TIP 2015-2018 Highway Projects Table

BATON ROUGE METROPOLITAN AREA
TRANSPORTATION IMPROVEMENT PROGRAM
(2015-2018)
(Financially Constrained)
Highway Element
State Proj No.
H.000337
H.000337
H.000337
H.000464
H.000464
H.000464
H.000466
H.000466
H.000466
H.000466
MTP No.
139
139
139
140
140
140
140
H.000698
H.000698
H.000698
H.001234
H.001234
H.001234
H.001603
H.001603
H.001603
H.002290
H.002290
H.002290
H.002301
H.002301
H.002301
H.002320
H.002320
H.002320
H.002337
H.002337
H.002337
H.002344
H.002344
H.002344
H.002344
H.002344
H.002370
H.002370
H.002370
H.002370
H.002370
H.002370
H.002370
H.002373
H.002373
H.002373
H.002373
H.002375
H.002375
H.002375
H.002375
H.002423
H.002423
H.002423
H.002423
H.002822
H.002822
H.002822
H.003047
H.003047
H.003047
H.003047
H.003790
H.003790
H.003790
H.003790
H.004634
H.004634
H.004634
H.004634
110
110
110
109
109
109
119
119
119
122
122
122
101
101
101
101
101
101
101
141
141
141
141
120
120
120
136
136
136
136
103
103
103
103
Parish
ASC
ASC
ASC
LIV
LIV
LIV
LIV
LIV
LIV
LIV
EBR
EBR
EBR
WBR
WBR
WBR
EBR
EBR
EBR
EBR
EBR
EBR
EBR
EBR
EBR
EBR
EBR
EBR
EBR
EBR
EBR
EBR
EBR
EBR
EBR
EBR
ASC
ASC
ASC
ASC
ASC
ASC
ASC
LIV
LIV
LIV
LIV
LIV
LIV
LIV
LIV
ASC
ASC
ASC
ASC
EBR
EBR
EBR
EBR
EBR
EBR
EBR
ASC
ASC
ASC
ASC
LIV
LIV
LIV
LIV
Route
US 61
US 61
US 61
US 190, LA 1026
US 190, LA 1026
US 190, LA 1026
US 190
US 190
US 190
US 190
US 61
US 61
US 61
LA 1
LA 1
LA 1
LA 73
LA 73
LA 73
LA 64
LA 64
LA 64
N. Sherwood Forest Blvd
N. Sherwood Forest Blvd
N. Sherwood Forest Blvd
Sullivan Rd
Sullivan Rd
Sullivan Rd
LA 327
LA 327
LA 327
LA 427
LA 427
LA 427
LA 427
LA 427
LA 42
LA 42
LA 42
LA 42
LA 42
LA 42
LA 42
LA 16
LA 16
LA 16
LA 16
LA 16
LA 16
LA 16
LA 16
LA 44
LA 44
LA 44
LA 44
LA 30
LA 30
LA 30
I-10
I-10
I-10
I-10
LA 930
LA 930
LA 930
LA 930
Juban Rd
Juban Rd
Juban Rd
Juban Rd
Proj Limits
Bayou Manchac & Francois Brs.
Bayou Manchac & Francois Brs.
Bayou Manchac & Francois Brs.
US 190 & LA 1026 (Roundabout)
US 190 & LA 1026 (Roundabout)
US 190 & LA 1026 (Roundabout)
Intersection Improvements @ Eden Church
Intersection Improvements @ Eden Church
Intersection Improvements @ Eden Church
Intersection Improvements @ Eden Church
Baker Canal Bridge
Baker Canal Bridge
Baker Canal Bridge
Port Allen Canal Bridge
Port Allen Canal Bridge
Port Allen Canal Bridge
Old Jefferson Hwy @ Antioch Rd
Old Jefferson Hwy @ Antioch Rd
Old Jefferson Hwy @ Antioch Rd
LA 19 to McHugh Rd
LA 19 to McHugh Rd
LA 19 to McHugh Rd
Choctaw Dr - Greenwell Springs Rd
Choctaw Dr - Greenwell Springs Rd
Choctaw Dr - Greenwell Springs Rd
Wax - Hooper Rd
Wax - Hooper Rd
Wax - Hooper Rd
Bayou Fountain
Bayou Fountain
Bayou Fountain
Perkins Rd (Siegen - Highland)
Perkins Rd (Siegen - Highland)
Perkins Rd (Siegen - Highland)
Perkins Rd (Siegen - Highland)
Perkins Rd (Siegen - Highland)
US 61 to LA 44
US 61 to LA 44
US 61 to LA 44
US 61 to LA 44
US 61 to LA 44
US 61 to LA 44
US 61 to LA 44
LA 16 @ LA 22
LA 16 @ LA 22
LA 16 @ LA 22
LA 16 @ LA 22
Amite R. BR. Near French Settlement
Amite R. BR. Near French Settlement
Amite R. BR. Near French Settlement
Amite R. BR. Near French Settlement
Black bayou Bridge Replacement
Black bayou Bridge Replacement
Black bayou Bridge Replacement
Black bayou Bridge Replacement
Nicholson Dr @ Brightside Ln
Nicholson Dr @ Brightside Ln
Nicholson Dr @ Brightside Ln
Pecue Ln / I-10 Interchange
Pecue Ln / I-10 Interchange
Pecue Ln / I-10 Interchange
Pecue Ln / I-10 Interchange
Causey Rd to LA 42
Causey Rd to LA 42
Causey Rd to LA 42
Causey Rd to LA 42
Juban Rd Widening (I-12 - US 190)
Juban Rd Widening (I-12 - US 190)
Juban Rd Widening (I-12 - US 190)
Juban Rd Widening (I-12 - US 190)
Proj Description
Phase
New Bridges
New Bridges
New Bridges
Roundabout
Roundabout
Roundabout
Construct 4-Legged Single Lane Roundabout
Construct 4-Legged Single Lane Roundabout
Construct 4-Legged Single Lane Roundabout
Construct 4-Legged Single Lane Roundabout
Bridge Rehab, Deck, Appr Slab, Abut
Bridge Rehab, Deck, Appr Slab, Abut
Bridge Rehab, Deck, Appr Slab, Abut
Bridge Rehabilitation
Bridge Rehabilitation
Bridge Rehabilitation
Intersection Improvement
Intersection Improvement
Intersection Improvement
Center Turn Lane
Center Turn Lane
Center Turn Lane
Widen to 5 Lanes
Widen to 5 Lanes
Widen to 5 Lanes
Widen to 4 Lanes
Widen to 4 Lanes
Widen to 4 Lanes
New Bridge
New Bridge
New Bridge
Increase Capacity (Stage 0 Study)
Widening
Widening
Widening
Widening
Widening and Improvements
Widening and Improvements
Widening and Improvements
Widening and Improvements
Widening and Improvements
