Powerful First-Class Boiler and Combustion Systems & Complete Engineering Services Topic: Utilisation of Biomass for Power Generation Speaker: Paul Widera ERK Eckrohrkessel GmbH (2012 ) 1 w w w .e c k ro h rk e s s e l.c o m Topic: Utilisation of Biomass for Power Generation Speaker: Paul Widera Today’s Agenda Today’s Agenda: 1. ERK EckRohrKessel GmbH? 2. Case study 1 – Biomass Gasification 3. Case study 2 – Refuse Utilisation 4. ip tube 5. Contact ERK Eckrohrkessel GmbH (2012 ) 2 w w w .e c k ro h rk e s s e l.c o m Topic: Utilisation of Biomass for Power Generation Speaker: Paul Widera 1. ERK EckRohrKessel GmbH? ERK - Founded on Tradition 2001 Acquistion of La Mont-Kessel and ERK EckRohrKessel by Prof. Dr.-Ing. Udo Hellwig 1977 Founding of ERK Eckrohrkessel GmbH 1944 Development Eckrohr boiler First reference Eckrohr boiler 1929 Founding of La Mont-Herpen First reference La Mont boiler ERK Eckrohrkessel GmbH (2012 ) 3 w w w .e c k ro h rk e s s e l.c o m Topic: Utilisation of Biomass for Power Generation Speaker: Paul Widera 1. ERK EckRohrKessel GmbH? ERK’s global reach 32 Licensees all over the World ERK transfers know-how and grants licences to plant manufacturers and engineering companies. The technological support within the scope of the licence and know-how contract enables licensees to manufacture state-of-the-art corner tube boilers and combustion systems that have proven themselves in operation. ERK Eckrohrkessel GmbH (2012 ) 4 w w w .e c k ro h rk e s s e l.c o m Topic: Utilisation of Biomass for Power Generation Speaker: Paul Widera 1. ERK EckRohrKessel GmbH? ERK’s References at a glance Fuel References Oil/gas 3,725 Steam rating from 0,2 to 290 t/h Coal/coke/peat 651 Steam pressure from 8 to 141 bar Waste arisings 603 Steam temperature to 540 °C Hot water boiler to 175 MW Thermal oil heater to 28 MW Waste heat 31 Biomass 341 Other 266 Total: ERK Eckrohrkessel GmbH (2012 ) 5 5,825 w w w .e c k ro h rk e s s e l.c o m Topic: Utilisation of Biomass for Power Generation Speaker: Paul Widera 2. Case study 1 – Biomass Gasification ERK’s Biomass Gasifcation • >100 references for biomass gasification plants (1-70 MWth) • • Simple scale-up to 40 MWel >40 MWel plants possible, but unusual for biomass; gasifier adaptation necessary MWth ERK Eckrohrkessel GmbH 5 (2012 ) 25 6 40 70 130 w w w .e c k ro h rk e s s e l.c o m Topic: Utilisation of Biomass for Power Generation Speaker: Paul Widera 2. Case study 1 – Biomass Gasification ERK’s Biomass Gasifcation Capacity 40 t/h Results of prior gasification: Pressure 44 bar • Alkaline condensation (Na, K) Steam temperature 430°C • No ash in the flue gas section Combustion system Gasifier & torsional chamber • Higher plant efficiency Fuel Biomass (Wheat Straw) • Reduced maintenance ERK Eckrohrkessel GmbH (2012 ) 7 w w w .e c k ro h rk e s s e l.c o m Topic: Utilisation of Biomass for Power Generation Speaker: Paul Widera 2. Case study 2 – Refuse Utilisation ERK’s Refuse Utilisation Capacity 20 t/h Results of the ERK boiler: Pressure 49 bar • Less fouling on HE tubes Steam temperature 400°C • Simple cleaning Combustion system Reciprocating grate • Higher plant efficiency Fuel Municipal waste • Reduced maintenance ERK Eckrohrkessel GmbH (2012 ) 8 w w w .e c k ro h rk e s s e l.c o m Topic: Utilisation of Biomass for Power Generation Speaker: Paul Widera 4. ip tube ip tupe – An example of R&D by ERK Main Characteristics: Increase of heat transfer Increase of heat transfer efficiency Reduction of the fouling (inside/outside) Advantages Material saving &costs reduction Foot print reduction Operating costs reduction Environment pollution reduction ERK Eckrohrkessel GmbH (2012 ) 9 Heat transfer Macro structure increases the α value inside on the tube side and on the shell side Macro structure increases α by factor 1,5 to 4,5 depending on the macro structure Several structures are already well proven Over 150 projects with ip tubes are already realized w w w .e c k ro h rk e s s e l.c o m Topic: Utilisation of Biomass for Power Generation Speaker: Paul Widera 5. Contact Thank you very much for your attention! Prof. Dr.-Ing. Udo Hellwig p: +49 30 8977 4621 e: [email protected] Paul Widera (M.A.; M. Eng.) p: +49 30 897746-0 e: [email protected] Address: Am Treptower Park 28-30 Schuckert-Höfe, Haus A 12435 Berlin Germany ERK Eckrohrkessel GmbH (2012 ) 10 w w w .e c k ro h rk e s s e l.c o m
© Copyright 2024 ExpyDoc