Business Approach @Cflex SAP BW-on-HANA

SAP BW-on-HANA
Business Approach @Cflex
05-2014
Agenda
Company Presentation
Project ‘Figures & Facts’
Summary & Outlook
Page 2
Our Mission
1
We are a global company.
We produce flexible packaging and labels.
We make daily goods available.
For everybody.
Everywhere.
2
Together with our customers
we create superior solutions.
3
Consumers sense the difference.
4
We live packaging.
With passion.
Every day.
Page 3
Facts and Figures
1.7
billion €
sales
(pro forma)*
over
3,000
customers
42
production plants in
18
more than
8,000
employees
countries
Our products are
sold in
115
countries
#2
#4
* Pro forma Sales 2013 are adjusted for full year revenues of acquisitions (sales impact: EUR 57 million)
Page 4
in Europe
globally
Our Divisions
Page 5
Complete Range of Solutions
Dairy
Die-Cut Lids, Reel-fed,
Foil-/Film based Wrappers, Banderole
Confectionery
& Processed Food
Foil-/Film based Wrappers, Twist Film,
Portion Pack Capsules, Bags & Pouches
Processed Meat
Alu-container Systems
Bags & Pouches Laminates
Pharma
Coldform Foil
Sachet Foil
Blister Lidding Foil
Home
& Personal Care
Sachet Foil,
Bag-on-Valve Laminate
Beer
Paper labels, Pressure Sensitive Labels,
Aluminum foil bottle neck
Softdrinks
& Water
Aluminum lid labels for beverage cans,
Paper label, Wrap around labels
In-Mould
In-Mould decoration
In-Mould with functionality
Page 6
Global Production Network
42 Plants – 18 Countries
Food Focus
Pharma / HPC Focus
Labels
Page 7
Agenda
Company Presentation
Project ‘Figures & Facts’
Summary & Outlook
Page 8
Motivation for BW-on-HANA
Starting point (System environment)
•
BW 7.31 SP05 3-Tier (Production, Quality, Development) including BCS & BI/BO 4.0
•
BWA in place for test purposes (Leasing contract with Cubeserv)
•
Frontend: BEX Querydesigner, BEX Analyzer, BEX WAD Templates, BI Crystal Reports
ISSUE - Monthly Closing / Data delivery
•
30 Minutes schedule for Meta process chains (FI, CO, Treasury, ..)
•
15 Minutes schedule for consolidation reporting (BCS) process chain
 Only possible with optimization workarounds but running out of ideas!
ISSUE – Excel Reporting (BEX Analyzer workbooks)
•
Partly complex and huge workbooks in place
 Slow performance (runtime > 10 minutes)
ISSUE – Web Reporting (WAD & Crystal Reports)
•
WAD dashboards with several queries (only sequential processing possible)
•
Implementation of BO objects (Crystal) within portal incredible slow (BICS interface)
 Performance not acceptable  Project ‚On Hold‘
DECISION:
•
•
Page 9
Start BW-on-HANA Project with Proof-of-concept phase
Implementation partner: CubeServ
Phase I - Proof-of-Concept
Systems (for comparison)
•
BW 7.31 SP05 with accelerator (BWA)
•
BW 7.31 SP05 without accelerator
 SB3 7.31 SP09 (HANA enabled sandbox)
Process
Chains
BCS Monitor
Queries
Integrated
Planning
Workbooks
CIS Reporting
(Dashboards)
Locations
•
Headquarter Vienna (Rivergate)
•
Hueck Germany
 LAN & Citrix access scenarios
Choosen processes
•
ABAP Stack – Process chains, Integrated
Planning, BCS (Consolidation Monitor)
•
JAVA Stack – Sales Cockpits (WAD
Templates), Crystal Reports
•
Frontend – Workbooks, Queries, Integrated
Planning, File Upload
 IT and Business test cases!
Page 10
Phase I - Proof-of-Concept
Performance Improvement
Process Chains
BEX Queries
~ 30 - 200%
~20 – 90 %
Workbooks
CIS Reporting
(Only Dashboards)
~10 – 100 %
> 100 %
+ BW-on-HANA PoC sucessfully tested!
+ Visible Performance improvement
+ Positive Feedback from Business too
*) In some cases tested results were not 100%
traceable. Behaviour due to HANA or to different
Hardware?  NEED to be clarified!
