BTS Biogas Srl/GmbH

BTS Biogas Srl/GmbH
Company Overview
© TSenergyGroup | 2014
1
Short description
BTS Biogas, is active in the design, engineering and construction of turnkey or
modular biogas power plants with a rated capacity of 50 kW to 1.5 MW+.
With an experience of more than twenty years, BTS has built 170 plants with a
total capacity of 134 MW. With its full-service contracts, the company offers a
complete package for operators comprising maintenance, servicing and biological
optimization.
BTS’s activities cover the entire value chain, from biomass cultivation to the use
of digestate. BTS Biogas engineers plants that make exclusive use of agricultural
residues such as wheat, rice or corn straw, manure, landscaping material and
organic wastes.
The company has 120 employees (biologists, technicians, chemists and
agronomists) committed to product development and enhancement at BTS
Biogas.
Their competence and over twenty years of experience in the energy sector make
TS energy GROUP, to which BTS Biogas and GTS Syngas are affiliated, Italy’s
biggest operator for one-stop shopping in the field of biogas.
© TSenergyGroup | 2014
2
Development of Revenue
Engineering + Monitoring of plants
80,000,000 €
74,804,969 €
70,000,000 €
60,000,000 €
50,000,000 €
46,426,368 €
40,000,000 €
30,000,000 €
31,497,272 €
20,000,000 €
10,000,000 €
0€
2010
2011
2012
2013
60% growth in 2012, continues for 2013, especially in Asia. Since beginning of 2014 active in USA,
120 academic co-workers; engineers, chemists and technicians.
© TSenergyGroup | 2014
3
The Group
BIOGAS
© TSenergyGroup | 2014
SYNGAS
AGRICULTURE
4
Our company in a glance
BTS Biogas GmbH
UTS Italia Tecnologie
Ambientali srl
TS energy Group
goes abroad
Growth in 2012 – 60%
UTS Umwelt Technik
Süd GmbH
1992 - 2002
• UTS Umwelt Technik
Süd GmbH
• 1996 first biogas
power plant in Italy
2002 - 2007
• UTS Italia Tecnologie
Ambientali srl
• 2006 first Info Biogas
© TSenergyGroup | 2014
2007
2007
- 2011
- 2011
• 2007 new owner
• 2008 B.T.S. Italia
• 2009 BTS Biogas GmbH
2011
• 2011 GTS Syngas GmbH
• 2012 International Centre Affi
• 2013 BTS goes Japan
5
Our company: subsidiaries
Logistics & International Training Centre
Affi (VR) – Italy
800 m² offices
3500 m² warehouse
18500 m² surface
METANlab laboratory
Porto Mantovano (MN) Italy
First company in Italy with an own
biogas laboratory - METANlab
© TSenergyGroup | 2014
6
Products
• Turnkey biogas power plants (modules from 50 kW up to 1.5 MW+)
which can flexibly be combined and multiplied
• Possible use of various types of biomass
• Costumized solutions (for the farmers, industrial agronomists,
communities and investors in many countries)
• Software development for our customers
© TSenergyGroup | 2014
7
Integrated technologies
© TSenergyGroup | 2014
8
Control of complete value chain
• By means of our own laboratory "METANlab" we’re able to
optimize the seed, the harvest, the silage and the
biochemical operation of the biogas power plants of our
customers
• An occupancy rate of at least 8,000 full-load hours per year
• Automation and software development
© TSenergyGroup | 2014
9
Plants
• Over 20 years of experience in agriculture – in the design,
construction and operation of biogas power plants (modules
from 50 KW up to 1.5 MW)
• A “Repowering” of biogas power plants with the
BIOaccelerator technology (accelerated fermentation and
increase of the methane yield thanks to the pre-treatment of
the biomass)
• Full Service - maintenance, technical service and biological
support
© TSenergyGroup | 2014
10
BTS Bio Gas Plants are Superior to
Other Bio Gas Plants
• 20 years of experience in building and operating a large
numbers of plants
• Pre treatment of substrates (raw materials) with BTS
“BIOaccelerator” allows to use various different substrates
at high yield
• Continuous monitoring (online) of the digestion parameters
in combination with the use of the Dina METAN software
allows at any time to calculate the optimum available feed
stock addition to the reaction in process
• This allows to guarantee performance of 8000 hours per
year production at full capacity
© TSenergyGroup | 2014
11
BTS Technology Highlights
Profitability of a bio gas plant depends on the
productivity level of such a difficult bio gas process
•
•
•
•
•
BIOseparator
BIOaccelerator
METANmax
ɳ[ETA]max
NITROstripp & BIOdry
© TSenergyGroup | 2014
12
Top Ten Best Performance Plant
kWh
Soresina
Zambelli
AGT 1
BMZ
Finato
Volpi
Gallmann
Grazioli
Martinoni
Ghione
Pos.
1
2
3
4
5
6
7
8
9
10
[kW]
634
996
999
995
700
998
997
250
526
990
% of
Jan-Dec 2012 Full production
5.538.512
8.651.679
8.671.338
8.634.566
6.064.662
8.640.561
8.626.082
2.162.177
4.543.925
8.539.829
99,46
98,88
98,82
98,75
98,65
98,58
98,49
98,44
98,28
98,20
Full running
hours
8.736
8.686
8.680
8.678
8.664
8.658
8.652
8.649
8.639
8.626
Average:
8.667 h
© TSenergyGroup | 2014
13
Thank you for your patience