Widening and Improvements
Widening and Improvements
Install Roundabout
Install Roundabout
Install Roundabout
Install Roundabout
New Bridge
New Bridge
New Bridge
New Bridge
Bridge Replacement
Bridge Replacement
Bridge Replacement
Bridge Replacement
Intersection Improvement
Intersection Improvement
Intersection Improvement
New Interchange
New Interchange
New Interchange
New Interchange
Widen LA 930 & Add Open Ditches
Widen LA 930 & Add Open Ditches
Widen LA 930 & Add Open Ditches
Widen LA 930 & Add Open Ditches
Widening
Widening
Widening
Widening
PE
UTIL
C
ROW
UTIL
C
STUDY
ROW
UTIL
C
PE
UTIL
C
PE
UTIL
C
ROW
UTIL
C
ROW
UTIL
C
ROW
UTIL
C
C
C
C
ROW
UTIL
C
STUDY
PE
PE
ENIV
ENIV
ROW
ROW
ROW
UTIL
C
C
C
PE
ROW
UTIL
C
PE
ROW
UTIL
C
PE
ROW
UTIL
C
ROW
UTIL
C
ROW
UTIL
C
C
PE
ROW
UTIL
C
ROW
ROW
UTIL
UTIL
1
Proj Cost
(000)
25
15
12,000
100
150
1,200
6
350
150
1,000
200
10
3,186
330
78
24,255
184
5
1,040
5,400
876
3,600
3,080
350
14,710
19,000
3,000
3,000
60
200
1,666
100
800
20
445
130
8,250
3,500
6,000
3,500
22,000
2,000
1,300
50
600
741
1,800
125
280
5
23,124
126
500
500
1,541
2,100
1,200
6,580
0
0
0
0
530
3,400
1,300
5,300
100
6,900
150
2,500
Total Cost (000)
(W/Contingency)
25
15
13,200
100
150
1,320
6
350
150
1,100
200
10
3,505
330
78
26,681
184
5
1,144
5,400
876
3,960
3,080
350
16,181
20,900
3,300
3,300
60
200
1,833
100
800
20
445
130
8,250
3,500
6,000
3,500
24,200
2,200
1,430
50
600
741
1,980
125
280
5
25,436
126
500
500
1,695
2,100
1,200
7,238
0
0
0
0
530
3,400
1,300
5,830
100
6,900
150
2,500
Federal Share (000)
20
12
10,560
80
120
1,056
5
315
135
990
160
8
2,804
264
62
21,344
0
0
0
4,320
701
3,564
2,464
280
12,945
0
2,640
0
48
160
1,466
0
640
0
356
0
6,600
2,800
4,800
2,800
0
1,980
1,359
40
480
593
1,980
100
224
4
20,349
101
400
400
1,356
1,680
960
5,790
0
0
0
0
0
0
0
0
90
0
135
0
Fund
Auth
Year
STPFLEX
STPFLEX
STPFLEX
HSIP
HSIP
HSIP
SATRANS
HSIP
HSIP
HSIP
FBR-ON/OFF
FBR-ON/OFF
FBR-ON/OFF
FBR-ON/OFF
FBR-ON/OFF
FBR-ON/OFF
LOCAL
LOCAL
LOCAL
STP>200K
STP>200K
HSIP
STP>200K
STP>200K
STP>200K
LOCAL
STPFLEX
STBONDS
FBRON
FBRON
FBRON
STCASH
NHPP
STGEN
NHPP
STGEN
DEMO
STPENH
STP>200K
HSIP
STBONDS
HSIP
TAPFLEX
HSIP
HSIP
HSIP
HSIP
STPFLEX
STPFLEX
STPFLEX
STPFLEX
FBR-ON/OFF
FBR-ON/OFF
FBR-ON/OFF
FBR-ON/OFF
CMAQ
CMAQ
CMAQ
NFI
NFI
DEMO
STGEN
STBONDS
STBONDS
STBONDS
STBONDS
HSIP
STBONDS
HSIP
STBONDS
FY 16
FY 17
FY 18
FY 13
FY 13
FY 13
FY 13
FY 13
FY 13
FY 13
FY 12
FY 13
FY 14
FY 14
FY 14
FY 15
FY 13
FY 13
FY 14
FY 11
FY 11
FY 14
FY 15
FY 15
FY 16
FY 15
FY 15
FY 15
FY 16
FY 16
FY 16
FY 09
FY 15
FY 15
FY 15
FY 15
FY 11
FY 11
FY 12
FY 11
FY 15
FY 15
FY 15
FY 13
FY 13
FY 13
FY 14
FY 20
FY 20
FY 20
FY 20
FY 13
FY 14
FY 14
FY 15
FY 12
FY 12
FY 15
FY 13
FY 13
FY XX
FY XX
FY 13
FY 13
FY 13
FY 14
FY 15
FY 15
FY 15
FY 15
Comments
100% Local Funds
100% Local Funds
100% Local Funds
Local Match Provided by DOTD
95/5 Cost Share
100% Federal Funds
No Funds. Project in Green Light Plan
No Funds. Project in Green Light Plan
No Funds. Project in Green Light Plan
No Funds. Project in Green Light Plan
STIP Project
Status
Y
Y
Y
Y
Y
Y
Y-LINE
Y-LINE
Y-LINE
Y-LINE
Y-LINE
Y-LINE
Y-LINE
Y-LINE
Y-LINE
Y-LINE
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y-LINE
Y-LINE
Y-LINE
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y-LINE
Y-LINE
Y-LINE
Y-LINE
Y
Y
Y
N-STATE
N-STATE
N-STATE
N-STATE
N-STATE
N-STATE
N-STATE
N-STATE
Y
Y
Y
Y
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
AUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
AUTH
AUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
AUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
AUTH
AUTH
AUTH
AUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
AUTH
AUTH
NOTAUTH
NOFUNDS
NOFUNDS
NOFUNDS
NOFUNDS
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
12/17/14
BATON ROUGE METROPOLITAN AREA
TRANSPORTATION IMPROVEMENT PROGRAM
(2015-2018)
(Financially Constrained)
Highway Element
State Proj No.
H.005693
H.006831
H.006831
H.006831
H.007137
H.007137
H.007157
H.007160
H.007160
H.007855
H.007855
H.007855
H.007855
H.007961
H.007961
H.007961
H.007961
H.008173
H.008173
H.008173
H.008190
H.008190
H.008190
H.008193
H.008193
H.008195
H.008732
H.009033
H.009033
H.009033
H.009139
H.009140
H.009140
H.009140
H.009141
H.009144
H.009179
H.009179
H.009180
H.009180
H.009250
H.009263
H.009266
H.009276
H.009288
H.009288
H.009288
H.009290
H.009290
H.009327
H.009327
H.009328
H.009328
H.009429
H.009437
H.009489
H.009548
H.009549
H.009552
H.009595
H.009634
H.009636
H.009637
H.009638
H.009638
H.009647
H.009649
H.009651
MTP No.
