i2000/i2000SR Module - Unpack GSS Home i System Service & Support Manual Revision Log i2000/i2000SR Module - Unpack Proprietary Info 1 General Data Purpose To describe the procedure to unpack the processing module Module i2000/i2000SR 2 Troubleshooting Materials Required Standard Tool Kit 1.0 hr Time 3 Parts Lists 4 Removal & Replaceme 5 Procedures . Action Steps 6 Planned Maintenance 7 Pre-Site Interview & Ins 8 Installation & Setup Remove Packing 1. Remove the packing sides and top. [1] Verify Packed Items 1. Remove the assorted parts kit, wrench, and ramp plate. [2] 2. Verify that all pieces are present. Remove Wood Strip 1. At the RAMP END location of the shipping platform, remove the two (2) screws affixing the strip of wood to the c8000 Checklist Unpack SCC - Hardware & C Install Accessories Processing Module P Installation of Pressu RSH Installation SCC - Software Insta RSH Calibration Robotic Positions Se RSH Verification P-159 PVT SCC Installation Veri Installation Documen i2000SR Checklist Unpack SCC - Hardware & C Processing Module P RSH Installation SCC - Software Insta RSH Calibration Processing Module C shipping platform. 2. Remove the strip of wood. [3] RSH Verification Processing Module V SCC Installation Veri Installation Documen ci8200 Checklist i2000 LAS Checklist i2000 SSH Checklist i4000 SSH Checklist Upgrade Relocation Remove Hold-Down Brackets http://gssweb.add.abbott.com/architect/3a_i2000sr_html/3a_start.htm[5/14/2014 9:48:54 AM] 1. At the RAMP END location, remove the retaining screws for the hold-down bracket. [4] 2. Remove the hold-down bracket by pushing the bracket toward the instrument until it stops, then sliding it right. [5] 3. Repeat Step1 and Step2 to remove the hold-down bracket on the opposite end of the shipping platform. [6] Reference i2000/i2000SR Module - Unpack Prepare to Affix Ramp Plate 1. At the shipping platform location opposite the RAMP END location, remove the three (3) nuts and washers securing 2. 3. 4. 5. http://gssweb.add.abbott.com/architect/3a_i2000sr_html/3a_start.htm[5/14/2014 9:48:54 AM] the shock absorbing feet. [7] Roll the instrument toward the STOP blocks until it stops. [8] Lock the instrument wheels in place. At the RAMP END location, remove the three (3) bolts and washers from the shock absorbing feet. [9] Remove the feet. [9] i2000/i2000SR Module - Unpack Affix Ramp Plate WARNING Before proceeding, verify that the instrument wheels are locked and the instrument is in the STOP location. Failure to do so could result in injury if the instrument moves toward the RAMP END while completing the next step. 1. Using two (2) bolts, nuts, and washers, affix the ramp plate to the instrument platform. Remove Instrument from Shipping Platform 1. Release the wheel locks and roll the instrument toward the RAMP END, and off of the shipping platform. Position Module 1. Move the processing module to the desired location. Perform SCC Hardware and Cable Installation 1. Perform SCC - Hardware and Cable Installation procedure. i System Service and Support Manual (Version 96661-109) • Copyright 2002, 2006 • ARCHITECT, i2000, i2000SR, ci8200, and c8000 are registered trademarks of Abbott Laboratories. i4000, i6000, i8000, and ARCHITECT ARM are trademarks of Abbott Laboratories. • Abbott Park, IL 60064 • All rights reserved. http://gssweb.add.abbott.com/architect/3a_i2000sr_html/3a_start.htm[5/14/2014 9:48:54 AM] i2000/i2000SR Module - Unpack http://gssweb.add.abbott.com/architect/3a_i2000sr_html/3a_start.htm[5/14/2014 9:48:54 AM]
© Copyright 2024 ExpyDoc