Mar. 4 2014 SolarEdge Inverter Compliance with HECO Fast Trip Requirement Hawaiian Electric Companies (HECO) has introduced a Transient Over Voltage (TOV) mitigation requirement for fast PV system tripping in cases of grid over-voltage, to prevent risks associated with these transient overvoltages. To comply with this requirement, a fast-acting transformer switch may be used, or a compliant inverter. A compliant inverter is an inverter that trips within 1 cycle (16ms) when the grid voltage exceeds 120% of nominal grid voltage and has a time delay of at least 5 minutes before resetting. SolarEdge inverters with CPU firmware version 2.640 and higher are compliant with this requirement. To demonstrate this compliance, over-voltage scenarios were simulated in the lab and the inverter’s disconnection time was measured. Single Phase Inverter Measurements Measurements were made for both a 240Vac grid and a 208Vac grid. For each grid three measurements were made. The results below are those with the longest trip time. Three Phase Inverter Measurements Measurements were made for a 120/208Vac grid. SolarEdge Technologies | www.solaredge.com USA Germany Italy Japan Israel China 3347 Gateway Boulevard, Fremont, CA, 94538 Bretonischer Ring 18, 85630 Grasbrunn (Munich) VISMUNDA SRL, Corso Del Popolo 50/A, Treviso B-9 Ariake Frontier Building, 3-7-26 Ariake, Koto-Ku, Tokyo 135-0063 6 HeHarash St. P.O.Box 7349, Neve Neeman, Hod Hasharon 45240 City Center, 100 Zunyi Road, Building A, Unit 1204, Shanghai 200051 Measurement #1 – Single phase inverter, 240V grid Vstart = 276V Vthreshold = 288V (=1.2 x 240V) Vfinal = 300V Trip time = 13.7ms SolarEdge Technologies | www.solaredge.com USA Germany Italy Japan Israel China 3347 Gateway Boulevard, Fremont, CA, 94538 Werner-Eckert-Straße 6, Munich 81829 VISMUNDA SRL, Corso Del Popolo 50/A, Treviso B-9 Ariake Frontier Building, 3-7-26 Ariake, Koto-Ku, Tokyo 135-0063 6 HeHarash St. P.O.Box 7349, Neve Neeman, Hod Hasharon 45240 City Center, 100 Zunyi Road, Building A, Unit 1204, Shanghai 200051 Measurement #2 – Single phase inverter, 208V grid Vstart = 240V Vthreshold = 249.6V (=1.2 x 208V) Vfinal = 260V Trip time = 13.8ms SolarEdge Technologies | www.solaredge.com USA Germany Italy Japan Israel China 3347 Gateway Boulevard, Fremont, CA, 94538 Werner-Eckert-Straße 6, Munich 81829 VISMUNDA SRL, Corso Del Popolo 50/A, Treviso B-9 Ariake Frontier Building, 3-7-26 Ariake, Koto-Ku, Tokyo 135-0063 6 HeHarash St. P.O.Box 7349, Neve Neeman, Hod Hasharon 45240 City Center, 100 Zunyi Road, Building A, Unit 1204, Shanghai 200051 Measurement #3 – Three phase inverter, 120/208V grid Vstart = 120Vrms Vthreshold = 144Vrms (=1.2 x 120V) Trip time = 14.4ms SolarEdge Technologies | www.solaredge.com USA Germany Italy Japan Israel China 3347 Gateway Boulevard, Fremont, CA, 94538 Werner-Eckert-Straße 6, Munich 81829 VISMUNDA SRL, Corso Del Popolo 50/A, Treviso B-9 Ariake Frontier Building, 3-7-26 Ariake, Koto-Ku, Tokyo 135-0063 6 HeHarash St. P.O.Box 7349, Neve Neeman, Hod Hasharon 45240 City Center, 100 Zunyi Road, Building A, Unit 1204, Shanghai 200051
© Copyright 2024 ExpyDoc