NGO虹の会/インドネシア

Lembaga Pelangi
NGO虹の会
Sulawesi, Indonesia
アグネス・ランピセラ
Dorotea Agnes Rampisela
インドネシア スラウェシ島 マカサール ビリビリ灌漑地区
ビリビリ多目的ダム
1999年完成
農業用水路の更新及び新設 2004年終了
Project Map
水利組合
Bendung
Kampili Weir
S. Jeneberang River
POB/WeirKeeper
Bissua Weir
POB/
WeirKeeper
Bili-bili Weir
POB/
WeirKeeper
Herman
Juru Kampili
/Tehnical Assistant
Hasanuddin Nassa
Pengamat Kampili
/ Supervisor
Baso Barrung
Name of PPA/Gate Keepers
BL.1 10.8 ha
Abd. Azis (PNS)
haha
GP3A/ FWUA
MINASABAJI
500.60 ha (7)
BL.2 192.5 ha
Suhardi H.
haha
BL.3 201.1 ha
Arfan
BL.4 19.0 ha
Chaeruddin (PNS)
BL.5 63.7 ha
Syamsu Alam (PNS)
BL.6 13.5 ha
Mustari
BL.7 1896.8 ha
Syarifuddin T / Nawir J
BL.8 14.2 ha
BL.9 14.3 ha
Abd. Samad
BL.10 81.2 ha
Suardi
BL.11 23.4 ha
Sahabuddin
M.Ilyas Dg Laja
GP3A/FWUA
PALLANGGA
821.60 ha (16)
GP3A/FWUA
JATIA
Ramli Lalo
1075.20 ha(16)
M. Ilyas Sijaya
GP3A/FWUA
KALUKUANG
1257.70 ha (15)
Syarifuddin
Nompo
GP3A/FWUA
TUBARANIA
133.1 ha (7)
Syamsuddin
Tola
BL.12 59.2 ha
GP3A/FWUA
ASSAMATURU
829.90 ha(15)
Abd Majid Tutu
Makmur
BL.13 8.5 ha
BL.14 4331.6 ha
Syahrul/
Syamsuddin Dg.Ngitung
(PNS)
BL.15 43.1 ha
Muh. Akbar, S.Ag
BL.16 475.7 ha
Abd. Rasyid (PNS)
GP3A /FWUA
GALESONG UTARA
1210.26 ha (8)
Abdul Rasyid
GP3A/FWUA
PASSEREANTA
114.20 ha (15)
M. Basir Bate
GP3A/FWUA
SIRANNUANG
774,50 ha (18)
Syahrir Sitaba
BL.17 1579.6 ha
GP3A/FWUA
PARAIKATTE
536.1 ha (6)
Pata Romo
GP3A/FWUA
SIPAKAINGA
744.74 ha (10)
Muis Taba
Muchtar/Hasanuddin
Dg.Ngerang (PNS)
D
a
m
Waduk
Bili-bili
Reservoir
BALAI BESAR WS
National Management
Unit for Pompengan
Jeneberang
River Basin
(FirdausBagian PPK OPSDA 2)
農民参加の計画過程
1.住民参加による地図化
2. 問題発見
4. 関係住
民の取り
込み
3.現地踏査
5. 科学的発見についての情報共有
NGO『虹の会』(インドネシア名:Lembaga Pelangi)
Office : Jl. Pengayoman Komp. Gladiol No. A-8 Makassar
Tel. and Fax -62-411-441721
E-mail : [email protected]
1998/1999年 の活動
インドネシアと日本の小学
生の絵画の交換を通して、
両国の子供たちの友好関
係を深めるための展示会
地域ボランティアへの
豆乳の作り方講習会
2002年の活動
ポシアンドゥ(簡易保健所)で、母親
たちへ. 絵などを使った栄養指導
青年海外協力隊
栄養士隊員 高橋希
(2001年1月~2003年10月)
PRA (Participatory Rural Appraisal)
住民参加型 3次水路建設
青年海外協力隊 村落普及隊員
田中 洋子
(2001年8月~2004年1月)
■村・郡役人
■水利組合役員
■水利組合員
住民会議
2004年の活動から
農民が協力し合って、多くの水田 渡辺さん(JICA専門家夫人)に
に水が行渡るように、水路の清
よるタナバンカ村での洋裁教室
掃や補修を行う。
2005年
JICA水利組合強化プロジェクト 基礎調査
農民への聞き取り調査
ブロック毎に水
田の所有者を
確認
日本からのインターン生の受け入れ マカッサル市内にて、
「虹の会」の健康・栄養プログラムに参加
2008年の活動から
参加型評価
Thank you
very much
Main Issue
Water shortage during dry season
( first dry season crop and second dry season crop)
• Farmers opinion of the causes:
1. Original water supply to the
secondary is not enough
2. Some farmers do illegal tapping
NGO opinion : water master do
not execute their tasks as
expected
Researchers respond :
1. Validating with scientific data
Measure the water supply (quantity
and quality)
Estimate the water requirement
2. Get know the water master (MJ)
Discussion with NGO
Questionnaires to Water Master
Interviews
Identified Farmers solution:
Re-use of drainage water (from other WUA )
Utilize ground water (pumping)
Planting alternative crop (palawija)
Researchers respond: Validating with
scientific data
• Quantity/portion of re-use water
• Quantity/portion of ground water use
Comparing crop options
•Comparing water requirement of
mungbean and chili (saving water)
対象水利組合
2次水路
Majannang
3次
ブロック
Mg 4 ki
水利組合名
地域名
P3A Kolasa
Kelurahan Tubajeng
Pammase
3次水路
全長(m)
67,6
357
1.297,00
Desa Tangke Bajeng
Desa Tanabangka
Desa Gentungang
75,9
*
1.860,00
Desa Tanabangka
P3A Tangkeballa Desa Borimatangkasa
Pm 4 ki P3A Tuni Rannuang
受益面積 受益水田
(Ha)
枚数
Pm 6 ka
P3A Renggang
Desa Tanabangka
Desa Gentungang
88,5
604
1.974,00
Pm 6 ki
P3A Binabbasa
Desa Tanabangka
Desa Gentungang
56,5
*
653,15
受益面積合計 = 288,5ha
3次水路全長 = 5784,15m
Gotong-Royong
既設水路
Tanabangka村
(24 Agustus 03)
Researchers
1. Measurement
• water supply from irrigation channel (primary,
secondary)
• rainfall rate ( weather stations)
• Evaporation rate (lysimeter)
• Re-use water rate
• Ground water use
• Ground water level
• Water quality (surface water and ground water)
Collaboration
Mutual learning
NGO & FWUA
1. Conduct questionnaires survey
2. Assist or conduct measurement
edits
onparticipatory
one single document.
3. Simultaneous
Provision of data
from
research with
No
more waiting your turn or managing
farmers
• multiple
Irrigation versions.
water coverage
• Irrigation water flow in several WUAs
• It’s
Listabout
of WUAteam
members
work, will get you there.
• WUA maps
• Production rate
• Cropping pattern
2. Communication and
collaboration
• Questionnaires
• Interviews
• Action research