BATON ROUGE METROPOLITAN AREA TRANSPORTATION IMPROVEMENT PROGRAM (2015-2018) (Financially Constrained) Highway Element State Proj No. H.000337 H.000337 H.000337 H.000464 H.000464 H.000464 H.000466 H.000466 H.000466 H.000466 MTP No. 139 139 139 140 140 140 140 H.000698 H.000698 H.000698 H.001234 H.001234 H.001234 H.001603 H.001603 H.001603 H.002290 H.002290 H.002290 H.002301 H.002301 H.002301 H.002320 H.002320 H.002320 H.002337 H.002337 H.002337 H.002344 H.002344 H.002344 H.002344 H.002344 H.002370 H.002370 H.002370 H.002370 H.002370 H.002370 H.002370 H.002373 H.002373 H.002373 H.002373 H.002375 H.002375 H.002375 H.002375 H.002423 H.002423 H.002423 H.002423 H.002822 H.002822 H.002822 H.003047 H.003047 H.003047 H.003047 H.003790 H.003790 H.003790 H.003790 H.004634 H.004634 H.004634 H.004634 110 110 110 109 109 109 119 119 119 122 122 122 101 101 101 101 101 101 101 141 141 141 141 120 120 120 136 136 136 136 103 103 103 103 Parish ASC ASC ASC LIV LIV LIV LIV LIV LIV LIV EBR EBR EBR WBR WBR WBR EBR EBR EBR EBR EBR EBR EBR EBR EBR EBR EBR EBR EBR EBR EBR EBR EBR EBR EBR EBR ASC ASC ASC ASC ASC ASC ASC LIV LIV LIV LIV LIV LIV LIV LIV ASC ASC ASC ASC EBR EBR EBR EBR EBR EBR EBR ASC ASC ASC ASC LIV LIV LIV LIV Route US 61 US 61 US 61 US 190, LA 1026 US 190, LA 1026 US 190, LA 1026 US 190 US 190 US 190 US 190 US 61 US 61 US 61 LA 1 LA 1 LA 1 LA 73 LA 73 LA 73 LA 64 LA 64 LA 64 N. Sherwood Forest Blvd N. Sherwood Forest Blvd N. Sherwood Forest Blvd Sullivan Rd Sullivan Rd Sullivan Rd LA 327 LA 327 LA 327 LA 427 LA 427 LA 427 LA 427 LA 427 LA 42 LA 42 LA 42 LA 42 LA 42 LA 42 LA 42 LA 16 LA 16 LA 16 LA 16 LA 16 LA 16 LA 16 LA 16 LA 44 LA 44 LA 44 LA 44 LA 30 LA 30 LA 30 I-10 I-10 I-10 I-10 LA 930 LA 930 LA 930 LA 930 Juban Rd Juban Rd Juban Rd Juban Rd Proj Limits Bayou Manchac & Francois Brs. Bayou Manchac & Francois Brs. Bayou Manchac & Francois Brs. US 190 & LA 1026 (Roundabout) US 190 & LA 1026 (Roundabout) US 190 & LA 1026 (Roundabout) Intersection Improvements @ Eden Church Intersection Improvements @ Eden Church Intersection Improvements @ Eden Church Intersection Improvements @ Eden Church Baker Canal Bridge Baker Canal Bridge Baker Canal Bridge Port Allen Canal Bridge Port Allen Canal Bridge Port Allen Canal Bridge Old Jefferson Hwy @ Antioch Rd Old Jefferson Hwy @ Antioch Rd Old Jefferson Hwy @ Antioch Rd LA 19 to McHugh Rd LA 19 to McHugh Rd LA 19 to McHugh Rd Choctaw Dr - Greenwell Springs Rd Choctaw Dr - Greenwell Springs Rd Choctaw Dr - Greenwell Springs Rd Wax - Hooper Rd Wax - Hooper Rd Wax - Hooper Rd Bayou Fountain Bayou Fountain Bayou Fountain Perkins Rd (Siegen - Highland) Perkins Rd (Siegen - Highland) Perkins Rd (Siegen - Highland) Perkins Rd (Siegen - Highland) Perkins Rd (Siegen - Highland) US 61 to LA 44 US 61 to LA 44 US 61 to LA 44 US 61 to LA 44 US 61 to LA 44 US 61 to LA 44 US 61 to LA 44 LA 16 @ LA 22 LA 16 @ LA 22 LA 16 @ LA 22 LA 16 @ LA 22 Amite R. BR. Near French Settlement Amite R. BR. Near French Settlement Amite R. BR. Near French Settlement Amite R. BR. Near French Settlement Black bayou Bridge Replacement Black bayou Bridge Replacement Black bayou Bridge Replacement Black bayou Bridge Replacement Nicholson Dr @ Brightside Ln Nicholson Dr @ Brightside Ln Nicholson Dr @ Brightside Ln Pecue Ln / I-10 Interchange Pecue Ln / I-10 Interchange Pecue Ln / I-10 Interchange Pecue Ln / I-10 Interchange Causey Rd to LA 42 Causey Rd to LA 42 Causey Rd to LA 42 Causey Rd to LA 42 Juban Rd Widening (I-12 - US 190) Juban Rd Widening (I-12 - US 190) Juban Rd Widening (I-12 - US 190) Juban Rd Widening (I-12 - US 190) Proj Description Phase New Bridges New Bridges New Bridges Roundabout Roundabout Roundabout Construct 4-Legged Single Lane Roundabout Construct 4-Legged Single Lane Roundabout Construct 4-Legged Single Lane Roundabout Construct 4-Legged Single Lane Roundabout Bridge Rehab, Deck, Appr Slab, Abut Bridge Rehab, Deck, Appr Slab, Abut Bridge Rehab, Deck, Appr Slab, Abut Bridge Rehabilitation Bridge Rehabilitation Bridge Rehabilitation Intersection Improvement Intersection Improvement Intersection Improvement Center Turn Lane Center Turn Lane Center Turn Lane Widen to 5 Lanes Widen to 5 Lanes Widen to 5 Lanes Widen to 4 Lanes Widen to 4 Lanes Widen to 4 Lanes New Bridge New Bridge New Bridge Increase Capacity (Stage 0 Study) Widening Widening Widening Widening Widening and Improvements Widening and Improvements Widening and Improvements Widening and Improvements Widening and Improvements Widening and Improvements Widening and Improvements Install Roundabout Install Roundabout