BCS Monitor
> Faster
Integrated Planning
> Faster
(but no issue so far)
(but reason unclear *)




Page 11
Known performance lacks still remain
BCS reporting with virtual provider access
FrontEnd issues like workbooks with macros
BI Portal embedded BO objects like Crystal
reports (BICS interface)
Citrix/Network
Overall Project Plan
2014
10
11
2015
12
CW43
01
CW50
02
03
04
05
CW19
CW09
CW20
06
CW22 CW23
CW25
PHASE I: Proof-Of-Concept
PoC Sandbox
HANA Prepare
&Install
PoC Sandbox
Testscenarios
Year-End
Closing
PHASE II: HANA-Migration BW environment
Project
Sandbox
Prepare&Install
Project
Sandbox
Testscenarios
Project
Rescheduled
(Finance)
PRODUCTION
HANA
Migration
~3 days
Downtime
DEVELOP
HANA
Migration
QUALITY
HANA
Migration
Development Stop
Transport Stop
Page 12
SANDBOX
HANA
Migration
Overall Project - Findings
Testcases (Sandbox)
•
Nearly 100 IT and 50 Business testcases defined and executed
•
Around 20 reported issues during test phase with sandbox system
 But major part of errors due to system copy or service pack upgrade
DWH processes (RSA1)
•
HANA optimized infocubes working fine for all datamodels with one exception
 Not possible for BCS reporting dataflow as 3.x ETL process still obligatory
•
BWA in usage  Delete all BWA indices in advance
 Otherwise query execution error (report RSDDB_LOGINDEX_CREATE helpful)
ETL processes (RSPC/RSPCM)
•
Depending on used items within process chains minor modifications are necessary
•
Especially custom process steps with ABAP jobs (e.g. build aggregates) need to be checked
•
Partly also ABAP coding for master data extraction needed to be adjusted
•
Transformations: Expert routines need to be checked and modified (RSADMIN parameter)
Page 13
Overall Project - Findings
Reporting processes (BEX)
•
Nearly all identified issues were due to Service Pack SP09 or SAPGUI Patch Upgrade (FEP600)
 Adhoc reporting: Usage of filter not working, currency conversion not working, …
 Verify query and/or multiprovider settings for property ‚SAP HANA/BWA Ops‘
Misc
•
In advance reorganization of tables strongly recommended (e.g. UCL2040 if BCS used)
•
Shortdump issue with planning sequences with certain number of planning functions
Some recommended OSS notes (beside HANA related ones)
•
2022169
•
1851875
•
1901095
•
…
Page 14
Agenda
Company Presentation
Project ‘Figures & Facts’
Summary & Outlook
Page 15
Project Summary
+ HANA Migration for BW Production
•
+
•
•
Within 3 days without any major issue
•
•
Move to BW 7.40 was too risky due to
unclear situation related to BCS support
Reporting performance
Very good results for nearly all workbooks
and web reports (dashboards)
E.g. workbook with more than 80 queries
executed in 4 minutes (we started 2012 with
20 minutes)
•
•
+ ETL performance
•
Next BW Upgrade project in scope
Process chain execution with excellent
performance
E.g. monthly process chain for COPA rebuild
procedure needs 1 instead of 2 days.
Page 16
HANA Migration for BW Development
Topic ‚Systemcopy‘ seems to be the main
challenge within Cflex environment
Mainly caused by slow NFS (Network file
system) configuration and several issues
Project Summary
Base IT driven project
•
Project workload between base team & application team ~ 70:30
•
High-availability scenario due to HANA (1.0 SP7 Rev 73) cluster setup
•
Connection to Solution Manager (monitoring) in place
•
HANA ‚enabled‘ software for backup & restore (full/incremental)
•
Backup and restore configuration vs. Cluster replication procedure
•
Administration and monitoring with HANA Studio
•
…
Page 17
Outlook
Short-Term topics
Redesign of
current
datamodels
New planning
solution
Datamodel Redesign
• Further optimization of process chains
• DWH optimization foreseen
•
•
•
Design of new
reporting
solutions
FrontEnd
Tools
Reduce amount of infocubes
Reduce DWH layer
(Historical, U&T, Reporting, Information)
Best Practice cases for new BI projects
FrontEnd Tools
• Rollout of Advanced Analysis Office
• Maybe prototype of DesignStudio depending
on 1.3 functionality
•
•
Page 18
DesignStudio 1.2 promising (compared to
other BO tools) but not ready yet
Maybe testcases with Workspaces and/or
Information composer
Outlook
Mid-Term topics
Redesign of
current
datamodels
Design of new
reporting
solutions
New planning
solution
FrontEnd
Tools
New planning solution
• Business not satisfied with integrated
planning processes
• CFO driven project for software evaluation
• HANA represents 1 of 3 preconditions for
‚Unified Planning‘ (BPC, PAK, …).
Design of new solutions
• Usage of HANA datamodel components to
allow e.g. complex file upload scenarios
• Usage of HANA datamodel components to
allow topics like KPI reporting (based on
BCS source)
Page 19
www.cflex.com
Page 20