET @ 11216' MD (TOPE DEL DETALLE: CIBP), PARA DEJAR EL POZO CON KCL LIMPIO DE 8.9 PPG. RIG: POZO: SINOPEC 248 CONONACO-I042 EN COMPLETACION CNOI-042 MD (Pies): 10,847 TVD (Pies): 10,576.6 PROD.ESTIMADA: (BPPD) DETALLE: FINALIZA EVENTO DE COMPLETACION DEL POZO CNOI-042 RIG: POZO: OCEAN SPUR AMISTAD-010 AMS-010 EN MOVILIZACION MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) DETALLE: OREDEN, LIMPIEZA + PINTURA RIG: POZO: CCDC-036 PAKA NORTE-A017 EN PERFORACION PKNA-017 MD (Pies): 10,919 TVD (Pies): 9,450.9 PROD.ESTIMADA: (BPPD) DETALLE: BAJANDO BHA #7 VIAJE DE CALIBRACION @ 8164' CON BOMBA Y ROTARIA RIG: CCDC-039 SUMARIO DE OPERACIONES PRODUCCION Y PERFORACION Página 2 de 7 Fecha de Impresión: 21/02/2015 7:21:42 POZO: CUYABENO-C068 EN PERFORACION CYBC-068 MD (Pies): 4,251 TVD (Pies): 3,915.5 PROD.ESTIMADA: (BPPD) DETALLE: REALIZANDO VIAJE A FONDO CON BHA #3 @ 3214 FT. RIG: POZO: CCDC-066 COCA-A057H EN PERFORACION COCA-057H MD (Pies): 11,177 TVD (Pies): 9,480.6 PROD.ESTIMADA: (BPPD) DETALLE: SACANDO BHA#8 CONVENCIONAL CON BROCA DE 8-1/2" TRICONICA @ 10000' LIBRE. RIG: POZO: CCDC-068 AUCA-K182 ACAK-182 MD (Pies): 240 TVD (Pies): 240 PROD.ESTIMADA: (BPPD) DETALLE: EN PERFORACION RIG: POZO: CCDC-069 AUCA-O157 EN PERFORACION ACAO-157 MD (Pies): 10,450 TVD (Pies): 10,043.6 PROD.ESTIMADA: (BPPD) PERFORANDO SECCION DE 8.5" CON BHA # 5 DD BROCA DSR619M-B10 JETS 6 X12 1/32 nd @ DETALLE: 10450 FT. ROP Avg: 41 FT/H. RIG: POZO: HILONG 17 PAYAMINO-G025 EN PERFORACION PYMG-025 MD (Pies): 9,932 TVD (Pies): 9,410.1 PROD.ESTIMADA: (BPPD) DETALLE: BAJANDO TUBERIA 5-1/2" HLST-54 CON BHA # 8 DIRECCIONAL Y BROCA PDC 8-1/2" A 2700 FT. RIG: POZO: NABORS 609 RUMIYACU-A006 EN PERFORACION RMYA-006 MD (Pies): 5,551 TVD (Pies): 5,488.3 PROD.ESTIMADA: (BPPD) REALIZANDO ESTACION DE CIRCULACION A 5551', BOMBEA PILDORA Y CIRCULA A ZRNDS. DETALLE: NORMALES SIN TERMINAR. RIG: POZO: SINOPEC 119 COCA-K046 EN PERFORACION SUMARIO DE OPERACIONES PRODUCCION Y PERFORACION Página 3 de 7 Fecha de Impresión: 21/02/2015 7:21:42 COCK-046 MD (Pies): 11,529 TVD (Pies): 9,725.7 PROD.ESTIMADA: (BPPD) DETALLE: CON ZAPATO FLOTADOR DE 7" A 11521' CIRCULA LIMPIANDO POZO. RIG: POZO: SINOPEC 128 AUCA-Q164 EN PERFORACION ACAQ-164 MD (Pies): 2,754 TVD (Pies): 2,683 PROD.ESTIMADA: (BPPD) PERFORANDO SECCIÓN DE 16" ROTANDO Y DESLIZANDO CON BHA # 02 DIRECCIONAL Y BROCA DETALLE: PDC @ 2754' RIG: POZO: SINOPEC 156 AUCA-P178 EN PERFORACION ACAP-178 MD (Pies): 8,300 TVD (Pies): 8,023 PROD.ESTIMADA: (BPPD) DETALLE: PERFORANDO CON BHA # 4 CON PARAMETROS CONTROLADOS A 