111
111
111
105
105
105
105
142
142
142
104
104
104
145
145
145
112
143
102
102
148
148
148
121
Parish
LIV
EBR
EBR
EBR
EBR
EBR
EBR
EBR
EBR
ASC
ASC
ASC
ASC
EBR
EBR
EBR
EBR
LIV
LIV
LIV
LIV
LIV
LIV
LIV
LIV
LIV
Regional
ASC
ASC
ASC
ASC
LIV
LIV
LIV
EBR
EBR
LIV
LIV
LIV
LIV
EBR
LIV
ASC
ASC
WBR
WBR
WBR
EBR
EBR
EBR
EBR
EBR
EBR
ASC
LIV
EBR
LIV
LIV
LIV
LIV
ASC
WBR
ASC
EBR
EBR
EBR
EBR
EBR
Route
LA 447
Jones Creek Rd
Jones Creek Rd
Jones Creek Rd
LA 431
LA 431
LA 431
LA 431
LA 410
LA 410
LA 410
LA 410
LA 1032
LA 1032
LA 1032
LA 1025
LA 1025
LA 1025
LA 3002
LA 3002
LA 3003
LA 44
LA 44
LA 44
US 61
LA 1026
LA 1026
LA 1026
LA 3246
LA 42
Wax Rd
Wax Rd
Plantation Ave / Enterprise Dr
Plantation Ave / Enterprise Dr
I-10
US 190
I-10
I-10
LA 1
LA 1
LA 1
I-10, I-110
I-10, I-110
I-10
I-10
Various Roads
US 190
US 61
US 190
US 190
LA 16
I-12
LA 73
I-10
I-10
I-10
I-10
LA 408, LA 73
LA 67
US 61, US 190
Proj Limits
Proj Description
Phase
Proj Cost
(000)
Total Cost (000)
(W/Contingency)
Federal Share (000)
Fund
Auth
Year
Comments
STIP Project
Status
100% Federal Funds
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y-LINE
Y-LINE
Y-LINE
Y-LINE
Y
Y
Y
Y-LINE
Y-LINE
Y-LINE
Y-LINE
Y-LINE
Y-LINE
Y
Y-LINE
Y-LINE
Y-LINE
Y-LINE
Y-LINE
Y-LINE
Y-LINE
Y-LINE
Y-LINE
Y
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
AUTH
NOTAUTH
NOTAUTH
AUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
AUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
Y
Y
Y
Y-LINE
Y-LINE
Y-LINE
Y-LINE
Y
Y
Y
Y-LINE
Y-LINE
Y-LINE
Y-LINE
Y-LINE
Y-LINE
Y-LINE
Y-LINE
Y-LINE
Y-LINE
Y-LINE
Y-LINE
Y-LINE
Y-LINE
Y-LINE
Y-LINE
Y-LINE
Y-LINE
Y-LINE
Y-LINE
Y-LINE
NOTAUTH
AUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
LA 447/I-12 Interchange
Baton Rouge ITS Deployment (Phase 3)
Baton Rouge ITS Deployment (Phase 3)
Baton Rouge ITS Deployment (Phase 3)
Tigerbend Rd - Coursey Blvd
Tigerbend Rd - Coursey Blvd
Tigerbend Rd - Coursey Blvd
EBR Computerized Traffic Signal 5B
EBR Computerized Traffic Signal 5B
LA 431 @ LA 934 (Goldplace Rd)
LA 431 @ LA 934 (Goldplace Rd)
LA 431 @ LA 934 (Goldplace Rd)
LA 431 @ LA 934 (Goldplace Rd)
Blackwater Bayou Bridge
Blackwater Bayou Bridge
Blackwater Bayou Bridge
Blackwater Bayou Bridge
US 190 @ LA 1032
US 190 @ LA 1032
US 190 @ LA 1032
LA 1025: Creek Br. Near Friendship
LA 1025: Creek Br. Near Friendship
LA 1025: Creek Br. Near Friendship
LA 1034 - US 190
LA 1034 - US 190
LA 16 - LA 1032
Baton Rouge Loop
LA 44 @ LA 934 (Black Bayou Rd)
LA 44 @ LA 934 (Black Bayou Rd)
LA 44 @ LA 934 (Black Bayou Rd)
US 61: Access Mgt @ Swamp Rd (Phase 2)
LA 1026: Access Mgt. & Roundabouts
LA 1026: Access Mgt. & Roundabouts
LA 1026: Access Mgt. & Roundabouts
LA 3246: Access Mgt. Improvements
LA 42: Corridor Improvements
LA 16 - LA 1026
Intersection Improvements/Install Roundabouts
Baton Rouge ITS
Baton Rouge ITS
Baton Rouge ITS
Widen to 5 Lanes
Widen to 5 Lanes
Widen to 5 Lanes (Clearing & Grubbing)
Signal Synchronization
Signal Synchronization
Intersection Improvement
Intersection Improvement
Intersection Improvement
Intersection Improvement
Bridge Replacement
Bridge Replacement
Bridge Replacement
Bridge Replacement
Intersection Improvements
Intersection Improvements
Intersection Improvements
New Bridge
New Bridge
New Bridge
Cold Plane, Patch, & Overlay
Cold Plane, Patch, & Overlay
Cold Plane, Patch, & Overlay
Study of Baton Rouge Loop
Turn Lanes & Sginal Upgrades
Turn Lanes & Sginal Upgrades
Turn Lanes & Sginal Upgrades
Median & Signal Improvements
Roundabout
Roundabout
Roundabout
Median & Signal Improvements
Signal Relocations, Turn Lanes and Adding N
New Base and Overlay
C
STUDY
PE
C
C
C
C
ROW
C
PE
ROW
UTIL
C
PE
ROW
UTIL
C
ROW
UTIL
C
PE
UTIL
C
PE
C
C
ENIV
PE
ROW
C
C
STUDY
ROW
C
C
C
UTIL
5,000
33
325
4,000
12,758
703
298
60
6,200
346
300
140
750
134
500
200
2,379
350
45
903
30
40
571
75
889
588
629
75
400
800
240
16
300
4,125
426
860
75
5,500
33
325
4,400
14,034
773
328
60
6,820
346
300
140
825
134
500
200
2,617
350
45
993
40
40
628
75
978
647
629
75
400
880
264
16
300
4,538
469
946
75
5,500
26
260
3,520
11,227
0
262
48
5,456
277
240
112
660
107
400
160
2,094
315
41
894
32
32
502
60
782
517
503
60
320
704
211
13
240
3,630
375
757
60
STPFLEX
STPFLEX
CMAQ
CMAQ
STP>200K
LOCAL
STP>200K
STP>200K
CMAQ
CMAQ
CMAQ
CMAQ
CMAQ
FBRON
FBRON
FBRON
FBRON
HSIP
HSIP
HSIP
FBR-ON/OFF
FBR-ON/OFF
FBR-ON/OFF
NHS
NHS
STPFLEX
DEMO
HSIP
HSIP
HSIP
STPFLEX
SATRANS
STPFLEX
STPFLEX
NHS
STPFLEX
STP>200K
FY 15
FY 13
FY 13
FY 14
FY 13
FY 13
FY 12
FY 14
FY 16
FY 14
FY 15
FY 15
FY 16
FY 13
FY 14
FY 14
FY 14
