1 FIR MILANO - LIMM 1.1 Carta aeroportuale ICAO BERGAMO Orio

BERGAMO Orio al Serio
1
ICAO: LIME
FIR
MILANO - LIMM
1.1
Carta aeroportuale ICAO
FINAL LAYOUT (Work in progress)
CONFIGURAZIONE FINALE (Lavori in corso)
IATA:BGY
REV 03.2014
2
Piste e procedure comuni
Runway and common procedures
- RWY 28 – QFU 284° | ILS Approach | ILS BRM 108.70 (284°) – Left traffic pattern
- RWY 10 – QFU 104° | No Instrumental app., circling ONLY South - Right traffic pattern
- RWY 12 – QFU 120° | Solo VFR – Only VFR - Left traffic pattern
- RWY 30 – QFU 300° | Solo VFR – Only VFR - Right traffic pattern
2.1
Frequenze
Frequencies
Callsigns
Istruzioni
Instruction
Una volta connessi, contattare la prima frequenza
disponibile fra le seguenti, partendo dall’alto:
Settori - Nominativi – Frequenze
Once connected, contact the first available
frequency, starting from top:
Callsigns
Sectors - Frequencies
Orio Ground
LIME_GND
120.500
Orio Tower
LIME_TWR
118.500
Milano Radar
LIMM_LAR_APP
133.175
Milano Radar
LIMM_ANE_APP
126.750
Milano Radar
LIMM_SWS_CTR
135.455
Milano Informazioni
2.2
Punti di arrivo IFR
IFR
124.925
LIMM_N_FSS
Arrival Points IFR
IFR
ODINA – LUSIL – OSKOR – TOP – GEN – PAR – IDONA – ELTAR
2.3
Punti VFR
VFR
Point VFR
VFR
Alzano Lombardo (North) – Rovato (East) – Trezzo sull'Adda (West) – Romano di Lombardia (South)
Circuiti VFR / VFR Patterns
Rwy 28 – Rwy 12
LEFT Traffic patterns
Rwy 10 – Rwy 30
RIGHT Traffic patterns
2.4
Uso preferenziale piste / Preferred Runways
PARTENZE / DEPARTURE
28
ARRIVI / ARRIVAL
28
ILS
28 X – Y – Z
284°
-
108.7
During the work due to the shutdown of
the LOC BRM will be suspended ILS-Z,
ILS-Y and ILS-X RWY 28; will also be
suspended the Low Visibility Procedures.
Durante i lavori causa lo spegnimento
del LOC BRM saranno sospese le
procedure ILS-Z, ILS-Y e ILS-X
della Rwy 28; saranno anche sospese le
Procedure in Bassa visibilità.
To this, a new TEMPORARY
RNAV RWY 28 was published.
Per questo, è stata istituita una nuova
PROCEDURA TEMPORANEA
RNAV RWY 28.
Tale procedura entrerà in vigore dal
giorno 8 MARZO fino a termine lavori
(data da stabilire).
This procedure shall enter into force
on the 8th MARCH until end work
(date to be determined).
2.5
SIDs Rwy 28
Route
ICP
ABESI - CANNE
ARLES – LAGEN
NEDED - OMETO
DILEB - OSKOR
GEN – KARPI – VOG
PAR
BEG5X
SRN6R
ORI5X
BEKAN5X
DORIN5X
2.6
Alt
ABESI8T - CANNE8T
ARLES8R – LAGEN9R
NEDED9R - OMETO8R
DILEB7S - OSKOR8T
4000
GEN8S – KARPI8S - VOG8S
4000
PAR8S
4000
4000
4000
SIDs Rwy 10
Route
ICP
ARLES - ABESI
CANNE - OMETO
BEG5Y
DILEB - OSKOR
GEN – KARPI – VOG
PAR
ORI5Y
BEKAN5Y
DORIN5Y
3
Trans
Trans
ARLES9T – ABESI8T
CANNE8T - OMETO9T
DILEB7S - OSKOR8T
GEN8S – KARPI8S - VOG8S
PAR8S
Alt
4000
4000
4000
4000
Altitudine di transizione / Livello di transizione
TA
6000 ft
6000 ft
TRL
QNH < 977 hPa → FL 85
977hPa ≤ QNH < 995 hPa → FL 80
995 hPa ≤ QNH < 1013 hPa → FL 75
QNH ≥ 1013 hPa → FL 70
QNH < 977 hPa → FL 85
977hPa ≤ QNH < 995 hPa → FL 80
995 hPa ≤ QNH < 1013 hPa → FL 75
QNH ≥ 1013 hPa → FL 70