8300' RIG: POZO: SINOPEC 169 DRAGO NORTE-E062 EN PERFORACION DRRE-062 MD (Pies): 8,446 TVD (Pies): 7,365 PROD.ESTIMADA: (BPPD) SACANDO BHA #4 DIRECCIONAL EN VIAJE A LA ZAPATA DE 13-3/8" (POR 45 HRS DE DETALLE: PERFORACION) HASTA 6870' RIG: POZO: SINOPEC 220 OSO-G100 EN PERFORACION OSOG-100 MD (Pies): 4,380 TVD (Pies): 4,328.1 PROD.ESTIMADA: (BPPD) DETALLE: PERFORANDO CON BHA DIRECCIONAL # 3 CON BROCA PDC DE 16" A 4380 FT RIG: POZO: HILONG 18 EDEN YUTURI-J076 EDYJ-076 EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) DETALLE: TEC. SLB REALIZA EMPATE ENTRE CABLES, ( SIN TERMINAR). RIG: POZO: CCDC-052 AUCA-024 ACA-024 EN WORKOVER SUMARIO DE OPERACIONES PRODUCCION Y PERFORACION Página 4 de 7 Fecha de Impresión: 21/02/2015 7:21:42 MD (Pies): 9,700 TVD (Pies): 9,700 PROD.ESTIMADA: (BPPD) DETALLE: TÉCNICO SLB-ATL REALIZA EMPALME DE CABLE DE POTENCIA A CARRETO # 3 A 8,499 FT. RIG: POZO: DYGOIL-30 SHUSHUFINDI-H154 EN WORKOVER SHSH-154 MD (Pies): 8,420 TVD (Pies): 8,020.4 PROD.ESTIMADA: (BPPD) DETALLE: ESPERANDO POR LOCACIÓN PARA EL RIG DYGOIL 30. RIG: POZO: GEOPETSA-01 PARAHUACU-A021 EN WORKOVER PRHA-021 MD (Pies): 572.2 TVD (Pies): 572 PROD.ESTIMADA: (BPPD) BAJANDO BHA DE LIMPIEZA CON 6 1/8" BROCA EN 3 1/2" IF DRILL PIPE, MIDIENDO, DETALLE: CALIBRANDO Y SUBIENDO TUBO A TUBO DESDE LOS CABALLETES RIG: POZO: HILONG 28 PALMAR OESTE-A008 PLOA-008 EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) ESPERANDO LUZ DEL DIA PARA CONTINUAR CON LA MOVILIZACION DESDE CEDROS SUR HACIA DETALLE: PALMAR OESTE. EQUIPO MOVIDO 80% ARMADO 40% MINI CAM MOVIDO 0 % ARMADO 0% RIG: POZO: KEY 80051 SHUSHUFINDI-014 EN WORKOVER SHS-014 MD (Pies): 8,000 TVD (Pies): 8,000 PROD.ESTIMADA: (BPPD) CONT. BAJANDO BHA PUNTA LIBRE PARA TAPON BALANCEADO , NORMALIZANDO TORQUE EN DETALLE: JUNTAS DE DRILL PIPE ; MIDIENDO Y CALIBRANDO CADA 20 PARADAS RIG: POZO: KEY 80057 SHUSHUFINDI-I133 SHSI-133 EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) DETALLE: DESARMA BHA DE PRODUCCION SOBRE EQUIPO BES RIG: POZO: NABORS 794 PALO AZUL-N049H PLAN-049H EN WORKOVER SUMARIO DE OPERACIONES PRODUCCION Y PERFORACION Página 5 de 7 Fecha de Impresión: 21/02/2015 7:21:42 MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) DETALLE: TECNICO DE BAKER CENTRILIF CORTA CABLE A 7085 FT Y CAMBIA CARRETO. 