Install Roundabout Install Roundabout New Bridge New Bridge New Bridge New Bridge Bridge Replacement Bridge Replacement Bridge Replacement Bridge Replacement Intersection Improvement Intersection Improvement Intersection Improvement New Interchange New Interchange New Interchange New Interchange Widen LA 930 & Add Open Ditches Widen LA 930 & Add Open Ditches Widen LA 930 & Add Open Ditches Widen LA 930 & Add Open Ditches Widening Widening Widening Widening PE UTIL C ROW UTIL C STUDY ROW UTIL C PE UTIL C PE UTIL C ROW UTIL C ROW UTIL C ROW UTIL C C C C ROW UTIL C STUDY PE PE ENIV ENIV ROW ROW ROW UTIL C C C PE ROW UTIL C PE ROW UTIL C PE ROW UTIL C ROW UTIL C ROW UTIL C C PE ROW UTIL C ROW ROW UTIL UTIL 1 Proj Cost (000) 25 15 12,000 100 150 1,200 6 350 150 1,000 200 10 3,186 330 78 24,255 184 5 1,040 5,400 876 3,600 3,080 350 14,710 19,000 3,000 3,000 60 200 1,666 100 800 20 445 130 8,250 3,500 6,000 3,500 22,000 2,000 1,300 50 600 741 1,800 125 280 5 23,124 126 500 500 1,541 2,100 1,200 6,580 0 0 0 0 530 3,400 1,300 5,300 100 6,900 150 2,500 Total Cost (000) (W/Contingency) 25 15 13,200 100 150 1,320 6 350 150 1,100 200 10 3,505 330 78 26,681 184 5 1,144 5,400 876 3,960 3,080 350 16,181 20,900 3,300 3,300 60 200 1,833 100 800 20 445 130 8,250 3,500 6,000 3,500 24,200 2,200 1,430 50 600 741 1,980 125 280 5 25,436 126 500 500 1,695 2,100 1,200 7,238 0 0 0 0 530 3,400 1,300 5,830 100 6,900 150 2,500 Federal Share (000) 20 12 10,560 80 120 1,056 5 315 135 990 160 8 2,804 264 62 21,344 0 0 0 4,320 701 3,564 2,464 280 12,945 0 2,640 0 48 160 1,466 0 640 0 356 0 6,600 2,800 4,800 2,800 0 1,980 1,359 40 480 593 1,980 100 224 4 20,349 101 400 400 1,356 1,680 960 5,790 0 0 0 0 0 0 0 0 90 0 135 0 Fund Auth Year STPFLEX STPFLEX STPFLEX HSIP HSIP HSIP SATRANS HSIP HSIP HSIP FBR-ON/OFF FBR-ON/OFF FBR-ON/OFF FBR-ON/OFF FBR-ON/OFF FBR-ON/OFF LOCAL LOCAL LOCAL STP>200K STP>200K HSIP STP>200K STP>200K STP>200K LOCAL STPFLEX STBONDS FBRON FBRON FBRON STCASH NHPP STGEN NHPP STGEN DEMO STPENH STP>200K HSIP STBONDS HSIP TAPFLEX HSIP HSIP HSIP HSIP STPFLEX STPFLEX STPFLEX STPFLEX FBR-ON/OFF FBR-ON/OFF FBR-ON/OFF FBR-ON/OFF CMAQ CMAQ CMAQ NFI NFI DEMO STGEN STBONDS STBONDS STBONDS STBONDS HSIP STBONDS HSIP STBONDS FY 16 FY 17 FY 18 FY 13 FY 13 FY 13 FY 13 FY 13 FY 13 FY 13 FY 12 FY 13 FY 14 FY 14 FY 14 FY 15 FY 13 FY 13 FY 14 FY 11 FY 11 FY 14 FY 15 FY 15 FY 16 FY 15 FY 15 FY 15 FY 16 FY 16 FY 16 FY 09 FY 15 FY 15 FY 15 FY 15 FY 11 FY 11 FY 12 FY 11 FY 15 FY 15 FY 15 FY 13 FY 13 FY 13 FY 14 FY 20 FY 20 FY 20 FY 20 FY 13 FY 14 FY 14 FY 15 FY 12 FY 12 FY 15 FY 13 FY 13 FY XX FY XX FY 13 FY 13 FY 13 FY 14 FY 15 FY 15 FY 15 FY 15 Comments 100% Local Funds 100% Local Funds 100% Local Funds Local Match Provided by DOTD 95/5 Cost Share 100% Federal Funds No Funds. Project in Green Light Plan No Funds. Project in Green Light Plan No Funds. Project in Green Light Plan No Funds. Project in Green Light Plan STIP Project Status Y Y Y Y Y Y Y-LINE Y-LINE Y-LINE Y-LINE Y-LINE Y-LINE Y-LINE Y-LINE Y-LINE Y-LINE Y Y Y Y Y Y Y Y Y Y Y Y Y-LINE Y-LINE Y-LINE Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y-LINE Y-LINE Y-LINE Y-LINE Y Y Y N-STATE N-STATE N-STATE N-STATE N-STATE N-STATE N-STATE N-STATE Y Y Y Y NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH AUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH AUTH AUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH AUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH AUTH AUTH AUTH AUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH AUTH AUTH NOTAUTH NOFUNDS NOFUNDS NOFUNDS NOFUNDS NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH 12/17/14 BATON ROUGE METROPOLITAN AREA TRANSPORTATION IMPROVEMENT PROGRAM (2015-2018) (Financially Constrained) Highway Element State Proj No. H.005693 H.006831 H.006831 H.006831 H.007137 H.007137 H.007157 H.007160 H.007160 H.007855 H.007855 H.007855 H.007855 H.007961 H.007961 H.007961 H.007961 H.008173 H.008173 H.008173 H.008190 H.008190 H.008190 H.008193 H.008193 H.008195 H.008732 H.009033 H.009033 H.009033 H.009139 H.009140 H.009140 H.009140 H.009141 H.009144 H.009179 H.009179 H.009180 H.009180 H.009250 H.009263 H.009266 H.009276 H.009288 H.009288 H.009288 H.009290 H.009290 H.009327 H.009327 H.009328 H.009328 H.009429 H.009437 H.009489 H.009548 H.009549 H.009552 H.009595 H.009634 H.009636 H.009637 H.009638 H.009638 H.009647 H.009649 H.009651 MTP No. 111 111 111 105 105 105 105 142 142 142 104 104 104 145 145 145 112 143 102 102 148 148 148 121 Parish LIV EBR EBR EBR EBR EBR EBR EBR EBR ASC ASC ASC ASC EBR EBR EBR EBR LIV LIV