Horizon 2020

EU-frågor, ekonomi-administrativ inriktning, vid LiU:s
institutioner
30 januari 2014 Mårten Rosander
Financial Coordinator
Grants Office
Grants Office Supporting Researchers
at LiU! (3 heltid)
Johan Åkerman
Linda Forssén (50% Maternity
leave)
Coordinator. Coordinates the follow up on
Johan Åkerman, Head of Unit
LiU:s participation in FP7. Responsible for
Research Coordinator. EUs Framework Programme,
mainly towards the Faculty of Arts and Sciences and the Faculty of the homepage and information about calls
Coordinates seminars and events at Grants
Educational Sciences. Expert on the FP7 jurisdiction.
Office. Contact for Research Professional.
Per Dannetun
Mårten Rosander
Research Director. National Research
Coordinator. Rapporteur at Vice-Chancellors
Council for Research and at the Council for
Research Infrastructure.
Financial Coordinator. Support with budget
and revision of research projects. Support
with contract negotiations. Support
concerning form templates.
Bohdan Sklepkovych
leave) Research Coordinator. EUs
Framework Programme, mainly towards th
Faculty of Health Sciences..
Science writer. Strategic project/grant
development for H2020 (ERC), national and
international programmes.
Svjetlana Stekovic
Research Coordinator. EUs Framework
Programme, mainly towards the Institute of
Technology and the Faculty of Health Sciences.EU FP7 Project
Sara Strömberg (50% Maternity
Michael Lögdlund
Research Coordinator. National Research
Coordinator, EUs Framework Programme.
Mainly towards the Institute of Technology
Management
2
Nytt i hos på LiU/GO 2020
• Grants Office Nya hemsida med
Horizon 2020 handbok
• http://www.liu.se/go
• LKP nu 51,25 % (2014), ifall någon
missat det?
3
4
LiU-id required
5
Nytt hem i Key huset
6
LiU slutade på 123 beviljade projekt
inom FP7!
7
Max Lifecycle of an EU project
(Horizon 2020)
Pre-Award
Draft
Proposal
5 Months
From Call to
Deadline
3-4 Months
8-9 Months!
Budget
Evaluation
Post-Award
Grant Preparation
(Application stands)
9 Months
GPF
GA
CA (Nu även i
vissa MSCA)
(Budget)
Time Available to Write Proposals
Project
Duration
Max 60 Months
Possible
EC Audit
24 Months
2-4 Financial
and Scientific
reports
FP7 CFS
CFS Audit
Audit>=375 k€
>=325 k€
FP7>=375 k€
Total Maximum Lifecycle is 104 months (≈8,5 years)!
Without EC audit the total max lifecycles is 78 months (6.58 yea
Juristenheten
• Elisabet Permvall
• Maria Skoglund
• [email protected]
9
Upphandlingsenheten
• Rut Jonsson
• Öhrlings PricewaterhouseCoopers AB
(Linköpingskontoret)
 Revisionstjänster för forskningsprojekt
finansierade av svenska och EU finansiärer
• Öhrlings PricewaterhouseCoopers AB
(Stockholmskontoret)
Revisionstjänster för forskningsprojekt
finansierade av amerikanska finansiärer
1
0
Revisor för forskningsprojekt
• Öhrlings PricewaterhouseCoopers AB
(Linköpingskontoret)
• Eva Myrén
1
1
12
Horizon 2020
Top Priorities
Excellence in the Science Base
Frontier research (ERC)
Future and Emerging Technologies (FET)
Skills, training and career development
(Marie Sklodowska Curie Actions)
Research infrastructure
•
•
•
•
•
•
•
•
•
•
Tackling Societal Challenges
Health, demographics changes and wellbeing
Food security and sustainable bio-resources
Secure, clean and efficient energy
Smart, green and integrated transport
Resource efficiency and climate challenge
Secure, innovative and inclusive societies
•
•
•
Creating Industrial Leadership and
Competitive Frameworks
Leadership in enabling technologies

ICT, nanotechnology, advanced
materials, advanced
manufacturing and processing,
biotechnology, space
Access to risk finance
Innovation in SMEs
Common rules, toolkit and funding
schemes
Simplified access
1
2
Financial News in Horizon 2020
• CFS*: ”only for payment at the balance (final
payments), when total EU contribution claimed
by the beneficiary on the basis of actual costs >
325 000 €“
• Only Actual cost (and unit cost) counts= 406
250 € according to the old rules
• This means only one audit certificate per Grant
• CFS is a DIRECT COST and not subcontracting in
Horizon 2020
• In principle all subcontacting is a direct cost=
we get indirect cost (25 %) on those too.
• Audit Rules for FP7 remains at 375 k€ or more
for each period.
• 25 % coverage for indirect costs
*CFS=Certificate of Financial
Statement=Revisionsintyg
1
3
News in Horizon 2020
• Exchange rate is euro at the
average of the daily exchange
rates published on the
European Central Bank website,
calculated over the
corresponding reporting period.
• http://www.ecb.europa.eu/stat
s/exchange/eurofxref/html/euro
fxref-graph-sek.en.html
1
4
News in Horizon 2020
• 1720<90% hours is always allowed
to be used as productive hours
• Maximum time for an EC Ex Post
Audit is up to 2 years after the
payment of the balance
• No more negotiations: each
proposal evaluated 'as it is', not as
'what could be';
• No more paper: e-communication &
e-signature of grants.
1
5
Application/Budget
• RTD (Research and Technical
Development) is now R&I (Research
and Innovation)
• Types of actions:
• Research and Innovation Actions (100 %)
• Innovation actions (100/70 %) (produce
plans & arrangements or designs for new,
altered or improved products, processes
or services)
• Coordination and support actions (100 %)
• MSCA (Marie Sklodowska Curie) (Unit
Cost)
• ERC (100 %)
1
6
Application
• Place to find your calls, apply
and report
Participant portal
• http://ec.europa.eu/research/participants/
portal/desktop/en/home.html
1
7
1
8
1
9
2
0
2
1
SUMMARY Reporting
•
FSIGN for all grants signed after 1 January 2013,
amendment or paper for those prior to that date.
•
Average exchange rate
•
CFS*: ”only for payment at the balance (final
payments), when total EU contribution claimed by the
beneficiary on the basis of actual costs > 325 000 € “
2
2
Financial Statement Authorised
Signatory (FSIGN)
•
For grants signed after 1 January 2013 otherwise the
current process of parallel electronic submission and
paper signature will still be available.
•
Organisations have to identify online the persons
authorised to sign forms C
•
The nomination of a LEAR for each participating
organisation becomes thus mandatory. LEARs can
register an unlimited number of FSIGNs for their
organisation, can add comments to each name and can
revoke or replace them at any time.
•
The link between a particular FSIGN (from the list you
have encoded) and a specific project will be made by
one of the Participant Contacts (PaCo) (or Coordinator
Contacts for the coordinating organisation) of the
respective project.
•
When a Form C is ready for submission a notification
will be sent to the FSIGN
2
3
Budget in PP
Usaully doesn’t apply at
LiU!
Budget PART A
Only Totals in Part A
Auto calculated at 25 % of
your Total Eligible costs!
2
4
CFS
•
•
•
•
Öhrlings PricewaterhouseCoopers AB
Org.nr: 556029-6740
Tel.nr: 010-212 40 00
E-post: [email protected]
• Kontaktperson
•
•
•
•
•
•
Eva Myrén
PwC
581 02 Linköping
Tel. 010-212 95 39
E-post: [email protected]
Ca 3 500 € per revision i budget