FY 14
FY 14
FY 15
FY 12
FY 13
FY 13
FY 13
FY 13
FY 13
FY 13
FY 13
FY 13
FY 13
FY 13
FY 13
FY 14
FY 15
FY 14
FY 14
FY 15
LA 16 - LA 1026
LA 1034 - LA 1032
LA 1034 - LA 1032
Highland Rd - LA 73
US 190: Left Turn Ln @ LA 449
LA 73 - LA 30
LA 30 - LA 22
New RR Bridge @ DOW Spur Xing
New RR Bridge @ DOW Spur Xing
New RR Bridge @ DOW Spur Xing
LSU Laboratory School SRTS Project
LSU Laboratory School SRTS Project
I-10/I-110 Epoxy Br Deck Overlay - BTN ROUGE
I-10/I-110 Epoxy Br Deck Overlay - BTN ROUGE
I-10: Miss. R Br Clean & Spot Paint - BTN RUGE
I-10: Miss. R Br Clean & Spot Paint - BTN RUGE
Various Roads: Signing
US 190: Box Culvert Extensions
Jefferson Highway Overpass
EBR ph. Line - W. Jct LA 16
E. JCT LA 16 - JCT LA 447
JCT LA 1034 - JCT US 190
I-12: LIV Parish Approach Slab Rep P2
LA 30 - LA 429
Interchange Repair @ LA 1 & LA 415
I-10: LA 22 - EBR Parish Line
Washington St - KCS RR Opass
Washington St - KCS RR Opass
LA 408 & LA 73: Improvements
LA 67: US 61/190 - LA 3006
US 61/US 190: US 61/US 190 BUS - Miss. River BR
New Base and Overlay
New Base and Overlay
New Base and Overlay
Capacity Improvements
Left Turn Ln
Capacity Improvements
Capacity Improvements
Grade Separate Existing At-Grade Crossing
Grade Separate Existing At-Grade Crossing
Grade Separate Existing At-Grade Crossing
Bicycle Lanes and Education and Encourage
Bicycle Lanes and Education and Encourage
Epoxy Bridge Deck Overlay
Epoxy Bridge Deck Overlay
Cleaning & Spot Painting
Cleaning & Spot Painting
Signage
Box Culvert Extensions
Bridge Replacement
Maintenance, Restoration & Rehabilitation
Maintenance, Restoration & Rehabilitation
Maintenance, Restoration & Rehabilitation
Roadway Maintenance, Restoration & Rehab
Thin Asphalt Concrete
PCCP Patching & Slope Repairs
PCCP Patching & Slope Repairs
Cold Plane & Overlay
Cold Plane & Overlay
Turn Lanes
PCCP Patching
Cold Plane & Overlay
C
UTIL
C
PE
C
PE
PE
STUDY
PE
C
PE
C
PE
C
PE
C
C
C
C
C
C
C
C
C
C
C
PE
C
C
C
C
1,150
30
555
1,809
350
1,500
1,600
100
2,100
20,000
42
210
410
9,000
276
3,000
21
500
6,854
1,211
2,322
1,405
7,200
881
1,000
4,000
50
3,500
450
4,500
8,438
1,265
30
611
1,809
385
1,500
1,600
100
2,100
22,000
42
231
410
9,900
276
3,300
23
550
7,539
1,332
2,554
1,546
7,920
969
1,100
4,400
50
3,850
495
4,950
9,282
1,012
24
488
1,447
308
1,200
1,280
80
1,680
17,600
38
231
328
7,920
221
2,640
18
495
6,032
1,066
2,043
1,236
7,128
775
990
3,960
45
3,465
396
3,960
7,425
STP>200K
STP>200K
STP>200K
LHIP
STPFLEX
LHIP
LHIP
NHPP
NHPP
NHPP
SATRANS
SR2S
FBR-ON/OFF
FBR-ON/OFF
FBR-ON/OFF
FBR-ON/OFF
SATRANS
HSIP
FBR-ON/OFF
NHS
STPFLEX
STPFLEX
IM
STPFLEX
IM
IM
IM
IM
STPFLEX
STPFLEX
NHS
To be LET after the Off System Bridge Project is
FY 15 LET and constructed.
FY 14
FY 15
FY 12
Earmark
FY 13
FY 12
Earmark
FY 12
Earmark
FY 14
FY 15
FY 18
FY 14
FY 14
FY 13
FY 14
FY 13
FY 14
FY 13
FY 13
FY 16
FY 14
FY 14
FY 14
FY 13
FY 14
FY 14
FY 13
FY 15
FY 16
FY 13
FY 14
FY 14
2
90/10 Cost Share
12/17/14
BATON ROUGE METROPOLITAN AREA
TRANSPORTATION IMPROVEMENT PROGRAM
(2015-2018)
(Financially Constrained)
Highway Element
State Proj No.
H.009667
H.009667
H.009836
H.009836
H.009887
H.009910
H.009943
H.009943
H.009947
H.009950
H.009950
H.009950
H.009956
H.009956
H.009956
H.009956
H.010019
H.010020
H.010020
H.010026
H.010026
H.010026
H.010026
H.010057
H.010065
H.010069
H.010075
H.010094
H.010118
H.010124
H.010124
H.010182
H.010182
H.010232
H.010251
H.010253
H.010254
H.010319
H.010319
H.010320
H.010439
H.010532
H.010534
H.010554
H.010554
H.010560
H.010560
H.010560
H.010560
H.010560
H.010560
H.010565
MTP No.
147
147
106
106
106
106
144
144
131
131
123
123
123
123
123
123
Parish
EBR
EBR
LIV
LIV
LIV
WBR
EBR
EBR
ASC
EBR
EBR
EBR
ASC
ASC
ASC
ASC
ASC
EBR
EBR
ASC
ASC
ASC
ASC
ASC
LIV
WBR
WBR
EBR
WBR
LIV
LIV
ASC
ASC
EBR
EBR
EBR
EBR
EBR
EBR
EBR
EBR
ASC
EBR
EBR
EBR
EBR
EBR
EBR
EBR
EBR
EBR
EBR
Route
LA 67, LA 412
LA 67, LA 412
I-12
I-12
LA 1022
LA 987-4, LA 989-2
US 190
US 190
US 61
I-10
I-10
I-10
LA 44
LA 44
LA 44
LA 44
I-10
I-110
I-110
LA 431
LA 431
LA 431
LA 431
I-10
LA 449
Proj Limits
LA 3064
LA 3064
LA 3064
LA 3064
LA 3064
LA 3064
LA 427
LA 67 & LA 412: Intersection Improvements
LA 67 & LA 412: Intersection Improvements
Walker - 0.5 Mi West of Satsuma
Walker - 0.5 Mi West of Satsuma
LA 1019 - LA 16
LA 987-4 & LA 989-2 Thin Asphalt Concrete Overlay
MISS R BR Clean, Paint, Rep-Ph II
MISS R BR Clean, Paint, Rep-Ph II
US 61: Access Mgt @ LA 44
I-10 Miss R Br Baton Rouge (Pier 5 Rep.)
I-10 Miss R Br Baton Rouge (Pier 5 Rep.)
I-10 Miss R Br Baton Rouge (Pier 5 Rep.)