LIV LIV LIV LIV LIV LIV LIV Regional ASC ASC ASC ASC LIV LIV LIV EBR EBR LIV LIV LIV LIV EBR LIV ASC ASC WBR WBR WBR EBR EBR EBR EBR EBR EBR ASC LIV EBR LIV LIV LIV LIV ASC WBR ASC EBR EBR EBR EBR EBR Route LA 447 Jones Creek Rd Jones Creek Rd Jones Creek Rd LA 431 LA 431 LA 431 LA 431 LA 410 LA 410 LA 410 LA 410 LA 1032 LA 1032 LA 1032 LA 1025 LA 1025 LA 1025 LA 3002 LA 3002 LA 3003 LA 44 LA 44 LA 44 US 61 LA 1026 LA 1026 LA 1026 LA 3246 LA 42 Wax Rd Wax Rd Plantation Ave / Enterprise Dr Plantation Ave / Enterprise Dr I-10 US 190 I-10 I-10 LA 1 LA 1 LA 1 I-10, I-110 I-10, I-110 I-10 I-10 Various Roads US 190 US 61 US 190 US 190 LA 16 I-12 LA 73 I-10 I-10 I-10 I-10 LA 408, LA 73 LA 67 US 61, US 190 Proj Limits Proj Description Phase Proj Cost (000) Total Cost (000) (W/Contingency) Federal Share (000) Fund Auth Year Comments STIP Project Status 100% Federal Funds Y Y Y Y Y Y Y Y Y Y Y Y Y Y-LINE Y-LINE Y-LINE Y-LINE Y Y Y Y-LINE Y-LINE Y-LINE Y-LINE Y-LINE Y-LINE Y Y-LINE Y-LINE Y-LINE Y-LINE Y-LINE Y-LINE Y-LINE Y-LINE Y-LINE Y NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH AUTH NOTAUTH NOTAUTH AUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH AUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH Y Y Y Y-LINE Y-LINE Y-LINE Y-LINE Y Y Y Y-LINE Y-LINE Y-LINE Y-LINE Y-LINE Y-LINE Y-LINE Y-LINE Y-LINE Y-LINE Y-LINE Y-LINE Y-LINE Y-LINE Y-LINE Y-LINE Y-LINE Y-LINE Y-LINE Y-LINE Y-LINE NOTAUTH AUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH LA 447/I-12 Interchange Baton Rouge ITS Deployment (Phase 3) Baton Rouge ITS Deployment (Phase 3) Baton Rouge ITS Deployment (Phase 3) Tigerbend Rd - Coursey Blvd Tigerbend Rd - Coursey Blvd Tigerbend Rd - Coursey Blvd EBR Computerized Traffic Signal 5B EBR Computerized Traffic Signal 5B LA 431 @ LA 934 (Goldplace Rd) LA 431 @ LA 934 (Goldplace Rd) LA 431 @ LA 934 (Goldplace Rd) LA 431 @ LA 934 (Goldplace Rd) Blackwater Bayou Bridge Blackwater Bayou Bridge Blackwater Bayou Bridge Blackwater Bayou Bridge US 190 @ LA 1032 US 190 @ LA 1032 US 190 @ LA 1032 LA 1025: Creek Br. Near Friendship LA 1025: Creek Br. Near Friendship LA 1025: Creek Br. Near Friendship LA 1034 - US 190 LA 1034 - US 190 LA 16 - LA 1032 Baton Rouge Loop LA 44 @ LA 934 (Black Bayou Rd) LA 44 @ LA 934 (Black Bayou Rd) LA 44 @ LA 934 (Black Bayou Rd) US 61: Access Mgt @ Swamp Rd (Phase 2) LA 1026: Access Mgt. & Roundabouts LA 1026: Access Mgt. & Roundabouts LA 1026: Access Mgt. & Roundabouts LA 3246: Access Mgt. Improvements LA 42: Corridor Improvements LA 16 - LA 1026 Intersection Improvements/Install Roundabouts Baton Rouge ITS Baton Rouge ITS Baton Rouge ITS Widen to 5 Lanes Widen to 5 Lanes Widen to 5 Lanes (Clearing & Grubbing) Signal Synchronization Signal Synchronization Intersection Improvement Intersection Improvement Intersection Improvement Intersection Improvement Bridge Replacement Bridge Replacement Bridge Replacement Bridge Replacement Intersection Improvements Intersection Improvements Intersection Improvements New Bridge New Bridge New Bridge Cold Plane, Patch, & Overlay Cold Plane, Patch, & Overlay Cold Plane, Patch, & Overlay Study of Baton Rouge Loop Turn Lanes & Sginal Upgrades Turn Lanes & Sginal Upgrades Turn Lanes & Sginal Upgrades Median & Signal Improvements Roundabout Roundabout Roundabout Median & Signal Improvements Signal Relocations, Turn Lanes and Adding N New Base and Overlay C STUDY PE C C C C ROW C PE ROW UTIL C PE ROW UTIL C ROW UTIL C PE UTIL C PE C C ENIV PE ROW C C STUDY ROW C C C UTIL 5,000 33 325 4,000 12,758 703 298 60 6,200 346 300 140 750 134 500 200 2,379 350 45 903 30 40 571 75 889 588 629 75 400 800 240 16 300 4,125 426 860 75 5,500 33 325 4,400 14,034 773 328 60 6,820 346 300 140 825 134 500 200 2,617 350 45 993 40 40 628 75 978 647 629 75 400 880 264 16 300 4,538 469 946 75 5,500 26 260 3,520 11,227 0 262 48 5,456 277 240 112 660 107 400 160 2,094 315 41 894 32 32 502 60 782 517 503 60 320 704 211 13 240 3,630 375 757 60 STPFLEX STPFLEX CMAQ CMAQ STP>200K LOCAL STP>200K STP>200K CMAQ CMAQ CMAQ CMAQ CMAQ FBRON FBRON FBRON FBRON HSIP HSIP HSIP FBR-ON/OFF FBR-ON/OFF FBR-ON/OFF NHS NHS STPFLEX DEMO HSIP HSIP HSIP STPFLEX SATRANS STPFLEX STPFLEX NHS STPFLEX STP>200K FY 15 FY 13 FY 13 FY 14 FY 13 FY 13 FY 12 FY 14 FY 16 FY 14 FY 15 FY 15 FY 16 FY 13 FY 14 FY 14 FY 14 FY 14 FY 14 FY 15 FY 12 FY 13 FY 13 FY 13 FY 13 FY 13 FY 13 FY 13 FY 13 FY 13 FY 13 FY 13 FY 14 FY 15 FY 14 FY 14 FY 15 LA 16 - LA 1026 LA 1034 - LA 1032 LA 1034 - LA 1032 Highland Rd - LA 73 US 190: Left Turn Ln @ LA 449 LA 73 - LA 30 LA 30 - LA 22 New RR Bridge @ DOW