Lembaga Pelangi NGO虹の会 Sulawesi, Indonesia アグネス・ランピセラ Dorotea Agnes Rampisela インドネシア スラウェシ島 マカサール ビリビリ灌漑地区 ビリビリ多目的ダム 1999年完成 農業用水路の更新及び新設 2004年終了 Project Map 水利組合 Bendung Kampili Weir S. Jeneberang River POB/WeirKeeper Bissua Weir POB/ WeirKeeper Bili-bili Weir POB/ WeirKeeper Herman Juru Kampili /Tehnical Assistant Hasanuddin Nassa Pengamat Kampili / Supervisor Baso Barrung Name of PPA/Gate Keepers BL.1 10.8 ha Abd. Azis (PNS) haha GP3A/ FWUA MINASABAJI 500.60 ha (7) BL.2 192.5 ha Suhardi H. haha BL.3 201.1 ha Arfan BL.4 19.0 ha Chaeruddin (PNS) BL.5 63.7 ha Syamsu Alam (PNS) BL.6 13.5 ha Mustari BL.7 1896.8 ha Syarifuddin T / Nawir J BL.8 14.2 ha BL.9 14.3 ha Abd. Samad BL.10 81.2 ha Suardi BL.11 23.4 ha Sahabuddin M.Ilyas Dg Laja GP3A/FWUA PALLANGGA 821.60 ha (16) GP3A/FWUA JATIA Ramli Lalo 1075.20 ha(16) M. Ilyas Sijaya GP3A/FWUA KALUKUANG 1257.70 ha (15) Syarifuddin Nompo GP3A/FWUA TUBARANIA 133.1 ha (7) Syamsuddin Tola BL.12 59.2 ha GP3A/FWUA ASSAMATURU 829.90 ha(15) Abd Majid Tutu Makmur BL.13 8.5 ha BL.14 4331.6 ha Syahrul/ Syamsuddin Dg.Ngitung (PNS) BL.15 43.1 ha Muh. Akbar, S.Ag BL.16 475.7 ha Abd. Rasyid (PNS) GP3A /FWUA GALESONG UTARA 1210.26 ha (8) Abdul Rasyid GP3A/FWUA PASSEREANTA 114.20 ha (15) M. Basir Bate GP3A/FWUA SIRANNUANG 774,50 ha (18) Syahrir Sitaba BL.17 1579.6 ha GP3A/FWUA PARAIKATTE 536.1 ha (6) Pata Romo GP3A/FWUA SIPAKAINGA 744.74 ha (10) Muis Taba Muchtar/Hasanuddin Dg.Ngerang (PNS) D a m Waduk Bili-bili Reservoir BALAI BESAR WS National Management Unit for Pompengan Jeneberang River Basin (FirdausBagian PPK OPSDA 2) 農民参加の計画過程 1.住民参加による地図化 2. 問題発見 4. 関係住 民の取り 込み 3.現地踏査 5. 科学的発見についての情報共有 NGO『虹の会』(インドネシア名:Lembaga Pelangi) Office : Jl. Pengayoman Komp. Gladiol No. A-8 Makassar Tel. and Fax -62-411-441721 E-mail : [email protected] 1998/1999年 の活動 インドネシアと日本の小学 生の絵画の交換を通して、 両国の子供たちの友好関 係を深めるための展示会 地域ボランティアへの 豆乳の作り方講習会 2002年の活動 ポシアンドゥ(簡易保健所)で、母親 たちへ. 絵などを使った栄養指導 青年海外協力隊 栄養士隊員 高橋希 (2001年1月~2003年10月) PRA (Participatory Rural Appraisal) 住民参加型 3次水路建設 青年海外協力隊 村落普及隊員 田中 洋子 (2001年8月~2004年1月) ■村・郡役人 ■水利組合役員 ■水利組合員 住民会議 2004年の活動から 農民が協力し合って、多くの水田 渡辺さん(JICA専門家夫人)に に水が行渡るように、水路の清 よるタナバンカ村での洋裁教室 掃や補修を行う。 2005年 JICA水利組合強化プロジェクト 基礎調査 農民への聞き取り調査 ブロック毎に水 田の所有者を 確認 日本からのインターン生の受け入れ マカッサル市内にて、 「虹の会」の健康・栄養プログラムに参加 2008年の活動から 参加型評価 Thank you very much Main Issue Water shortage during dry season ( first dry season crop and second dry season crop) • Farmers opinion of the causes: 1. Original water supply to the secondary is not enough 2. Some farmers do illegal tapping NGO opinion : water master do not execute their tasks as expected Researchers respond : 1. Validating with scientific data Measure the water supply (quantity and quality) Estimate the water requirement 2. Get know the water master (MJ) Discussion with NGO Questionnaires to Water Master Interviews Identified Farmers solution: Re-use of drainage water (from other WUA ) Utilize ground water (pumping) Planting alternative crop (palawija) Researchers respond: Validating with scientific data • Quantity/portion of re-use water • Quantity/portion of ground water use Comparing crop options •Comparing water requirement of mungbean and chili (saving water) 対象水利組合 2次水路 Majannang 3次 ブロック Mg 4 ki 水利組合名 地域名 P3A Kolasa Kelurahan Tubajeng Pammase 3次水路 全長(m) 67,6 357 1.297,00 Desa Tangke Bajeng Desa Tanabangka Desa Gentungang 75,9 * 1.860,00 Desa Tanabangka P3A Tangkeballa Desa Borimatangkasa Pm 4 ki P3A Tuni Rannuang 受益面積 受益水田 (Ha) 枚数 Pm 6 ka P3A Renggang Desa Tanabangka Desa Gentungang 88,5 604 1.974,00 Pm 6 ki P3A Binabbasa Desa Tanabangka Desa Gentungang 56,5 * 653,15 受益面積合計 = 288,5ha 3次水路全長 = 5784,15m Gotong-Royong 既設水路 Tanabangka村 (24 Agustus 03) Researchers 1. Measurement • water supply from irrigation channel (primary, secondary) • rainfall rate ( weather stations) • Evaporation rate (lysimeter) • Re-use water rate • Ground water use • Ground water level • Water quality (surface water and ground water) Collaboration Mutual learning NGO & FWUA 1. Conduct questionnaires survey 2. Assist or conduct measurement edits onparticipatory one single document. 3. Simultaneous Provision of data from research with No more waiting your turn or managing farmers • multiple Irrigation versions. water coverage • Irrigation water flow in several WUAs • It’s Listabout of WUAteam members work, will get you there. • WUA maps • Production rate • Cropping pattern 2. Communication and collaboration • Questionnaires • Interviews • Action research
© Copyright 2024 ExpyDoc