LA 44: Turn Lanes and Medians
LA 44: Turn Lanes and Medians
LA 44: Turn Lanes and Medians
LA 44: Turn Lanes and Medians
LA 73 Interchange Lighting - Prairieville
I-110 Bridge Over LA 67 Clean & Paint
I-110 Bridge Over LA 67 Clean & Paint
LA 431: Realign Curve, C/L Rumble Strips
LA 431: Realign Curve, C/L Rumble Strips
LA 431: Realign Curve, C/L Rumble Strips
LA 431: Realign Curve, C/L Rumble Strips
LA 22 Interchange Lighting (Sorrento)
Improve Cross Slope
UP (W. Baton Rouge) Winterville Rd
UP (Addis) Several RR-X-Ings
SRTS Lexlee's Kids - Stroll Into Safety
EMER BR Deck Repair on I-10 Over LA 415
LA 16: Roundabout @ LA 447
LA 16: Roundabout @ LA 447
US 61 - LA 44
US 61 - LA 44
I-10/I-110 BR Repairs Ramps II-2 & II-3
Chippewa St Pump Station Imp US 61/US 190-X
Bluebonnet Blvd. Pump Station Imp. LA 1248
15th St Pump Station Improvements I-110
I-110: North St - US 61/190
I-110: North St - US 61/190
LA 42: Jct. Highland Rd - LA 30
Boyd St & 21st St Pumping Station Imp I-110
LA 44 - LA 70
LA 427: LA 42 - Ascension P/L
St. Gabriel Trail at the Leveel Ph 2
St. Gabriel Trail at the Leveel Ph 2
Essen Ln Widen: I-10 to Perkins Rd
Essen Ln Widen: I-10 to Perkins Rd
Essen Ln Widen: I-10 to Perkins Rd
Essen Ln Widen: I-10 to Perkins Rd
Essen Ln Widen: I-10 to Perkins Rd
Essen Ln Widen: I-10 to Perkins Rd
Acadian Street Pumping Station
LA 16
LA 16
LA 42
LA 42
I-10/I-110
US 61-X
LA 1248
I-110
I-110
I-110
LA 42
I-110
LA 22
LA 427
H.010638
LIV
River Rd
GOVERNMENT ST - CENTERVILLE ST
H.010638
LIV
River Rd
GOVERNMENT ST - CENTERVILLE ST
H.010638
LIV
River Rd
GOVERNMENT ST - CENTERVILLE ST
H.010638
H.010639
H.010639
H.010639
H.010639
H.010640
H.010640
H.010640
LIV
ASC
ASC
ASC
ASC
ASC
ASC
ASC
River Rd
LA 939, LA 940
LA 939, LA 940
LA 939, LA 940
LA 939, LA 940
LA 3038 (Cornerview)
LA 3038 (Cornerview)
LA 3038 (Cornerview)
GOVERNMENT ST - CENTERVILLE ST
LA 939 and LA 940 Rehab
LA 939 and LA 940 Rehab
LA 939 and LA 940 Rehab
LA 939 and LA 940 Rehab
LA 3038 (Cornerview): Rehab & Turn Lane
LA 3038 (Cornerview): Rehab & Turn Lane
LA 3038 (Cornerview): Rehab & Turn Lane
Proj Description
Phase
Widen Intersections
Widen Intersections
Widening
Widening
1.5'' Overlay
Thin Asphalt Concrete Overlay
Repair and Painting of Railroad Approaches
Repair and Painting of Railroad Approaches
Modify Existing Intersection, Create Small Median
Rep ro Pier 5 Pier Protection System
Rep ro Pier 5 Pier Protection System
Rep ro Pier 5 Pier Protection System
Intersection Improvements
Intersection Improvements
Intersection Improvements
Intersection Improvements
Interstate Lighting
Cleaning & Painting
Cleaning & Painting
Realign Curve, Center Line Rumble Strips
Realign Curve, Center Line Rumble Strips
Realign Curve, Center Line Rumble Strips
Realign Curve, Center Line Rumble Strips
Interstate Lighting
Improve Cross Slope and Add Raised Pavement
Railroad Signalization
Railroad Signalization
Enforcement, Purchases, Operating Service
Emergency Bridge Deck Repair on I-10 Over LA 415
Roundabout
Roundabout
Clearing and Grubbing with Utility Work
Clearing and Grubbing with Utility Work
Repair Columns on I-10 EB Ramp and Bridge Ramps
Replace/Upgrade Pumphouse Components
Replace Pump Station Float System
Replace/Upgrade Pumphouse Components
Reconstruct JCP @ Grade
Reconstruct JCP @ Grade
PCC Patch
Replace Pump Station Float System
Cold Plane & Overlay
Cold Plane & Overlay
Construction of a Ped-Bike Trail on the Miss. R
Construction of a Ped-Bike Trail on the Miss. R
Widen to 6 Lanes Section W/16' Curb & Gutter
Widen to 6 Lanes Section W/16' Curb & Gutter
Widen to 6 Lanes Section W/16' Curb & Gutter
Widen to 6 Lanes Section W/16' Curb & Gutter
Widen to 6 Lanes Section W/16' Curb & Gutter
Widen to 6 Lanes Section W/16' Curb & Gutter
Replace/Upgrade Pumphouse Components
Minor Widening and Overlay, Some Pavement Patching
Required
Minor Widening and Overlay, Some Pavement Patching
Required
Minor Widening and Overlay, Some Pavement Patching
Required
Minor Widening and Overlay, Some Pavement Patching