Spur Xing New RR Bridge @ DOW Spur Xing New RR Bridge @ DOW Spur Xing LSU Laboratory School SRTS Project LSU Laboratory School SRTS Project I-10/I-110 Epoxy Br Deck Overlay - BTN ROUGE I-10/I-110 Epoxy Br Deck Overlay - BTN ROUGE I-10: Miss. R Br Clean & Spot Paint - BTN RUGE I-10: Miss. R Br Clean & Spot Paint - BTN RUGE Various Roads: Signing US 190: Box Culvert Extensions Jefferson Highway Overpass EBR ph. Line - W. Jct LA 16 E. JCT LA 16 - JCT LA 447 JCT LA 1034 - JCT US 190 I-12: LIV Parish Approach Slab Rep P2 LA 30 - LA 429 Interchange Repair @ LA 1 & LA 415 I-10: LA 22 - EBR Parish Line Washington St - KCS RR Opass Washington St - KCS RR Opass LA 408 & LA 73: Improvements LA 67: US 61/190 - LA 3006 US 61/US 190: US 61/US 190 BUS - Miss. River BR New Base and Overlay New Base and Overlay New Base and Overlay Capacity Improvements Left Turn Ln Capacity Improvements Capacity Improvements Grade Separate Existing At-Grade Crossing Grade Separate Existing At-Grade Crossing Grade Separate Existing At-Grade Crossing Bicycle Lanes and Education and Encourage Bicycle Lanes and Education and Encourage Epoxy Bridge Deck Overlay Epoxy Bridge Deck Overlay Cleaning & Spot Painting Cleaning & Spot Painting Signage Box Culvert Extensions Bridge Replacement Maintenance, Restoration & Rehabilitation Maintenance, Restoration & Rehabilitation Maintenance, Restoration & Rehabilitation Roadway Maintenance, Restoration & Rehab Thin Asphalt Concrete PCCP Patching & Slope Repairs PCCP Patching & Slope Repairs Cold Plane & Overlay Cold Plane & Overlay Turn Lanes PCCP Patching Cold Plane & Overlay C UTIL C PE C PE PE STUDY PE C PE C PE C PE C C C C C C C C C C C PE C C C C 1,150 30 555 1,809 350 1,500 1,600 100 2,100 20,000 42 210 410 9,000 276 3,000 21 500 6,854 1,211 2,322 1,405 7,200 881 1,000 4,000 50 3,500 450 4,500 8,438 1,265 30 611 1,809 385 1,500 1,600 100 2,100 22,000 42 231 410 9,900 276 3,300 23 550 7,539 1,332 2,554 1,546 7,920 969 1,100 4,400 50 3,850 495 4,950 9,282 1,012 24 488 1,447 308 1,200 1,280 80 1,680 17,600 38 231 328 7,920 221 2,640 18 495 6,032 1,066 2,043 1,236 7,128 775 990 3,960 45 3,465 396 3,960 7,425 STP>200K STP>200K STP>200K LHIP STPFLEX LHIP LHIP NHPP NHPP NHPP SATRANS SR2S FBR-ON/OFF FBR-ON/OFF FBR-ON/OFF FBR-ON/OFF SATRANS HSIP FBR-ON/OFF NHS STPFLEX STPFLEX IM STPFLEX IM IM IM IM STPFLEX STPFLEX NHS To be LET after the Off System Bridge Project is FY 15 LET and constructed. FY 14 FY 15 FY 12 Earmark FY 13 FY 12 Earmark FY 12 Earmark FY 14 FY 15 FY 18 FY 14 FY 14 FY 13 FY 14 FY 13 FY 14 FY 13 FY 13 FY 16 FY 14 FY 14 FY 14 FY 13 FY 14 FY 14 FY 13 FY 15 FY 16 FY 13 FY 14 FY 14 2 90/10 Cost Share 12/17/14 BATON ROUGE METROPOLITAN AREA TRANSPORTATION IMPROVEMENT PROGRAM (2015-2018) (Financially Constrained) Highway Element State Proj No. H.009667 H.009667 H.009836 H.009836 H.009887 H.009910 H.009943 H.009943 H.009947 H.009950 H.009950 H.009950 H.009956 H.009956 H.009956 H.009956 H.010019 H.010020 H.010020 H.010026 H.010026 H.010026 H.010026 H.010057 H.010065 H.010069 H.010075 H.010094 H.010118 H.010124 H.010124 H.010182 H.010182 H.010232 H.010251 H.010253 H.010254 H.010319 H.010319 H.010320 H.010439 H.010532 H.010534 H.010554 H.010554 H.010560 H.010560 H.010560 H.010560 H.010560 H.010560 H.010565 MTP No. 147 147 106 106 106 106 144 144 131 131 123 123 123 123 123 123 Parish EBR EBR LIV LIV LIV WBR EBR EBR ASC EBR EBR EBR ASC ASC ASC ASC ASC EBR EBR ASC ASC ASC ASC ASC LIV WBR WBR EBR WBR LIV LIV ASC ASC EBR EBR EBR EBR EBR EBR EBR EBR ASC EBR EBR EBR EBR EBR EBR EBR EBR EBR EBR Route LA 67, LA 412 LA 67, LA 412 I-12 I-12 LA 1022 LA 987-4, LA 989-2 US 190 US 190 US 61 I-10 I-10 I-10 LA 44 LA 44 LA 44 LA 44 I-10 I-110 I-110 LA 431 LA 431 LA 431 LA 431 I-10 LA 449 Proj Limits LA 3064 LA 3064 LA 3064 LA 3064 LA 3064 LA 3064 LA 427 LA 67 & LA 412: Intersection Improvements LA 67 & LA 412: Intersection Improvements Walker - 0.5 Mi West of Satsuma Walker - 0.5 Mi West of Satsuma LA 1019 - LA 16 LA 987-4 & LA 989-2 Thin Asphalt Concrete Overlay MISS R BR Clean, Paint, Rep-Ph II MISS R BR Clean, Paint, Rep-Ph II US 61: Access Mgt @ LA 44 I-10 Miss R Br Baton Rouge (Pier 5 Rep.) I-10 Miss R Br Baton Rouge (Pier 5 Rep.) I-10 Miss R Br Baton Rouge (Pier 5 Rep.) LA 44: Turn Lanes and Medians LA 44: Turn Lanes and Medians LA 44: Turn Lanes and Medians LA 44: Turn Lanes and Medians LA 73 Interchange Lighting - Prairieville I-110 Bridge Over LA 67 Clean & Paint I-110 Bridge Over LA 67 Clean & Paint LA 431: Realign Curve, C/L Rumble Strips LA 431: Realign Curve, C/L Rumble Strips LA 431: Realign Curve, C/L