NOE CONTRERAS ORTEGA. Av. Camino al Cóbano #725 Fracc. Hacienda el Cóbano. Aguascalientes, Ags., MEXICO, Z.C. 20158. Cell.: (449) 413-42-62 (618) 154-75-83 and Home: (618) 118-07-36 E-mail: [email protected] Birth Date: 09 / Feb. / 1966. Birth City: Durango, Dgo., MEXICO. Marital Status: Married, Two Children. ACADEMIC PREPARATION. TECHNOLOGICAL INSTITUTE OF DURANGO, MEXICO. MECHANICAL ENGINEER (1985-1989). WORK EXPERIENCE. MAQSA CAT S.A. DE C.V. (2011 – ACTUAL) (Renta y Venta de Maquinaria y Equipo Pesado) Durango, Dgo. 2011 - ACTUAL Ingeniero de Administración de Flotas, Rentas y Ventas. Actividades Principales. Preparation of lease agreements. Income Maintenance Agreements. Preparation of Contract, Note, Check Sheet and Shipment of Equipment Leased. Allocation and monitoring equipment for preventive and corrective maintenance. Coordination for New Machinery accommodation in Exhibitors. Programming Retirement and / or Delivery of Leased Equipment. Coordinating Team Return Income clinched once. Review and Assignment New Equipment for Pre-delivery. Monitoring Equipment life to set as Semi-new Application Equipment Rental Fleet replacement after reaching its life. Coordination of receipt and shipment of Equipment in exchange between branches. Confirming the Status of Equipment at Time of Your Shipment. Daily Confirmation Fleet Available for Rent. Preparation of Invoices Rental. Technical Application of Equipment Rental for Repair -1- CALSONIC KANSEI S.A. DE C.V. (1998–2011) (Auto Parts Manufacturing) Aguascalientes, Ags. a 2008 - 2013 Engineer New Projects in Process of EXHAUST SYSTEM, ECM Y METER. (EXH SYSTEM, Radiator, Air Conditioning, Speedometer and Fuel Pump). Main Activities . Planning, Coordination of Internal and Customer personnel involved in the implementation of a new project. Journal Monitoring the Implementation Plans for New Proyects. Coordinate Integration ANPQP documentation for processing of the Client PSW. Coordinate Activities Local Suppliers Liberation, both Domestic and Foreign Components and Machinery, Tooling and Equipment. Plan and Coordinate the Preparation of Initial Samples to Assess General Status Line (4 M). Coordinate Improvement Activities Online AFTER the Evaluation of the First Run International, (4M). Coordinate the visit the Client for the RELEASE of the New Process (Kick Off). Plan and coordinate the manufacturing, Liberation, Packing and Shipping Samples for Pilotajes First Customer (4M). Coordinate Liberation, Packing and Shipping the shipping FIRST Customer Material. Identify with Hatsumomo to facilitate FOLLOW and avoid mixing with Related Products. Report Send Time Customer, Invoice #, Name and # of Transport for the FIRST SHIPMENT. Coordinate activities of Maintenance, Quality and Manufacturing. Weekly Internal Meetings with Plant Management to Evaluate the Status of the Implementation and Development of New Projects. Plan, implement and coordinate the New Internal Auditing Process least 3 months after the Kick Off or Start. Plan, implement and coordinate activities QRQC (Continuous Improvement) based on results of the audits (Point Previous). Preparation of Annual Spending Plan and Investment Department. Economic Resources Management Department. (Annual Budget). 2004 - 2008 Head of Engineering Changes. Main Activities. Planning, Coordination Staff, departments, customers and suppliers involved in an engineering change. Monitoring the Plans Journal Adoption of Engineering Changes. Coordinate Integration ANPQP documentation for processing of the Client PSW. Preparation of Annual Spending Plan and Investment Department. Economic Resources Management Department. (Annual Budget). Plan and Coordinate the Preparation, Evaluation and Release of Initial Samples for the Adoption of Engineering Change Required. Process Audits Party Providers and / or components Plan and coordinate the manufacturing, Liberation, Packing and Shipping Samples for Pilotajes First Customer (4M). Coordinate Liberation FIRST Packing and Shipping of sending the Customer Material ENGINEERING CHANGE. Identify with Hatsumomo to facilitate FOLLOW and avoid mixing with Related Products. Notify the Customer Time Shipping, # Invoice and Transport for the FIRST SHIPMENT CONTAINING THE ENGINEERING CHANGE. Weekly Internal Meetings with Plant Management to Evaluate the Status of Implementation of Engineering Change. -2- CALSONIC KANSEI S.A. DE C.V. (1998–2011) (Auto Parts Manufacturing) Aguascalientes, Ags. 1998 - 2004 Process Engineer in the Departaments of ECM and EXHAUST SYSTEM (Radiator, Heater Core, Condenser and Exhaust System). Main Activities . a GRUPO INDUSTRIAL ARMAS S.A. de C.V (Autoparts Manufacturing) Durango, Dgo.,MEXICO Supervision and Upgrading of Production Lines. Preparation and Maintenance of ISO TS 16949 ANPQP Documentation (Control Plan, FMEA, Process Flow Diagram, LAY OUT etc..). Design Management (Administration, Interpretation of drawings and product standards and materials). Elaboration and evaluation with multidisciplinary team bench testing. Interpretation of drawings for modification and / or manufacture of