Required
Rehabilitate Existing Roadway
Rehabilitate Existing Roadway
Rehabilitate Existing Roadway
Rehabilitate Existing Roadway
Rehab & Turn Lane
Rehab & Turn Lane
Rehab & Turn Lane
3
C
C
C
C
C
C
PE
C
C
PE
C
C
ENIV
ROW
UTIL
C
C
PE
C
PE
ROW
UTIL
C
C
C
C
C
C
C
ROW
C
C
C
C
C
C
C
PE
C
C
C
C
C
C
C
PE
ENIV
ROW
UTIL
C
C
C
Proj Cost
(000)
Total Cost (000)
(W/Contingency)
Federal Share (000)
Fund
Auth
Year
STPFLEX
NFA
STBONDS
NHPP
NFA
NFA
NFI
NFI
SATRANS
STPFLEX
STPFLEX
REIMB
HSIP
HSIP
HSIP
HSIP
IM
FBR-ON/OFF
FBR-ON/OFF
HSIP
HSIP
HSIP
HSIP
IM
SATRANS
RR
RR
SR2S
REIMB
HSIP
HSIP
HSIPPEN
LOCAL
REIMB
STPFLEX
STPFLEX
NHPP
NHPP
NHPP
STPFLEX
NHPP
NFA
NFA
RTP
LOCAL
STPFLEX
STPFLEX
STBONDS
STBONDS
STBONDS
STPFLEX
STPFLEX
FY 13
FY 13
FY 13
FY 13
FY 13
FY 13
FY 13
FY 13
FY 13
FY 13
FY 13
FY 13
FY 15
FY 15
FY 15
FY 16
FY 14
FY 15
FY 16
FY 14
FY 15
FY 15
FY 15
FY 13
FY 13
FY 13
FY 13
FY 13
FY 13
FY 13
FY 14
FY 13
FY 13
FY 13
FY 15
FY 15
FY 14
FY 14
FY 17
FY 14
FY 15
FY 14
FY 14
FY 14
FY 14
FY 13
FY 13
FY 14
FY 14
FY 16
FY 16
FY 15
Comments
STIP Project
Status
Y-LINE
Y-LINE
Y
Y
N-STATE
N-STATE
Y-LINE
Y-LINE
Y-LINE
Y-LINE
Y-LINE
Y-LINE
Y
Y
Y
Y
Y-LINE
Y-LINE
Y-LINE
Y
Y
Y
Y
Y-LINE
Y-LINE
Y-LINE
Y-LINE
Y-LINE
Y-LINE
Y-LINE
Y-LINE
Y
Y
Y-LINE
Y
Y
Y-LINE
Y
Y
Y-LINE
Y-LINE
N-STATE
N-STATE
Y-LINE
Y-LINE
Y
Y
Y
Y
Y
Y
Y
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOFUNDS
NOFUNDS
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
AUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
108
108
15,950
12,600
278
273
400
18,000
85
67
500
100
882
3,376
1,139
5,429
563
180
650
30
625
50
3,900
830
200
250
900
36
43
250
1,000
885
4,500
500
450
50
690
307
21,000
6,500
1,500
1,528
1,288
183
5
800
450
2,250
2,500
6,000
500
450
119
119
17,545
13,860
306
300
400
19,800
94
67
550
110
882
3,376
1,139
5,972
619
180
715
30
625
50
4,290
913
220
275
990
40
47
250
1,100
974
4,950
550
495
55
759
307
23,100
7,150
1,650
1,681
1,417
201
6
800
450
2,250
2,500
6,600
550
495
95
0
0
11,088
0
0
320
15,840
75
54
440
88
794
3,038
1,025
5,375
557
144
572
27
563
45
3,861
822
176
220
792
40
38
225
990
974
0
440
396
44
607
276
20,790
5,720
1,320
0
0
161
0
640
360
0
0
0
440
396
PE
40
40
40
LOCAL
FY 13
Y
AUTH
ENIV
3
3
3
LOCAL
FY 13
Y
AUTH
UTIL
5
5
4
STP>200K
FY 14
Y
AUTH
C
PE
ENIV
C
C
UTIL
UTIL
C
395
260
42
178
1,430
56
56
660
435
260
42
196
1,573
56
56
726
348
0
0
0
1,258
45
0
581
STP>200K
LOCAL
LOCAL
LOCAL
STP>200K
STP>200K
LOCAL
STP>200K
FY 14
FY 13
FY 13
FY 15
FY 15
FY 14
FY 14
FY 15
Y
Y
Y
Y
Y
Y
Y
Y
AUTH
AUTH
AUTH
NOTAUTH
NOTAUTH
AUTH
AUTH
NOTAUTH
100% Federal
DOTD will equally split the local match
KCS agreed to pay $56K
DOTD will equally split the local match
12/17/14
BATON ROUGE METROPOLITAN AREA
TRANSPORTATION IMPROVEMENT PROGRAM
(2015-2018)
(Financially Constrained)
Highway Element
State Proj No.
MTP No.
Parish
113
135
114
115
ASC
ASC
ASC
EBR
EBR
EBR
EBR
EBR
EBR
WBR
WBR
WBR
WBR
WBR
WBR
WBR
WBR
WBR
WBR
WBR
WBR
WBR
ASC
ASC
ASC
Regional
Regional
EBR
EBR
WBR
Regional
EBR
EBR
LIV
LIV
LIV
LIV
EBR
EBR
EBR
ASC
ASC
ASC
ASC
ASC
ASC
ASC
ASC
ASC
EBR
WBR
WBR
WBR
EBR
EBR
EBR
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
EBR
EBR
EBR
EBR
H.010642
H.010642
H.010642
H.010648
H.010648
H.010649
H.010649
H.010650
H.010650
H.010653
H.010653
H.010653
H.010653
H.010654
H.010654
H.010654
H.010655
H.010655
H.010656
H.010656
H.010656
H.010656
H.010657
H.010657
H.010657
H.010674
H.010674
H.010729
H.010729
H.010768
H.011003
H.011213
H.011213
H.011248
H.011248
H.011249
H.011249
H.011310
H.011363
H.011364
H.011450
H.011450
H.011450
H.011451
H.011451
H.011451
H.011452
H.011452
H.011452
H.011483
H.011551
H.011619
H.011619
H.011668
L.000045
L.000058
L.000058
L.000085
L.000085
02-CS-HC-0004
02-PR-CI-0034
03-CS-CI-0020
06-CS-HC-0018
Route
LA 30
LA 30
LA 30
Parishwide
Parishwide
LA 986
LA 986
LA 986
LA 986
LA 415
LA 415
LA 415
LA 1
LA 1
LA 1, LA 76
LA 1, LA 76
LA 1, LA 76
LA 1, LA 76
Parishwide
Parishwide
Parishwide
Regional
Regional
Regional
I-12
I-12
Julia Street
Julia Street
Maple Street
Maple Street
Ford St.