Rumble Strips LA 431: Realign Curve, C/L Rumble Strips LA 22 Interchange Lighting (Sorrento) Improve Cross Slope UP (W. Baton Rouge) Winterville Rd UP (Addis) Several RR-X-Ings SRTS Lexlee's Kids - Stroll Into Safety EMER BR Deck Repair on I-10 Over LA 415 LA 16: Roundabout @ LA 447 LA 16: Roundabout @ LA 447 US 61 - LA 44 US 61 - LA 44 I-10/I-110 BR Repairs Ramps II-2 & II-3 Chippewa St Pump Station Imp US 61/US 190-X Bluebonnet Blvd. Pump Station Imp. LA 1248 15th St Pump Station Improvements I-110 I-110: North St - US 61/190 I-110: North St - US 61/190 LA 42: Jct. Highland Rd - LA 30 Boyd St & 21st St Pumping Station Imp I-110 LA 44 - LA 70 LA 427: LA 42 - Ascension P/L St. Gabriel Trail at the Leveel Ph 2 St. Gabriel Trail at the Leveel Ph 2 Essen Ln Widen: I-10 to Perkins Rd Essen Ln Widen: I-10 to Perkins Rd Essen Ln Widen: I-10 to Perkins Rd Essen Ln Widen: I-10 to Perkins Rd Essen Ln Widen: I-10 to Perkins Rd Essen Ln Widen: I-10 to Perkins Rd Acadian Street Pumping Station LA 16 LA 16 LA 42 LA 42 I-10/I-110 US 61-X LA 1248 I-110 I-110 I-110 LA 42 I-110 LA 22 LA 427 H.010638 LIV River Rd GOVERNMENT ST - CENTERVILLE ST H.010638 LIV River Rd GOVERNMENT ST - CENTERVILLE ST H.010638 LIV River Rd GOVERNMENT ST - CENTERVILLE ST H.010638 H.010639 H.010639 H.010639 H.010639 H.010640 H.010640 H.010640 LIV ASC ASC ASC ASC ASC ASC ASC River Rd LA 939, LA 940 LA 939, LA 940 LA 939, LA 940 LA 939, LA 940 LA 3038 (Cornerview) LA 3038 (Cornerview) LA 3038 (Cornerview) GOVERNMENT ST - CENTERVILLE ST LA 939 and LA 940 Rehab LA 939 and LA 940 Rehab LA 939 and LA 940 Rehab LA 939 and LA 940 Rehab LA 3038 (Cornerview): Rehab & Turn Lane LA 3038 (Cornerview): Rehab & Turn Lane LA 3038 (Cornerview): Rehab & Turn Lane Proj Description Phase Widen Intersections Widen Intersections Widening Widening 1.5'' Overlay Thin Asphalt Concrete Overlay Repair and Painting of Railroad Approaches Repair and Painting of Railroad Approaches Modify Existing Intersection, Create Small Median Rep ro Pier 5 Pier Protection System Rep ro Pier 5 Pier Protection System Rep ro Pier 5 Pier Protection System Intersection Improvements Intersection Improvements Intersection Improvements Intersection Improvements Interstate Lighting Cleaning & Painting Cleaning & Painting Realign Curve, Center Line Rumble Strips Realign Curve, Center Line Rumble Strips Realign Curve, Center Line Rumble Strips Realign Curve, Center Line Rumble Strips Interstate Lighting Improve Cross Slope and Add Raised Pavement Railroad Signalization Railroad Signalization Enforcement, Purchases, Operating Service Emergency Bridge Deck Repair on I-10 Over LA 415 Roundabout Roundabout Clearing and Grubbing with Utility Work Clearing and Grubbing with Utility Work Repair Columns on I-10 EB Ramp and Bridge Ramps Replace/Upgrade Pumphouse Components Replace Pump Station Float System Replace/Upgrade Pumphouse Components Reconstruct JCP @ Grade Reconstruct JCP @ Grade PCC Patch Replace Pump Station Float System Cold Plane & Overlay Cold Plane & Overlay Construction of a Ped-Bike Trail on the Miss. R Construction of a Ped-Bike Trail on the Miss. R Widen to 6 Lanes Section W/16' Curb & Gutter Widen to 6 Lanes Section W/16' Curb & Gutter Widen to 6 Lanes Section W/16' Curb & Gutter Widen to 6 Lanes Section W/16' Curb & Gutter Widen to 6 Lanes Section W/16' Curb & Gutter Widen to 6 Lanes Section W/16' Curb & Gutter Replace/Upgrade Pumphouse Components Minor Widening and Overlay, Some Pavement Patching Required Minor Widening and Overlay, Some Pavement Patching Required Minor Widening and Overlay, Some Pavement Patching Required Minor Widening and Overlay, Some Pavement Patching Required Rehabilitate Existing Roadway Rehabilitate Existing Roadway Rehabilitate Existing Roadway Rehabilitate Existing Roadway Rehab & Turn Lane Rehab & Turn Lane Rehab & Turn Lane 3 C C C C C C PE C C PE C C ENIV ROW UTIL C C PE C PE ROW UTIL C C C C C C C ROW C C C C C C C PE C C C C C C C PE ENIV ROW UTIL C C C Proj Cost (000) Total Cost (000) (W/Contingency) Federal Share (000) Fund Auth Year STPFLEX NFA STBONDS NHPP NFA NFA NFI NFI SATRANS STPFLEX STPFLEX REIMB HSIP HSIP HSIP HSIP IM FBR-ON/OFF FBR-ON/OFF HSIP HSIP HSIP HSIP IM SATRANS RR RR SR2S REIMB HSIP HSIP HSIPPEN LOCAL REIMB STPFLEX STPFLEX NHPP NHPP NHPP STPFLEX NHPP NFA NFA RTP LOCAL STPFLEX STPFLEX STBONDS STBONDS STBONDS STPFLEX STPFLEX FY 13 FY 13 FY 13 FY 13 FY 13 FY 13 FY 13 FY 13 FY 13 FY 13 FY 13 FY 13 FY 15 FY 15 FY 15 FY 16 FY 14 FY 15 FY 16 FY 14 FY 15 FY 15 FY 15 FY 13 FY 13 FY 13 FY 13 FY 13 FY 13 FY 13 FY 14 FY 13 FY 13 FY 13 