06H00 FINALIZA RIG: POZO: NABORS 813 AUCA SUR-A018 ACSA-018S1 EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) BAJANDO BHA DE LIMPIEZA EN TANDEM CON BROCA 6-1/8" CON SCRAPER DE 7" Y 9 5/8" EN 3 DETALLE: 1/2" DP. A LAS 06H00 DENTRO DEL POZO 8300' RIG: POZO: NABORS 814 PALO AZUL-B010 PLAB-010S1 EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) DETALLE: REUNION DE SEGURIDAD (ATS) PREVIO A CONTINUAR CON MOVIMIENTO DESDE PATA-006. RIG: POZO: NABORS 815 OSO-B076 EN WORKOVER OSOB-076 MD (Pies): 9,348.5 TVD (Pies): 8,994.8 PROD.ESTIMADA: (BPPD) DETALLE: CIRCULANDO POZO PARA LIMPIEZA CON 3.0 BPM y 600 PSI. RIG: POZO: NABORS 819 YANAQUINCHA ESTE-A007 YNEA-007 EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) COORDINANDO ENVIO DE LA TUBERIA DE COMPLETACION DE 4-1/2" SEC DESDE EL BLOQUE 12 DETALLE: AL POZO YNEA 007 A CARGO DEL DEPARTAMENTO DE MATERIALES RIG: POZO: SAXON 47 ATACAPI-D029 ATCD-029 EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) DETALLE: SACANDO HERRAMIENTAS DE SLICKLINE SIN TERMINAR RIG: POZO: MD (Pies): SAXON 53 EDEN YUTURI-F117 EDYF-117 EN WORKOVER SUMARIO DE OPERACIONES PRODUCCION Y PERFORACION Página 6 de 7 Fecha de Impresión: 21/02/2015 7:21:42 TVD (Pies): PROD.ESTIMADA: (BPPD) DETALLE: DESARMANDO EQUIPO BES Y Y TOOL RIG: POZO: SAXON 55 SHUSHUQUI-002 SHH-002 EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA:200 (BPPD) DETALLE: EVALUANDO ARENA "U INFERIOR " (9100' - 9105') CON JET 11K A TANQUE BOTA DEL RIG. RIG: POZO: SINOPEC-905 EDEN YUTURI-G045 EN WORKOVER EDYG-045 MD (Pies): 5,900 TVD (Pies): 5,484.4 PROD.ESTIMADA: (BPPD) DETALLE: BAJANDO BHA DE CEMENTACION PARA REALIZAR TAPON BALANCEADO A ARENA "M1" RIG: POZO: TRIBOILGAS-006 PACAYACU-A006 PYAA-006 EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA:100 (BPPD) CONTINUA SACANDO COMPLETACION MECANICA EN 3 1/2" EUE TUBERIA CLASE B, MIDIENDO DETALLE: CADA 22 PARADAS HASTA 8500', RIG: POZO: TRIBOILGAS-101 CUYABENO-K063 CYBK-063 EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) SACANDO EQUIPO BES P18H EN 3-1/2" TUBERIA HQST-1. QUEBRANDO A LOS CABALLETES. 3600 DETALLE: FT FUERA DEL POZO. RIG: POZO: TRIBOILGAS-102 YULEBRA-A008 YLBA-008 EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) DETALLE: CAMBIANDO BLOQUE IMPRESOR DE 5 1/2'' POR 4''. RIG: POZO: MD (Pies): TVD (Pies): TRIBOILGAS-105 DRAGO NORTE-A011 DRRA-011 9,930 9,543.3 EN WORKOVER SUMARIO DE OPERACIONES PRODUCCION Y PERFORACION PROD.ESTIMADA: (BPPD) DETALLE: DESARMANDO BHA DE LIMPIEZA. RIG: POZO: TRIBOILGAS-107 VICTOR HUGO RUALES-009 VHR-009 EN WORKOVER MD (Pies): TVD (Pies): PROD.ESTIMADA: (BPPD) DETALLE: 06H00 LEVANTANDO SARTA+ RETIRANDO TUBING HANGER 7 1/16" x 3 1/2"EUE. DESCRIPCION DE UNIDADES: BPPD: Barriles de Petróleo por día Página 7 de 7 Fecha de Impresión: 21/02/2015 7:21:42
© Copyright 2025 ExpyDoc