Sherwood Forest Blvd
Goodwood Blvd
LA 70
LA 70
LA 70
LA 22
LA 22
LA 22
LA 942
LA 942
LA 942
Downtown Br & Southern Univ
Essen Lane Bridge Widen
Picardy Perkins Connector
LA 327 Spur
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
Regional
O'Neal Ln
McHugh Rd
Sullivan Rd
Fairchild - Badley Road
Proj Limits
IBERVILLE PL TO 0.3M WEST OF I-10
IBERVILLE PL TO 0.3M WEST OF I-10
IBERVILLE PL TO 0.3M WEST OF I-10
ACADIAN THRUWAY/N. ACADIAN THRUWAY OVLY
ACADIAN THRUWAY/N. ACADIAN THRUWAY OVLY
EBR PARISHWIDE SIGNAL MODIFICATIONS
EBR PARISHWIDE SIGNAL MODIFICATIONS
OLOL MEDICAL COMPLEX AREA STREETS
OLOL MEDICAL COMPLEX AREA STREETS
LA 986 Sidewalks
LA 986 Sidewalks
LA 986 Sidewalks
LA 986 Sidewalks
I-10 TO APPROXIMATELY 0.41M NORTH
I-10 TO APPROXIMATELY 0.41M NORTH
I-10 TO APPROXIMATELY 0.41M NORTH
LA 1 Lighting Renovations
LA 1 Lighting Renovations
LA 1 @ LA 76 Intersection Improvements
LA 1 @ LA 76 Intersection Improvements
LA 1 @ LA 76 Intersection Improvements
LA 1 @ LA 76 Intersection Improvements
Ascension Parish Pavement management
Ascension Parish Pavement management
Ascension Parish Pavement management
DMS Ladder System - Phase 2
DMS Ladder System - Phase 2
Traffic Signal Coord & Synch Ph VI
Traffic Signal Coord & Synch Ph VI
Multi-Use Trails, Phase I-B
BRMPO Travel Demand Management 2013
Sound Barrier Wall @ Essen Lane
Sound Barrier Wall @ Essen Lane
Julia Street Overlay and Widening
Julia Street Overlay and Widening
Maple Street Overlay and Widening
Maple Street Overlay and Widening
Ford St. Ext. & New Connection to LA 408
Sherwood (Airline Hwy to Old Hammond)
Goodwood Blvd Rehab (Lobdell to Airline)
LA 70 Rehabilitation (LA 22 - St. James Parish Line)
LA 70 Rehabilitation (LA 22 - St. James Parish Line)
LA 70 Rehabilitation (LA 22 - St. James Parish Line)
LA 22 Rehabilitation (I 10 - LA 429)
LA 22 Rehabilitation (I 10 - LA 429)
LA 22 Rehabilitation (I 10 - LA 429)
LA 942 Rehabilitation (LA 22 - 0.5mi W of St. Elmo St)
LA 942 Rehabilitation (LA 22 - 0.5mi W of St. Elmo St)
LA 942 Rehabilitation (LA 22 - 0.5mi W of St. Elmo St)
Bike Racks - Downtown Br & Southern Univ
CNG Vehicles - Convert & Purchase
CNG Fueling Station
CNG Fueling Station
Perkins to I-10
Picardy Perkins Connector
LA 327 Spur: Staring Lane Extension
Flex to Transit
Flex to Transit
Flex to Transit
Flex to Transit
Flex to Transit
Flex to Transit
Flex to Transit
Flex to Safety
Flex to Safety
Advanced Traffic Management Center
Advanced Traffic Management Center
S. Harrell's Ferry Rd - George O'Neal
Wimbush Dr to Lower Zachary Rd
Central Thruway - Wax Rd
Scenic Hwy to Veterans Blvd
Proj Description
Phase
Cold Plane & Overlay
Cold Plane & Overlay
Cold Plane & Overlay
Pavement Rehabilitation
Pavement Rehabilitation
Signal Modifications
Signal Modifications
Rehabilitate Existing Roadway
Rehabilitate Existing Roadway
Installation of Sidewalks
Installation of Sidewalks
Installation of Sidewalks
Installation of Sidewalks
Pavement Rehabilitation
Pavement Rehabilitation
Pavement Rehabilitation
Lighting Improvements
Lighting Improvements
Turn Lanes
Turn Lanes
Turn Lanes
Turn Lanes
Parishwide Pavement Management Software
Parishwide Pavement Management Software
Parishwide Pavement Management Software
Install Access Ladders
Install Access Ladders
Signal Synchronization
Signal Synchronization
Multi-Use Trails, Phase I-B
Establish and implement TDM strategies
Sound Barrier Wall
Sound Barrier Wall
Overlay and Widening
Overlay and Widening
Overlay and Widening
Overlay and Widening
New Road (Feasibility Study)
Rehabilitation
Rehabilitation
Rehabilitation
Rehabilitation
Rehabilitation
Rehabilitation
Rehabilitation
Rehabilitation
Rehabilitation
Rehabilitation
Rehabilitation
Install New Bike Racks
Convert & Purchase CNG Vehicles
Construct new CNG Fueling Station
Construct new CNG Fueling Station
Widen to 6 lanes
New Road (Feasibility Study)
New Road (Environmental)
10 New CNG Vans
Maintenance Facility Upgrade
Improved Transit Information
Service Expansion
Service Expansion
Service Expansion
Operations
City's Share of MAP FY 2013
City's Share of MAP FY 2014
Operations
Operations
Widen to 4 Lanes
Base Widening W/Shoulders
Widen to 4 lanes
Base Wideninig, Curb & Gutter W/Sidewalks
PE
ENIV
C
PE
C
PE
C
PE
C
PE
ENIV
UTIL
C
PE
ENIV
C
PE
C
PE
ENIV
UTIL
C
PE
PE
PE
PE
C
PE
C
C
PE
PE
C
UTIL
C
UTIL
C
STUDY
C
C
ENIV
PE
C
ENIV
PE
C
ENIV
PE
C
C
C
C
C
C
STUDY
ENIV
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
4
Proj Cost
(000)
115
2
2,700
174
2,900
22
1,500
60
1,000
55
40
60
658
45
30
530
15
485
35
40
50
427
50
50
50
240
1,100
600
8,200
700
100
50
1,300
5
390
20
576
15
3,864
1,527
1
62
1,282
2
74
2,134
1
40
721
54
335
910
625
950
15
500
1,500
500
700
3,600
3,600
3,600
800
350
350
300
300
17,911
6,379
25,776
5,707
Total Cost (000)
(W/Contingency)
115
2
2,970
174
3,190
22
1,650
60
1,100
55
40
60
724
45
30
583
15
534
35
40
50
470
50
50
50
240
1,210
600
9,020
770
100
50
1,430
5
429
20
634
15
4,250
1,680
1
62
1,410
2
74
2,347
1
40
793
59
369
1,001
688
1,045
15
500
1,500
500
700
3,600
3,600
3,600
800
385
385
330
330
17,911
6,379
25,776
5,707
Federal Share (000)
115
2
2,376
174
2,552
22
1,650
60
880
55
40
48
579
45
30
466
15
427
35
40
40
376
40
40
40
192
968
480
7,216
616
100
45
1,287
4
343
16
507
0
3,188
1,260
0
0
1,128
0
0
1,878
0
0
634
48
295
0
550
0
12
400
1,125
375
525
900
900
900
800
308
308
264
264
0
0
0
0
Fund
Auth
Year
LOCAL
LOCAL
STP>200K
LOCAL
STP>200K
LOCAL
STP>200K
LOCAL
STP>200K
LOCAL
LOCAL
STP>200K
STP>200K
LOCAL
LOCAL
STP>200K
LOCAL
STP>200K
LOCAL
LOCAL
STP>200K
STP>200K
STP>200K
STP>200K
STP>200K
DEMO
DEMO
CMAQ
CMAQ
CMAQ
CMAQ
NHPP
NHPP
STP>200K
STP>200K
STP>200K
STP>200K
NFA
STP>200K
STP>200K
LOCAL
LOCAL
STP>200K
LOCAL
LOCAL
STP>200K
LOCAL
LOCAL
STP>200K
CMAQ
CMAQ
LOCAL
CMAQ
STBONDS
STPFLEX
STPFLEX
CMAQ
CMAQ
CMAQ
CMAQ
CMAQ
CMAQ
CMAQ
CMAQ
CMAQ
CMAQ
CMAQ
LOCAL
LOCAL
LOCAL
LOCAL
FY 13
FY 13
FY 14
FY 13
FY 15
FY 13
FY 15
FY 13
FY 15
FY 13
FY 13
FY 14
FY 15
FY 13
FY 13
FY 16
FY 16
FY 17
FY 15
FY 15
FY 16
FY 16
FY 14
FY 15
FY 16
FY 14
FY 14
FY 16
FY 18
FY 16
FY 14
FY 15
FY 15
FY 17
FY 17
FY 17
FY 17
FY 15
FY 17
FY 17
FY 14
FY 14
FY 16
FY 14
FY 14
FY 16
FY 14
FY 14
FY 16
FY 15
FY 15
FY 15
FY 15
FY 15
FY 15
FY 15
FY 13
FY 13
FY 13
FY 14
FY 15
FY 16
FY 13
FY 13
FY 14
FY 13
FY 14
FY 12
FY XX
FY 12
FY 12
Comments
90/10 Cost Share
90/10 Cost Share
No Federal match Required
Construction on Hold
STIP Project
Status
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
N
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y-LINE
Y-LINE
Y-LINE
Y-LINE
Y-LINE
Y-LINE
Y-LINE
Y-LINE
Y-LINE
Y-LINE
Y-LINE
N-LOCAL
N-LOCAL
N-LOCAL
N-LOCAL
AUTH
AUTH
AUTH
AUTH
NOTAUTH
AUTH
NOTAUTH
AUTH
NOTAUTH
AUTH
AUTH
AUTH
NOTAUTH
AUTH
AUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
AUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
AUTH
AUTH
NOTAUTH
AUTH
AUTH
NOTAUTH
AUTH
AUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
AUTH
AUTH
NOTAUTH
AUTH
NOTAUTH
NOTAUTH
NOFUNDS
NOTAUTH
NOTAUTH
12/17/14
BATON ROUGE METROPOLITAN AREA
TRANSPORTATION IMPROVEMENT PROGRAM
(2015-2018)
(Financially Constrained)
Highway Element
State Proj No.
