Research and Design of ECO 9200TEU Container Ship

ECO- Container Ship
ECO
Research and Development
CIMC ORIC
CIMC and CIMC ORIC Brief Introduction
ECO Solutions
Ships
ECO
Solutionsfor
forContainer
Container
Ships
ECO- Container
Series
ECOContainerVessel
Vessel
Series
ECO- Container
Ship
p Research
and
Development
Group Company Profile
China International Marine Containers (Group) Ltd.
(CIMC), it was founded in January 1980 in Shenzhen of
China and has been listed in Shenzhen Stock Exchange
since 1994,the main shareholders are COSCO and China
Merchants With 30 years continual development,
Merchants.
development CIMC
Containers
Vehicles
has become the global leading enterprise in multi-
Energy,
Chemical and
Food
Equipment
industries based on China mainland. Now we possess
nine business units.
Offshore
Finance
Airport
Facilities
Real Estate
Logistics
Service
Railway
Equipment
Global Layout
200+
Companies
64000+
Employees
Operation Performance
Operatingrevenue
$12,000.00
10477.95
$10,000.00
Operating revenue of 2013
$8,000.00
USD 9337 m
$6,000.00
$4,000.00
3345.671
$2,000.00
Net profit of 2013
$0.00
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
Unit:USD1million
$700.00
Netprofit
$600.00
$
$500.00
$400.00
$300.00
$200.00
$100.00
$0.00
2003
2004
2005
2006
2007
2008
2009
2010
2011 2012 2013
Unit:USD1million
USD 354.7 m
CIMC ORIC
 CIMC ORIC is “NATIONAL ENERGY R&D CENTER (LABORATORY)
FOR MARINE PETROLEUM DRILLING UNIT”、“CIMC A CLASS
TECHNICAL CENTER”.
HIGH TECH ENTERPRISE
HIGH TECH ENTERPRISE ISO9001 2008 & ISO/IEC 27001 2005
ISO9001:2008 & ISO/IEC:27001:2005
DESIGN CONCEPT-SEE
安全
Safety
Safety
SEE
Series
经济
Economy
Economy
环保
Environmental
Environment
friendliness
DESIGN PROCESS
Concept
Design
Basic
D i
Design
Detail
Design
Service for the complete
design process
Production
Design
SERVICE MODE
Technical Service
Building Service
Financial Service
Supervision Service
O stop
One
t service
i can b
be supplied
li d ffor our customers.
t
C
C andd CIMC
C
CIMC
C ORIC
O
ORIC
CBrief
Brief
e Introduction
Introduction
oduc o
CIMC
ECO Solutions
S l ti
ffor C
Container
t i Ships
Shi
ECO- Container Ship Series
ECO- Container
Ship Research
and
Development
International S&T Cooperation Project
What does ECO mean?
ECO
ECO
ECO
Nomical
Logical
Friendly
The customer benefit maximization
Progress
Energy
Efficiency
Progress
Cost
Benefit
Progress
g
Trade
Performance
ECO solutions?
Hull lines optimization
Part load EGB
Dual fuel system
Energy saving device
ECO?
Ballast water treatment
Hazardous material, etc.
Optimized hull lines
Original
Hull Lines
CFD
Calculation
Final
Hull Lines
Model Test Service speed at 14.5m, NCR =42687kW can reach 22.0kn.
Energy saving device investigation
Twisted Rudder + Rudder Bulb
Properly Designed Propeller
Model Test
Service speed at 14.5m, NCR
=40438kW
40438kW can reachh 22.0kn.
22 0k
Energy saving efficiency of
the twisted rudder, rudder
b lb andd propeller
bulb
ll is
i about
b t
5.3%.
Sea Trial Result
Energy saving efficiency is about 5.1%.
5 1%
Excellent matching with model test result.
Operating Profile Optimization
Bulbous Bow Design
Model Test for Bulbous Bow
i6000
i7000
i8100
Fuel Oil Savings
10%
The average
g fuel oil consumption
p
savings
g for the
whole operating condition is over 10%.
Part Load EGB Implementation
Reduction of Fuel Oil Consumption
Power Turbine Generator -WHR
0 Ballast Design
Ballast Water Treatment System
30
35
40
45
50
55
60
65
70
75
80
85
90 92
Global Vibration Prediction
According to global
vibration prediction,
prediction vibration in the
accommodation area are less than 3.5 mm/s, in the working area are
less than 7mm/s, which can comply with the rules requirement.
Lower Vibration
(T t d iin sea ttrail)
(Tested
il)
Working
g Area
Rules<8mm/s
Actual<5mm/s
Accommodation Area
Rules 4mm/s
Rules<4mm/s
Actual<3mm/s
EEDI Value
The EEDI value for 9200TEU container vessel is 10.503,, which is
30% below the base line. And had been approved by BV class.
Dual Fuel Propulsion Design
LNG Propulsion system
Dual Fuel Engine
ME GI
ME-GI
W DF
W-DF
LNG Fuel Supply
pp y Unit
LNG Bunker Station
Options for Tier III
EGR System for NOx
SCR System for NOx
Scrubber System for SOx
ECO solutions
Ballast water
treatment
Twisted rudder
WHR
Rudder bulb
0 Ballast water
Part load EGB
Optimized hull lines
Optimized bulbous bow
High efficiency propeller
Dual fuel propulsion
SCR or EGR
Scrubber system
CIMC and CIMC ORIC Brief Introduction
ECO
S ll titi ffor
for
f C
Container
C t it i Ships
Shi
ECO Solutions
SSolutions
Container
ShiShips
ECO- Container Vessel Series
ECO- Container
ECO
Ship Research
and
Development
ECO- Container Vessel Series
1200TEU 2500TEU 9000TEU 18000TEU 19000TEU