21312 Nijmegen Waalkade ENG.indd

Waalkade - QUAY WALL
Nijmegen
Location:
Nijmegen
Client:
Gemeente Nijmegen
Project description:
Replacing sheet piling on the
west side of the Waalkade Nijmegen
Desgin, Execution and Maintain
Aannemerscombinatie
Colijn Aannemersbedrijf en Reef
Infra
Project information
On the quay wall, named “de Waalkade”, between the Grotestraat and
the railway bridge at Nijmegen, work is in progress for the replacement
of 660 meter long, instable steel sheet piling.
The contractors consortium Reef Infra B.V. and Colijn Aannemersbedrijf
B.V replaces the 12 meter long steel sheet pilings for sheetpiling of 26
meter long.
Even the complete anchoring will be replaced. The new sheet piling
construction is calculated for still keep getting bigger and larger vessels,
those sail across the Waal.
After a while the east side must be tackled, and then the west side. At
last, when work will be started again in the middle section.
The replacement of the steel sheet piling was scheduled and completed
at the end of 2013 and in the last two months the quay that was also
decorated in the last two months.
This project will be executed in four phases.
The quay should be sufficient the next 100 years.
Execution period: June 2013 til 1st of March 2014
COLIJN Aannemersbedrijf B.V.
Vierlinghstraat 17
Postbus 66
T: 0183 40 10 11
I: www.colijn.nl
l
l
l
l
4251 LC Werkendam
4250 DB Werkendam
F: 0183 40 35 83
E: [email protected]
l
l
l
l