MTP No.
Parish
06-CS-HC-0028
116
EBR
06-CS-HC-0033
08-CS-HC-0035
08-TL-HC-0034
08-TL-HC-0034
09-CS-US-0041
Old Hammond Hwy Seg 2
Proj Limits
Millerville Rd - O' Neal Ln
Proj Description
EBR
EBR
EBR
EBR
EBR
EBR
Essen Ln
Nicholson Drive Seg 1
Hooper Rd
Hooper Rd
I 10
I 12
Essen Ln @ I 10
Brightside Ln - Gourrier Ave
Blackwater Bayou to Joor Rd
Joor Rd to Sullivan Rd
Pecue Ln @ I 10
Millerville Rd @ I 12 (WB Single Ln Ramp)
Intersection Improvements
Widen to 4 Lanes
Widen to 4 Lanes
Widen to 4 Lanes
New Interchange W/Road Improvements
Interchange Reconfiguration
127
128
137
132
148
129
EBR
EBR
EBR
EBR
LIV
EBR
LIV
Old Hammond Hwy Seg 1
Perkins Rd
Picardy Perkins Connector
Glen Oaks Dr
Cook Rd
Staring/Gardere Ln
I-12
Blvd De Province - Millerville Rd
Siegen Ln - Pecue Ln
Picardy Ave - Perkins Rd
Plank Rd - McClelland
Pete's Hwy (LA 16) - Juban Rd
Burbank - Nicholson Dr
Pete's Hwy (LA 16) Interchange @ I-12
I-10
118
118
118
118
EBR
WBR
Regional
EBR
EBR
EBR
EBR
LIV
LA 408
LA 408
LA 408
LA 408
LA 447
LA 415 to Essen Ln on I-10 and I-12
LA 1 - I-10 Connector
5 Parish Region
LA 408 (Hooper Rd Ext) LA 37 - LA 16
LA 408 (Hooper Rd Ext) LA 37 - LA 16
LA 408 (Hooper Rd Ext) LA 37 - LA 16
LA 408 (Hooper Rd Ext) LA 37 - LA 16
LA 447 @ I-12
LIV
ASC
LA 447
I-10
LA 447 @ I-12
I-10 @ LA 74
Phase
Widen to 4 Lanes
117
124
125
126
136
138
H.002397
H.004100
H.005121
H.005201
H.005403
H.005403
H.005403
H.005403
Route
C
Proj Cost
(000)
12,179
Total Cost (000)
(W/Contingency)
Federal Share (000)
12,179
0
Fund
Auth
Year
LOCAL
FY 12
C
C
C
C
C
C
4,221
26,036
17,327
29,363
55,000
2,300
4,221
26,036
17,327
29,363
55,000
2,300
0
0
0
0
0
0
LOCAL
LOCAL
LOCAL
LOCAL
NFI
PRIVATE
FY 12
FY 14
FY 14
FY 14
FY XX
FY 12
Widen to 4 Lanes
Widen to 4 Lanes
New Road
Widen to 3 Lanes
New 4 Lane Road
New 4 Lane / Widen to 4 Lanes
Interchange Improvements - Stage 0 Feasibility
C
C
C
C
C
STUDY
STUDY
14,000
16,300
25,579
9,971
17,550
14,000
16,300
25,579
9,971
17,550
0
0
0
0
0
LOCAL
LOCAL
LOCAL
LOCAL
LOCAL
467
467
374
DEMO
FY 14
FY 14
FY 16
FY 17
FY 17
FY 12
FY 11
Feasibility/Environmental Study
Connector Study
New Loop - EIS
Extension of Hooper Rd Feasibility Study
Extension of Hooper Rd Feasibility Study
Extension of Hooper Rd Feasibility Study
Extension of Hooper Rd Feasibility Study
Interchange Improvements Study (Stage 0)
STUDY
STUDY
STUDY
STUDY
STUDY
STUDY
ENIV
STUDY
3,500
1,500
2,250
180
46
100
677
100
3,500
1,500
2,250
180
46
100
677
100
0
0
0
0
0
0
0
0
STCASH
STGEN
STCASH
STBONDS
LOCAL
STGEN
STBONDS
STPFLEX
FY 11
FY 07
FY 09
FY 11
FY 11
FY 11
FY 12
FY 11
Interchange Improvements Env Clearance (EIS)
State Funds for Study (Stage 0)
STUDY
STUDY
4,500
4,500
0
0
STBONDS
STCASH
FY 12
5
Comments
Will begin after DOTD completes
improvements on I-10 at Essen Ln
Design study is complete
Aslo a state proj. No funds available.
Final design will proceed based on DOTD
Funding
Stage 0 complete. No funds available
Project in early planning process
Stage 0 complete
Feasibility $1.2 M, Env $2.3 M. Adv Const to be
paid back with NHS.
LOCAL (DEMO) funds will attribute to portion
of total cost
STIP Project
Status
N-LOCAL
NOTAUTH
N-LOCAL
N-LOCAL
N-LOCAL
N-LOCAL
N-LOCAL
N-LOCAL
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOFUNDS
NOTAUTH
N-LOCAL
N-LOCAL
N-LOCAL
N-LOCAL
N-LOCAL
N-STATE
N-STUDY
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
NOTAUTH
AUTH
AUTH
Y
N-STUDY
N-STUDY
N-STUDY
N-STUDY
N-STUDY
N-STUDY
N-STUDY
AUTH
AUTH
AUTH
AUTH
AUTH
AUTH
AUTH
AUTH
N-STUDY
N-STUDY
NOTAUTH
AUTH
12/17/14