tooling, devices, pokayokes, packing and processing standards document). Development of Standards of Quality Audits Providers processes, programming Dimensional Analysis to Final Product and Components. Release of parts and PSW first supplier. Preparing reports and Pokayokes Scantlings dimensional. Management of PSW documentation process with clients. Reports component samples, samples and final product. Development of Instructional Equipment Operation, Process Equipment and Laboratory. Development of Instructional Operating Machinery and Equipment. Development of Procedures Nonconforming Product Repair. Multidisciplinary Board QRQC daily (continuous improvement).). Internal Audit Processes and the Departments of Plant based Annual Audit Programme of TS 16949.. Internal Audit Processes and the Departments of Plant based Annual Audit Programme of ISO 14001 (ENVIRONMENTAL SYSTEM) Selection of Machinery and Tooling Process. Preparation and Monitoring Programs Preventive and Corrective Maintenance of facilities : Facilities: (Cooling Towers, Thermo and gasifiers N2, He and Ar, Pipes, Valves and Pressure Regulators).). Máchines: (Presses, Furnaces, Injection, Compression, Tube Bending, Welding Robots, Leak tester, Speedometer tester Digital and Analog). Tooling: (Dies, Presses Transfer Systems, automatic material feeder pattern alignment plates in 3 axes, injection molds, water coolers for molded parts, Pokayokes, etc.) Selection and Validation PARTY PROVIDERS (Domestic and Foreign Commercial) Parts and Components. Vendor Selection and Validation Tooling, Machinery, Equipment and Facilities, (Local, National and International) Process Audits Provider of Parts and Components. Maintain minimum and maximum control of spare parts and consumables for dies, presses, machinery and equipment.. Maintain min. and max. control of Auto Parts and consumables for injection molds. Coordinate activities of Maintenance, Quality and Manufacturing. Preparation of Annual Spending Plan and Investment Department. Economic Resources Management Department. (Annual Budget). 1994 – 1998 Head of Process Engineering. Main Activities. Supervision and Upgrading of Production Lines. Preparation and Maintenance of ISO TS 16949 ANPQP Documentation (Control Plan, FMEA, Process Flow Diagram, Process LAY OUT). Process Liberation (Kick Off). Development of Instructional Operating Machinery and Equipment. Plan and Coordinate the Preparation of Initial Samples to evaluate the General Status Line (4 M). Plan and Coordinate the Preparation of Initial Samples to Assess General Status Line (4 M). Coordinate Improvement Activities Online AFTER the Evaluation of the First Run International, (4M). Coordinate the visit the Client for the RELEASE of the New Process. -3- YORK INTERNATIONAL S.A. DE C.V (Manufacturing Equipment to Industrial Refrigeratión) Durango, Dgo., MEXICO NISSAN MEXICANA S.A. de C.V. (Vehicle Assembler). Aguascalientes, Ags.,MEXICO. 1993 - 1994 Staff Manufacturing Engineer. Activities Main. Process Documentation of ASME Code. Continuous Improvement, Lay Out, Preparation of monthly maintenance program. Scheduling Preventive and Corrective Maintenance of Baffles & Heads Die. Scheduling Preventive and Corrective Maintenance Dies Domestic Air line. Scheduling Preventive and Corrective Maintenance of Electric Welding Machines, TIG and MIG ASME Line (60 machines total). 1991 - 1993 Manufacturing Leader. Main Activities . Responsible for Vehicle Assembly Line in Section Mechanical Group.. Responsible for Sub-Assembly Line Vital Parts (REAR AXLE, LINE CHASSIS, FRONT AXLE). Developing PROCESS SHEETS. Training of operating personnel. Evaluation operational staff. QRQC (Continuous Improvement). Defect Product, analysis and countermeasures. CORE TOOLS. (Requirements Management System for Automotive Industry QUALITY / ISO TS 16949:2009 ). AMEF / FLOWCHART / SPECIAL FEATURES AND TREATMENT / PSW / CORRECTIVE ACTION (GRAPHIC, R & R, QRQC, 4M, 5W, etc. / RECORDS / INTERNAL AUDITS / TRAINING AND TRAINING (EVALUATION) / PROCESS SHEET (DEVELOPMENT AND CONTROL) / STANDARD PACKING (SNP) / FIRST TICKETS - FIRSTOUT PARTS AND COMPONENTS / FIRST TICKETS - FIRST-OUT OF WORK / NONCONFORMING PRODUCT AND ITS TREATMENT (REPAIR, SCRAP, SEGREGATION) / PRODUCT TRACING / MEASURING AND TESTING EQUIPMENT, MANUAL, LABORATORY AND MACHINES (Traceability) INTERNAL AUDITOR: MANAGEMENT SYSTEM QUALITY (ISO TS 16949:2009) / ENVIRONMENTAL SYSTEM (ISO 14001). ENGLISH LANGUAGE: 80% ORAL AND WRITTEN (Berlitz and HARMON HALL INSTITUTE). HABILITIES / SKILLS: leadership skills, communication skills, excellent ability to adapt to difficult situations (work under pressure), purposeful, persistent, committed, loyal, organized, available, purposeful, dynamic, teamwork, respectful. COMPUTER PACKAGES: WORD 2013, EXCEL 2013, POWER POINT 2013, MAIL, PRINTER, ESCANER. TRAINING: KANSEI, GUNMA PLANT. GUNMA JAPON. CALSONIC KANSEI, MICHIGAN. USA. MICHIGAN, USA. CALSONIC KANSEI TN. , TENNESSEE, USA. NISSAN OPPAMA PLANT. , OPPAMA, JAPON. NISSAN MEXICANA ¨CIVAC¨ PLANT., CUERNAVACA, MORELOS, MEX. ING. NOE CONTRERAS ORTEGA -4-
© Copyright 2025 ExpyDoc