LG SCIENCE PARK CASE STUDY MASTERPLAN EVOLUTION INTERIOR DESIGN PROJECT COMPONENTS A F F I L I AT E L A B O R AT O R I E S LANDSCAPE AND THE PUBLIC REALM ADJACENCIES & FLOWS ARCHITECTURAL CHARACTER S U S TA I N A B L E DESIGN MEP ENGINEERING Project Size: • Site Area: LG 6 Affiliates: 133,000m2 • GBA: 790,000m2 • Staff No: 15,000 • Const. Cost: $2.1 Billion USD Comparable Projects: • 10 x size of Francis Crick Institute • 200,000m2 larger than KAUST PROJECT OVERVIEW 1. 2. 3. 4. 5. 6. LG Electronics LG Hausys LG Chemical LG Innotek LG Display LG Life Science Other Components: • Integrated Support Centre • Exhibition/Seminar • Support facilities • Sports facilities • VIP • Other • Food Hall/Canteen LG: SCIENCE PARK LG SCIENCE PARK 마스터 플랜의 기본 개념 | MASTERPLAN EVOLUTION ISC LG DISPLAY LG HAUSYS LG CHEM LG LIFE SCIENCES LG ELECTRONICS CENTRAL PROMENADE LG CHEM SLC CONCEPT DIAGRAM / ADJACENCIES LG INNOTEK 마스터 플랜의 기본 개념 | MASTERPLAN EVOLUTION DP2 DP3 LGE LGE LGE LGE LGE LGE 실험동 SITEPLAN EVOLUTION ISC SLC LGD LGIT LGH LGC LGC LGLS LGE LGE LGE ISC LGE LGE LGE SLC 2 단계 FINAL SITEPLAN 1 단계 LGD LGH LGIT 1 단계 LGLS LGC LGC 2 단계 PROJECT CHALLENGES: • FAST TRACK PROGRAMME • PROJECT SIZE / COMPLEXITY • MAJORITY NEW HOK TEAM • COMPLEX BUILDING TYPOLOGIES • CULTURAL DIFFERENCES/LEARNING • ONGOING CHANGE • CONSULTANT TEAM LOCATION PROJECT CHALLENGES PROJECT CHALLENGE RESPONSE: • Division of project into manageable workstreams with defined team ownership • Workstream definition to promote communication / coordination Project Workstream Split • Clarity as to management structure, responsibility and ownership • Ownership provides responsibility; promotes leadership • Workstreams defined BIM model split/Ownership BIM Model Ownership/Responsibility TEAM STRUCTURE / MODEL DIVISION Project Team Structure MASTERPLAN BUILDING COMPONENTS: LG Other Affiliates (DP3) LG Electronics (DP2) Integrated Support Centre / Shared Lab Centre (shared resources for all affiliates) Campus Restaurant (to cater for 15,000 staff for lunch) FM Corridor (service for all buildings on site) BIM ESSENTIAL FOR COMPLETING BLOCK AND STACK DIAGRAMS TO MEET CLIENT AREA REQUIREMENTS TEAM STRUCTURE / MODEL DIVISION BIM MODEL DIVISON: Models • 16 Models • 20 – 30 BIM Staff in models at any one time • Ownership / Responsibility Key for Success AR/SS RG/EB JE/YY LG-HOK-AR-BASE LG-HOK-AR-DOC LG-HOK-AR-DP2N LG-HOK-AR-DP2S LG-HOK-AR-DP3N LG-HOK-AR-DP3S LG-HOK-AR-GRID LG-HOK-AR-ISCN LG-HOK-AR-ISCS LG-HOK-AR-M_OPT LG-HOK-AR-SHELL-ISC TL/MP TEAM STRUCTURE / MODEL DIVISION LG-HOK-AR-SHELL LG-HOK-ID-DP2N LG-HOK-ID-DP2S LG-HOK-EQ-DP3N LG-HOK-EQ-DP3S LG-HOK-LA-SITE TOTALS: 938 MB GEOMETRY • Building geometry is largely rectilinear and relatively simple in form • Complexity of project is from the internal planning/coordination of the project; Swiss watch analogy Simple Form Buildings Rectilinear Building Blocks • Each LG Affiliate had differing S&T requirements meaning different grid/core arrangements • Connectivity and flow essential for operational criteria and to encourage communication & collaboration Complex Internal Planning / Flows GEOMETRY BIM BOUNDARIES / INTERFACE: Façade / Envelope Car Park/Restaurant/Utilities B1 INTERNAL CIRCULATION 중앙식당(DP3) DP3 CENTRAL DINING ACCESS, FLOWS AND CIRCULATION (OFFSET CORE) Structures Cores / VT Science Planning / Interior Design Public Realm / Landscape MEP / Plant 중앙식당(DP2) DP2CENTRAL DINING ACCESS, FLOWS AND CIRCULATION (CENTRE CORE) BIM BOUNDARIES / INTERFACE MODEL INTERFACE MANAGEMENT DP2 MODEL (RG) SHELL MODEL (JE) LEVELS (DS) VARIABLE SAWTOOTH PANEL (YY) DP2 (RG) OFFSETS / SETTING OUT (JE) 10 FAÇADE TYPOLOGIES DP2 - ID (MD) 4-6 PANEL TYPES PER FAÇADE (BETWEEN 40-60 VARIATIONS ON A THEME) GEOMETRY – MODEL INTERFACE MANAGEMENT INCREMENTAL ANGULATION CUSTOM SCISSOR STAIRS (RG) CONSULTANT BIM COORDINATION MAJOR CONSULTANTS: London/Wales: Structure, Civils, Specialist Engineering Boston, USA: MEP & Sustainability CONSULTANT BIM COORDINATION DRAWING REVIEW IMPLEMENTATION • First pass drawing review / mark up to establish drawing exemplar • BIM Task Table to identify BIM model actions required • ‘Define & Assign’ actions / ownership • Finished drawing completed to exemplar standard TOOLS & TEMPLATES DRAWING SHEET TOOLS • Sheet template • View template filter • Keyplan template • Department legend template • BIMLINK to translate room/sheet names into Korean – big timesaver TOOLS & TEMPLATES BIM USAGE FOR SUSTAINABILITY: • Sustainable Project Criteria: • Lab Buildings: LEED Silver • ISC Build: LEED Platinum + • BIM model used for sustainable design studies/calcs (solar/thermal studies, daylight analysis, window to wall ratios, etc.) 아트리움 일조권 분석 에너지 시뮬레이션 분석 BIM USAGE FOR SUSTAINABILITY 아트리움 내부공간 BIM MODEL VISUALISATION USAGE: • Model views set from Navisworks (also used for internal/Client interim reviews) • Model & view then issued to visualisation company for final render VISUALISATION LG SCIENCE PARK • Masterplan / Concept Design / Scheme Design of 790,000m2 • Completed in 6 months led by HOK London • HOK Team size 42 (at max) ‘Integration of Design Team/Model Management Process was Key to Delivering Largest S&T Campus in the World’ (at time of design completion)
© Copyright 2024 ExpyDoc