FY 15 FY 15 FY 14 FY 14 FY 17 FY 14 FY 15 FY 14 FY 14 FY 14 FY 14 FY 13 FY 13 FY 14 FY 14 FY 16 FY 16 FY 15 Comments STIP Project Status Y-LINE Y-LINE Y Y N-STATE N-STATE Y-LINE Y-LINE Y-LINE Y-LINE Y-LINE Y-LINE Y Y Y Y Y-LINE Y-LINE Y-LINE Y Y Y Y Y-LINE Y-LINE Y-LINE Y-LINE Y-LINE Y-LINE Y-LINE Y-LINE Y Y Y-LINE Y Y Y-LINE Y Y Y-LINE Y-LINE N-STATE N-STATE Y-LINE Y-LINE Y Y Y Y Y Y Y NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOFUNDS NOFUNDS NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH AUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH 108 108 15,950 12,600 278 273 400 18,000 85 67 500 100 882 3,376 1,139 5,429 563 180 650 30 625 50 3,900 830 200 250 900 36 43 250 1,000 885 4,500 500 450 50 690 307 21,000 6,500 1,500 1,528 1,288 183 5 800 450 2,250 2,500 6,000 500 450 119 119 17,545 13,860 306 300 400 19,800 94 67 550 110 882 3,376 1,139 5,972 619 180 715 30 625 50 4,290 913 220 275 990 40 47 250 1,100 974 4,950 550 495 55 759 307 23,100 7,150 1,650 1,681 1,417 201 6 800 450 2,250 2,500 6,600 550 495 95 0 0 11,088 0 0 320 15,840 75 54 440 88 794 3,038 1,025 5,375 557 144 572 27 563 45 3,861 822 176 220 792 40 38 225 990 974 0 440 396 44 607 276 20,790 5,720 1,320 0 0 161 0 640 360 0 0 0 440 396 PE 40 40 40 LOCAL FY 13 Y AUTH ENIV 3 3 3 LOCAL FY 13 Y AUTH UTIL 5 5 4 STP>200K FY 14 Y AUTH C PE ENIV C C UTIL UTIL C 395 260 42 178 1,430 56 56 660 435 260 42 196 1,573 56 56 726 348 0 0 0 1,258 45 0 581 STP>200K LOCAL LOCAL LOCAL STP>200K STP>200K LOCAL STP>200K FY 14 FY 13 FY 13 FY 15 FY 15 FY 14 FY 14 FY 15 Y Y Y Y Y Y Y Y AUTH AUTH AUTH NOTAUTH NOTAUTH AUTH AUTH NOTAUTH 100% Federal DOTD will equally split the local match KCS agreed to pay $56K DOTD will equally split the local match 12/17/14 BATON ROUGE METROPOLITAN AREA TRANSPORTATION IMPROVEMENT PROGRAM (2015-2018) (Financially Constrained) Highway Element State Proj No. MTP No. Parish 113 135 114 115 ASC ASC ASC EBR EBR EBR EBR EBR EBR WBR WBR WBR WBR WBR WBR WBR WBR WBR WBR WBR WBR WBR ASC ASC ASC Regional Regional EBR EBR WBR Regional EBR EBR LIV LIV LIV LIV EBR EBR EBR ASC ASC ASC ASC ASC ASC ASC ASC ASC EBR WBR WBR WBR EBR EBR EBR Regional Regional Regional Regional Regional Regional Regional Regional Regional Regional Regional EBR EBR EBR EBR H.010642 H.010642 H.010642 H.010648 H.010648 H.010649 H.010649 H.010650 H.010650 H.010653 H.010653 H.010653 H.010653 H.010654 H.010654 H.010654 H.010655 H.010655 H.010656 H.010656 H.010656 H.010656 H.010657 H.010657 H.010657 H.010674 H.010674 H.010729 H.010729 H.010768 H.011003 H.011213 H.011213 H.011248 H.011248 H.011249 H.011249 H.011310 H.011363 H.011364 H.011450 H.011450 H.011450 H.011451 H.011451 H.011451 H.011452 H.011452 H.011452 H.011483 H.011551 H.011619 H.011619 H.011668 L.000045 L.000058 L.000058 L.000085 L.000085 02-CS-HC-0004 02-PR-CI-0034 03-CS-CI-0020 06-CS-HC-0018 Route LA 30 LA 30 LA 30 Parishwide Parishwide LA 986 LA 986 LA 986 LA 986 LA 415 LA 415 LA 415 LA 1 LA 1 LA 1, LA 76 LA 1, LA 76 LA 1, LA 76 LA 1, LA 76 Parishwide Parishwide Parishwide Regional Regional Regional I-12 I-12 Julia Street Julia Street Maple Street Maple Street Ford St. Sherwood Forest Blvd Goodwood Blvd LA 70 LA 70 LA 70 LA 22 LA 22 LA 22 LA 942 LA 942 LA 942 Downtown Br & Southern Univ Essen Lane Bridge Widen Picardy Perkins Connector LA 327 Spur Regional Regional Regional Regional Regional Regional Regional Regional Regional Regional Regional O'Neal Ln McHugh Rd Sullivan Rd Fairchild - Badley Road Proj Limits IBERVILLE PL TO 0.3M WEST OF I-10 IBERVILLE PL TO 0.3M WEST OF I-10 IBERVILLE PL TO 0.3M WEST OF I-10 ACADIAN THRUWAY/N. ACADIAN THRUWAY OVLY ACADIAN THRUWAY/N. ACADIAN THRUWAY OVLY EBR PARISHWIDE SIGNAL MODIFICATIONS EBR PARISHWIDE SIGNAL MODIFICATIONS OLOL MEDICAL COMPLEX AREA STREETS OLOL MEDICAL COMPLEX AREA STREETS LA 986 Sidewalks LA 986 Sidewalks LA 986 Sidewalks LA 986 Sidewalks I-10 TO APPROXIMATELY 0.41M NORTH I-10 TO APPROXIMATELY 0.41M NORTH I-10 TO APPROXIMATELY 0.41M NORTH LA 1 Lighting Renovations LA 1 Lighting Renovations LA 1 @ LA 76 Intersection Improvements LA 1 @ LA 76 Intersection Improvements LA 1 @ LA 76 Intersection Improvements LA 1 @ LA 76 Intersection Improvements Ascension Parish Pavement management Ascension Parish Pavement management Ascension Parish Pavement management DMS Ladder System - Phase 2 DMS Ladder System - Phase 2 Traffic Signal Coord & Synch Ph VI Traffic Signal Coord & Synch Ph VI Multi-Use Trails, Phase I-B BRMPO Travel Demand Management 2013 Sound Barrier Wall @ Essen Lane Sound Barrier Wall @ Essen Lane Julia Street Overlay and