Practice of EIA Inquiry Committee in Japanese Local Governments IAIA 27th Annual Conference 6 June 2007 Seoul, KOREA Shigeo NISHIKIZAWA and Yasuhiro FUJII The University of Shiga Prefecture 1 Viewpoint and Objective • Transparency • Third Party Check System EIC=EIA Inquiry Committee : Local Governments To examine the validity of EIA • Procedures of inquiry are left to … Ordinances or discretion To clarify the practical conditions of EIC 2 Methodology • Ordinances or Guidelines of EIA • Panel Survey ( Nov.-Dec., 2006 ) 56 Local Governments:collecting rate=100% 44 Prefectures + 12 Ordinance-designated cities EIA officer answer on the basis of… projects within 5 years 3 Questionnaire • Contents of the Inquiry by EIC EIA guideline?, Scoping document?, DEIS? …etc • Member of EIC The number of committee members?, Officer’s opinion of committee member? • Procedures of inquiry Period for inquiry?, Committees conduct project-site survey? • Disclosure of EIC Meeting?, Minute?, Announcement on the internet? 4 Contents of inquiry regulated by ordinance ~56 Local Governments~ Contents of Inquiry Number of Local Gov. Guideline of EIA tech. 53 Scoping Document 41 3 (95%) (73%) Yamanashi Pref., Toyama Pref., 51 (91%)city Fukuoka Pref. and Yokohama DEIS FEIS 4 Follow Up Document 47 5 0% 4 1 (84%) 20 21 15 25% compulsory 3 12 50% discretion 75% 100% no provision 5 Practical condition of Inquiry ~no provision, discretion~ Contents of Inquiry Guideline of no provision 1 2 EIA Tech. Scoping Document discretion 12 no provision Fukuoka Pref. 3 discretion DEIS All committees have examined for all project examine 4 no provision 1 All committees haven’t examined except for Okinawa Pref. discretion 1 4 FEIS not examine no provision 47 discretion 2 Follow up Document no provision 1 0 19 Only Shizuoka, Okinawa and Kagawa Pref. have examined 19 10 20 30 Number of Local Gov. 40 506 Reality and Ideal of Committee Member Number of Local Gov. 60 56 56 Realities Ideal (Officer’s opinion) 50 EIA system experts are not enough 41 37 40 35 Kawasaki City: necessity to be appointed by PA 29 30 42 23 20 10 0 0 EIA System Ecology Climate Change 1 Sustainability Public Science Advertisement Committee Member’s Major field 7 Procedure: Period for inquiry Month Completion of Scoping ~ Submission of DEIS 48 Max :Longest period project 42 Min :Shortest period project 36 30 Spend more than 1 year in order to consider impact caused by the changes of seasons 24 3 days 18 12 Proponents have conducted the greater part of the survey at the scoping process 6 Kawasaki Kit a- Kyu sh u Fu ku o ka Eh im e Hir o sh im a Yo ko h am a Sh iga Iwat e Kyo t o Ao m o r i Osaka Osaka C it y Aic h i Gifu Sh im an e Ku m am o t o Fu ku o ka C it y Local Governments Sappo r o Kan agawa Fu ku sh im a M iyazaki Yam agu c h i To kyo Nago ya Sait am a Niigat a Nagasaki Tiba M ie Se n dai Hir o sh im a Okayam a Okin awa 0 8 Project‐site survey conducted by the committee Project Phase Saitama Pref. Yamanashi Pref. have 40 conducted at the all stages. 202 Project Project Implementation Implementation (n=51) (n=51) 0% 4 40 3 3 4 6 4 9 14 Most of committees have conducted at either stage 20 6 4 8 9 6 6 14 39 202 8 39 Project10 2 10Project Completion Completion (n=50) (n=50) 3 Number of Local governments Scoping Scoping (n=56) 20 (n=56) DEIS DEIS (n=53) (n=53) 3 37 2 10 0% 10 25% everytime Conduct conduct everytime 37 25% conduct 50% 50% fifty-fifty fifty-fifty fifty-fifty 75% 75% 100% not Do conduct at at all all not Conduct not conduct 9 100 Disclosure of EIC confere nce Minutes open closed open 50 6 full text specify the name announce on the web not announce on the web withhold the name 13 13 37 11 summary 15 closed Inquiry Report open 4 announce on the web not announce on the web 12 37 closed Member List open 52 49 0 announce on the web not announce on the web 43 13 closed 56 0 announce on the web Committee of Saitama Pref. is so excellent in Scoping Document, DEIS etc announce on the information disclosure that satisfiesnot all conditions. web 14 42 10 56 Conclusions 1)It is cleared that most committees examine scoping documents and DEISs. To the contrary, few committees examine FEIS and follow up documents. 2)All of the committees appoint ecology-experts. However, EIA system-experts are appointed at a few committees because of short supply. 3)Most of survey for EIA have been completed for less than one year. It implies that the greater part of survey have been conducted at the scoping process. 4 ) Saitama prefecture’s committee has been taking appropriate measures for disclosure. In future, it should be improved the announcement on the internet in many local governments.11
© Copyright 2024 ExpyDoc