GIS Website Legend - Whangarei District Council

Standard
Pipe Services
0
r
Hydrant
Valve
Water Pipeline
Stormwater
"
K
+
Proposed Subdivisions
+
Resources
K
Manhole
Lamphole
Mineral Extraction
Paper Roads
Unformed Public Roads
Instability Areas
Maori Significant Sites
#

High Instability Zone h
Maori Significant Sites
Medium Instability Zone m
Heritage Buildings
Low Instability Zone l
Streams
Airport Noise Boundary
Airport Outer Noise Control
Contours 20m
WDC Reserves
DOC Land
PumpStation
Valve
CHZ2 Lower Hazard
General Location
Sewer
I
y
B
Coastal Erosion
CHZ1 Higher Hazard
Junction
Stormwater Pipeline
Hazards
GPS located
Inlet/Cesspit
Manhole
District Plan
Archeological Sites
@
Water
Land Resources
Acquifers
Sewer Pipeline
Ý
Mine Zones
Runway
Mining Hazard 1 HIGH
Helicopter Hovering Area
Mining Hazard 2 Medium
Building Line Restrictions
Mining Hazard 3 Low
Esplanade Priority Areas
Flood Zone
Protected Trees
Flood Susceptibility
DPlan Coastal Hazards
Effluent UNsuitability
CHZ1 Higher Hazard
High Unsuitability
CHZ 2 Lower Hazard
Medium Unsuitability
DPlan Mining Zones
Default Items
Properties
Roads
STATE HIGHWAY
ARTERIAL
COLLECTOR
PUBLIC ROAD
ACCESSWAY
SERVICE LANE
RAILWAY
Coastal Boundary
Far North District
Kaipara District
Rodney District
Whangarei District
Legend Updated : Feb18,2011
Sea
Mining Hazard 1 HIGH
Mining Hazard 2 Medium
Environments
High Potential
Mining Hazard 3 Low
Future Business
DPlan Flood Susceptible
Future Living
Goat Control Areas
Future Marine Village
Outstanding Natural Features
Business 1
Effluent Disposal Potential
Medium
Low Potential
Landscape
Business 2
Outstanding Landscape Area
Business 3
Notable Landscape Area
Business 4
Town Basin
Port Marsden
Environments
# # # Power Lines -Transpower
Port Nikau
DPlan Roads-Arterial
Airport
DPlan Roads-Collector
Living 1
DPlan Roads-Local
Living 2
Overlay Scheduled Sites & number
Living 3
Coastal Countryside
Designations & number
Countryside - White areas
Helicopter Path
Open Space
There are differences in some District Plan layers compared to other layers as: Mining, Flood, CoastalErosion. This is due to the
legal processes of the DPlan. Please talk to a Policy Planner for clarification.
Use the Coastal Erosion/Hazards with caution. The lines are indicative and not survey accurate. Always view the engineering
reports by Gibbs. The Instability Reports & Effluent Disposal Potential (#22789 &22705) are by Tonkin&Taylor.
Effluent Unsuitability by DuffilWatts &NRC.
Always get a LIM report if in doubt. Come in and see WDC Customer Services for further information.
GIS Website Map Legend
www.wdc.govt.nz
Cadastral Information derived from Land Information New Zealand.
CROWN COPYRIGHT RESERVED.
Information shown is the currently assumed knowledge as at date
printed. If information is vital, confirm with the authorative owner WDC