Widening Julia Street Overlay and Widening Maple Street Overlay and Widening Maple Street Overlay and Widening Ford St. Ext. & New Connection to LA 408 Sherwood (Airline Hwy to Old Hammond) Goodwood Blvd Rehab (Lobdell to Airline) LA 70 Rehabilitation (LA 22 - St. James Parish Line) LA 70 Rehabilitation (LA 22 - St. James Parish Line) LA 70 Rehabilitation (LA 22 - St. James Parish Line) LA 22 Rehabilitation (I 10 - LA 429) LA 22 Rehabilitation (I 10 - LA 429) LA 22 Rehabilitation (I 10 - LA 429) LA 942 Rehabilitation (LA 22 - 0.5mi W of St. Elmo St) LA 942 Rehabilitation (LA 22 - 0.5mi W of St. Elmo St) LA 942 Rehabilitation (LA 22 - 0.5mi W of St. Elmo St) Bike Racks - Downtown Br & Southern Univ CNG Vehicles - Convert & Purchase CNG Fueling Station CNG Fueling Station Perkins to I-10 Picardy Perkins Connector LA 327 Spur: Staring Lane Extension Flex to Transit Flex to Transit Flex to Transit Flex to Transit Flex to Transit Flex to Transit Flex to Transit Flex to Safety Flex to Safety Advanced Traffic Management Center Advanced Traffic Management Center S. Harrell's Ferry Rd - George O'Neal Wimbush Dr to Lower Zachary Rd Central Thruway - Wax Rd Scenic Hwy to Veterans Blvd Proj Description Phase Cold Plane & Overlay Cold Plane & Overlay Cold Plane & Overlay Pavement Rehabilitation Pavement Rehabilitation Signal Modifications Signal Modifications Rehabilitate Existing Roadway Rehabilitate Existing Roadway Installation of Sidewalks Installation of Sidewalks Installation of Sidewalks Installation of Sidewalks Pavement Rehabilitation Pavement Rehabilitation Pavement Rehabilitation Lighting Improvements Lighting Improvements Turn Lanes Turn Lanes Turn Lanes Turn Lanes Parishwide Pavement Management Software Parishwide Pavement Management Software Parishwide Pavement Management Software Install Access Ladders Install Access Ladders Signal Synchronization Signal Synchronization Multi-Use Trails, Phase I-B Establish and implement TDM strategies Sound Barrier Wall Sound Barrier Wall Overlay and Widening Overlay and Widening Overlay and Widening Overlay and Widening New Road (Feasibility Study) Rehabilitation Rehabilitation Rehabilitation Rehabilitation Rehabilitation Rehabilitation Rehabilitation Rehabilitation Rehabilitation Rehabilitation Rehabilitation Install New Bike Racks Convert & Purchase CNG Vehicles Construct new CNG Fueling Station Construct new CNG Fueling Station Widen to 6 lanes New Road (Feasibility Study) New Road (Environmental) 10 New CNG Vans Maintenance Facility Upgrade Improved Transit Information Service Expansion Service Expansion Service Expansion Operations City's Share of MAP FY 2013 City's Share of MAP FY 2014 Operations Operations Widen to 4 Lanes Base Widening W/Shoulders Widen to 4 lanes Base Wideninig, Curb & Gutter W/Sidewalks PE ENIV C PE C PE C PE C PE ENIV UTIL C PE ENIV C PE C PE ENIV UTIL C PE PE PE PE C PE C C PE PE C UTIL C UTIL C STUDY C C ENIV PE C ENIV PE C ENIV PE C C C C C C STUDY ENIV C C C C C C C C C C C C C C C 4 Proj Cost (000) 115 2 2,700 174 2,900 22 1,500 60 1,000 55 40 60 658 45 30 530 15 485 35 40 50 427 50 50 50 240 1,100 600 8,200 700 100 50 1,300 5 390 20 576 15 3,864 1,527 1 62 1,282 2 74 2,134 1 40 721 54 335 910 625 950 15 500 1,500 500 700 3,600 3,600 3,600 800 350 350 300 300 17,911 6,379 25,776 5,707 Total Cost (000) (W/Contingency) 115 2 2,970 174 3,190 22 1,650 60 1,100 55 40 60 724 45 30 583 15 534 35 40 50 470 50 50 50 240 1,210 600 9,020 770 100 50 1,430 5 429 20 634 15 4,250 1,680 1 62 1,410 2 74 2,347 1 40 793 59 369 1,001 688 1,045 15 500 1,500 500 700 3,600 3,600 3,600 800 385 385 330 330 17,911 6,379 25,776 5,707 Federal Share (000) 115 2 2,376 174 2,552 22 1,650 60 880 55 40 48 579 45 30 466 15 427 35 40 40 376 40 40 40 192 968 480 7,216 616 100 45 1,287 4 343 16 507 0 3,188 1,260 0 0 1,128 0 0 1,878 0 0 634 48 295 0 550 0 12 400 1,125 375 525 900 900 900 800 308 308 264 264 0 0 0 0 Fund Auth Year LOCAL LOCAL STP>200K LOCAL STP>200K LOCAL STP>200K LOCAL STP>200K LOCAL LOCAL STP>200K STP>200K LOCAL LOCAL STP>200K LOCAL STP>200K LOCAL LOCAL STP>200K STP>200K STP>200K STP>200K STP>200K DEMO DEMO CMAQ CMAQ CMAQ CMAQ NHPP NHPP STP>200K STP>200K STP>200K STP>200K NFA STP>200K STP>200K LOCAL LOCAL STP>200K LOCAL LOCAL STP>200K LOCAL LOCAL STP>200K CMAQ CMAQ LOCAL CMAQ STBONDS STPFLEX STPFLEX CMAQ CMAQ CMAQ CMAQ CMAQ CMAQ CMAQ CMAQ CMAQ CMAQ CMAQ LOCAL LOCAL LOCAL LOCAL FY 13 FY 13 FY 14 FY 13 FY 15 FY 13 FY 15 FY 13 FY 15 FY 13 FY 13 FY 14 FY 15 FY 13 FY 13 FY 16 FY 16 FY 17 FY 15 FY 15 FY 16 FY 16 FY 14 FY 15 FY 16 FY 14 FY 14 FY 16 FY 18 FY 