UNCLASSIFIED Presented to: MRL Government / Industry Workshop MRL Deskbook Section 6 Contract Language Distribution authorized to DoD and DoD contractors only; Critical Technology; August 2001. Other requests for this document shall be referred to the U.S. Army RDECOM, ATTN: RDMR-SEP. Presented by: Steve Watts Date: 25 Sep 12 Team Leader UNCLASSIFIED Aviation and Missile Research, Development and Engineering Center UNCLASSIFIED Task 2 • Review Section 6 “Applying MRLs in Contract Language” • MRL Deskbook, version V2.01, dated Jul 11 • Determine if templates for Section L, Section M, SOO, and SOW are adequate • Provide any recommended changes • Task assigned to Air Force, Navy, and Army members that implement these requirements in contracts (“the magnificent three”) – Army – Steve Watts – Air Force – Dave Karr – Navy – Brent Gordon UNCLASSIFIED Yourfilename.ppt UNCLASSIFIED Summary of Recommended Changes • Target vs. Required MRL – • General clean-up for clarity and readability – • Eliminate the example (add statement to follow rating procedure in SSEB Plan) Additional wording in sample paragraph. SOW Section – – 3 3 lines that use auto spacing (make consistent with rest of document) Delete reference to specific Deskbook version (reference website only) Delete reference to MMP (too overwhelming for RFP) - address general approach Section M – – • change wording to SOO "and/or SOW" (some services don't use SOOs). Section L – – – • Where the Deskbook provides a sample paragraph - make it italic and 1 paragraph Section 6.3 – • Change "required" to "target" MRLs (several places) Add checklist of typical items to address Still provide sample paragraph (with a few adjustments) UNCLASSIFIED Yourfilename.ppt UNCLASSIFIED SOW Checklist Checklist of the typical requirements to be addressed in the SOW • Contractor shall support assessments of Manufacturing Readiness • Assessment conducted using MRL Deskbook as a guide (www.dodmrl.org) • Identify timing of assessment or assessments • Identify target MRL • Government led review of prime, Prime led review of suppliers (using MRL Deskbook as a guide) • Selection of suppliers using MRL Deskbook Section 4.3 as a guide • Manufacturing Maturation Plan (MMP) for all criteria not at target MRL • Contractor provide status at all Program Reviews • Ensure appropriate language is in place to adequately support the efforts identified in the threads 4 UNCLASSIFIED Yourfilename.ppt UNCLASSIFIED Word Document (with Track Changes) 5 • Attached is the Section 6 Word Document with “Track Changes” • This attachment has been updated to incorporate comments provided at the 22 May 12 and 24 Jul 12 MRL Working Group meetings UNCLASSIFIED Yourfilename.ppt
© Copyright 2025 ExpyDoc