16 FY 14 FY 15 FY 15 FY 17 FY 17 FY 17 FY 17 FY 15 FY 17 FY 17 FY 14 FY 14 FY 16 FY 14 FY 14 FY 16 FY 14 FY 14 FY 16 FY 15 FY 15 FY 15 FY 15 FY 15 FY 15 FY 15 FY 13 FY 13 FY 13 FY 14 FY 15 FY 16 FY 13 FY 13 FY 14 FY 13 FY 14 FY 12 FY XX FY 12 FY 12 Comments 90/10 Cost Share 90/10 Cost Share No Federal match Required Construction on Hold STIP Project Status Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y N Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y-LINE Y-LINE Y-LINE Y-LINE Y-LINE Y-LINE Y-LINE Y-LINE Y-LINE Y-LINE Y-LINE N-LOCAL N-LOCAL N-LOCAL N-LOCAL AUTH AUTH AUTH AUTH NOTAUTH AUTH NOTAUTH AUTH NOTAUTH AUTH AUTH AUTH NOTAUTH AUTH AUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH AUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH AUTH AUTH NOTAUTH AUTH AUTH NOTAUTH AUTH AUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH AUTH AUTH NOTAUTH AUTH NOTAUTH NOTAUTH NOFUNDS NOTAUTH NOTAUTH 12/17/14 BATON ROUGE METROPOLITAN AREA TRANSPORTATION IMPROVEMENT PROGRAM (2015-2018) (Financially Constrained) Highway Element State Proj No. MTP No. Parish 06-CS-HC-0028 116 EBR 06-CS-HC-0033 08-CS-HC-0035 08-TL-HC-0034 08-TL-HC-0034 09-CS-US-0041 Old Hammond Hwy Seg 2 Proj Limits Millerville Rd - O' Neal Ln Proj Description EBR EBR EBR EBR EBR EBR Essen Ln Nicholson Drive Seg 1 Hooper Rd Hooper Rd I 10 I 12 Essen Ln @ I 10 Brightside Ln - Gourrier Ave Blackwater Bayou to Joor Rd Joor Rd to Sullivan Rd Pecue Ln @ I 10 Millerville Rd @ I 12 (WB Single Ln Ramp) Intersection Improvements Widen to 4 Lanes Widen to 4 Lanes Widen to 4 Lanes New Interchange W/Road Improvements Interchange Reconfiguration 127 128 137 132 148 129 EBR EBR EBR EBR LIV EBR LIV Old Hammond Hwy Seg 1 Perkins Rd Picardy Perkins Connector Glen Oaks Dr Cook Rd Staring/Gardere Ln I-12 Blvd De Province - Millerville Rd Siegen Ln - Pecue Ln Picardy Ave - Perkins Rd Plank Rd - McClelland Pete's Hwy (LA 16) - Juban Rd Burbank - Nicholson Dr Pete's Hwy (LA 16) Interchange @ I-12 I-10 118 118 118 118 EBR WBR Regional EBR EBR EBR EBR LIV LA 408 LA 408 LA 408 LA 408 LA 447 LA 415 to Essen Ln on I-10 and I-12 LA 1 - I-10 Connector 5 Parish Region LA 408 (Hooper Rd Ext) LA 37 - LA 16 LA 408 (Hooper Rd Ext) LA 37 - LA 16 LA 408 (Hooper Rd Ext) LA 37 - LA 16 LA 408 (Hooper Rd Ext) LA 37 - LA 16 LA 447 @ I-12 LIV ASC LA 447 I-10 LA 447 @ I-12 I-10 @ LA 74 Phase Widen to 4 Lanes 117 124 125 126 136 138 H.002397 H.004100 H.005121 H.005201 H.005403 H.005403 H.005403 H.005403 Route C Proj Cost (000) 12,179 Total Cost (000) (W/Contingency) Federal Share (000) 12,179 0 Fund Auth Year LOCAL FY 12 C C C C C C 4,221 26,036 17,327 29,363 55,000 2,300 4,221 26,036 17,327 29,363 55,000 2,300 0 0 0 0 0 0 LOCAL LOCAL LOCAL LOCAL NFI PRIVATE FY 12 FY 14 FY 14 FY 14 FY XX FY 12 Widen to 4 Lanes Widen to 4 Lanes New Road Widen to 3 Lanes New 4 Lane Road New 4 Lane / Widen to 4 Lanes Interchange Improvements - Stage 0 Feasibility C C C C C STUDY STUDY 14,000 16,300 25,579 9,971 17,550 14,000 16,300 25,579 9,971 17,550 0 0 0 0 0 LOCAL LOCAL LOCAL LOCAL LOCAL 467 467 374 DEMO FY 14 FY 14 FY 16 FY 17 FY 17 FY 12 FY 11 Feasibility/Environmental Study Connector Study New Loop - EIS Extension of Hooper Rd Feasibility Study Extension of Hooper Rd Feasibility Study Extension of Hooper Rd Feasibility Study Extension of Hooper Rd Feasibility Study Interchange Improvements Study (Stage 0) STUDY STUDY STUDY STUDY STUDY STUDY ENIV STUDY 3,500 1,500 2,250 180 46 100 677 100 3,500 1,500 2,250 180 46 100 677 100 0 0 0 0 0 0 0 0 STCASH STGEN STCASH STBONDS LOCAL STGEN STBONDS STPFLEX FY 11 FY 07 FY 09 FY 11 FY 11 FY 11 FY 12 FY 11 Interchange Improvements Env Clearance (EIS) State Funds for Study (Stage 0) STUDY STUDY 4,500 4,500 0 0 STBONDS STCASH FY 12 5 Comments Will begin after DOTD completes improvements on I-10 at Essen Ln Design study is complete Aslo a state proj. No funds available. Final design will proceed based on DOTD Funding Stage 0 complete. No funds available Project in early planning process Stage 0 complete Feasibility $1.2 M, Env $2.3 M. Adv Const to be paid back with NHS. LOCAL (DEMO) funds will attribute to portion of total cost STIP Project Status N-LOCAL NOTAUTH N-LOCAL N-LOCAL N-LOCAL N-LOCAL N-LOCAL N-LOCAL NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOFUNDS NOTAUTH N-LOCAL N-LOCAL N-LOCAL N-LOCAL N-LOCAL N-STATE N-STUDY NOTAUTH NOTAUTH NOTAUTH NOTAUTH NOTAUTH AUTH AUTH Y N-STUDY N-STUDY N-STUDY N-STUDY N-STUDY N-STUDY N-STUDY AUTH AUTH AUTH AUTH AUTH AUTH AUTH AUTH N-STUDY N-STUDY NOTAUTH AUTH 12/17/14
© Copyright 2024 ExpyDoc