Copy of EWG scores for handout v6.xlsx

East West Gateway
Workshop Two - 5/21/14
MoDOT Sales Tax Candidate Project List
Breakout #1 - Regional Priority: Medium
ID
Location
Route
H7
St. Louis
Route D
H8
St. Louis City
I-44
H9
St. Louis
Airport
Access
H10 St. Louis City
Replace signalized intersections with
grade-separated crossings from I-270 to
US 67
Interchange modifications at the I-55
interchange
Consolidate and improve airport access Banshee Rd./Scudder/I170/Airport/McDonnell
Corridor improvements from I-270 to
Hall Street
Corridor improvements from Long Road
to MO 141
Est. 2019
cost
(millions $)
Regional
Priority
Range
$105
Med
$87
Med
$14
Med
$15
Med
$105
Med
H11
St. Louis
I-64
H12
St. Louis
I-270
Interchange improvements at MO 364
$17
Med
H13
St. Louis
I-44
Corridor improvements from MO 141 to
US 67
$170
Med
H14
St. Louis
$185
Med
$24
Med
$200
Med
$90
Med
$5
Med
$1
Med
$140
Med
$93
Med
$66
Med
$36
Med
$1
Med
$41
Med
$104
Med
H15 St. Louis City
Highways
Route H
Project
Corridor improvements at
Manchester
Baxter/Sulphur Spring Road, Brentwood
Rd (Rte.100)
Blvd, Big Bend Blvd, Hanley Rd
Route H /
Hall St
H16
St. Charles
MO 94
H17
St. Charles
I-70
H18 St. Louis City
Branch St
H19
St. Louis
Lindbergh
tunnel
H20
St. Louis
H21
St. Charles
H22
St. Charles
H23
St. Louis
H24
Jefferson
H25
St. Louis
H26
Jefferson
Improvements from East Grand to
Riverview Drive to eliminate flooding
Upgrade to an expressway from I-70 to
Route 364
Corridor improvements from Route T/W
to I-64
Improvements from I-70 to Mississippi
River levee, including sidewalks and
bike lanes
Upgrade IT systems
Interchange improvements at
Shrewsbury
Corridor improvements from I-64 to
US 61
Lincoln County
Systematic safety improvements
F, T, TT, W,
including adding shoulders, widening
H, J, C, B, Y,
lanes, correcting curves, adding
V
guardrail, etc.
Corridor improvements from MO 100 to II-270
64
Corridor improvements from Route 21 to
Astra Way, including at Ridgewood
MO 141
Middle School Drive and Old Missouri
State Road
Laclede
Corridor improvements, including
Station
accommodating bicycles and
corridor
pedestrians
Corridor improvements from Route Z to
I-55
US 67
I-44
East West Gateway
Workshop Two - 5/21/14
MoDOT Sales Tax Candidate Project List
Breakout #1 - Regional Priority: Medium
ID
Location
St. Louis
St. Louis City
St. Louis
T9
St. Louis City
St. Louis
St. Louis City
T10
Franklin
Jefferson
St. Charles
St. Louis
St. Louis City
T11
Franklin
Jefferson
St. Charles
St. Louis
T12
St. Louis City
Route
Transit
St. Louis
St. Louis City
St. Louis
St. Louis City
St. Louis
T15
St. Louis City
T14
Est. 2019
cost
(millions $)
New buses and vans for MetroBus and
$17 annually
Call-A-Ride
Implement traffic signal priority (TSP) for
$2
buses and emergency vehicles
T8
T13
Project
I-55
64
T16 St. Louis City
Regional
Priority
Range
Med
Med
Supplement funding shortfall for the
Transportation for Elderly Persons and
Persons with Disabilities Program
(Section 5310 - paratransit)
$3
Med
Provide operating funds to supplement
the Missouri Elderly and Handicapped
Transportation Assistance Program
(MEHTAP)
$5
Med
$23
Annually
Med
$5 annually
Med
$23
Med
$40
Med
$290
Med
Provide operating funds to support
additional Metro transit services
Address service needs including
additional frequency and span of
service in underserved markets
Build enhanced express bus
infrastructure
Build bus rapid transit (BRT) route on I64, Chesterfield to Downtown
Central corridor streetcar: Central West
End to Downtown
T17 St. Louis City
Construct a Northside - Florissant Valley
MetroLink extension
$1,050
Med
St. Louis
St. Louis City
Construct the Southside - South County
MetroLink extension
$1,150
Med
?
Med
$23
Med
T18
St. Louis
St. Louis City
St. Louis
T20
St. Louis City
T19
I-44
High Speed Rail from St. Louis to
Chicago
Build enhanced express bus
infrastructure
East West Gateway
Workshop Two - 5/21/14
MoDOT Sales Tax Candidate Project List
Breakout #1 - Regional Priority: Medium
Bike/Ped
ID
Location
B4
St. Louis
St. Louis City
B5
St. Louis City
B6
St. Louis City
B7
St. Louis City
B8
St. Louis City
B9
St. Louis City
Route
Project
Chouteau Avenue to Lyons Park Trail,
Lyons Park to Sugarloaf Mounds Trail,
Sugarloaf to Bellerive Park Trail,
Mississippi
Bellerive Park to River des Peres Trail,
River
Jefferson Barracks Park to Sylvan
Greenway
Springs Trail, Sylvan Springs to Cliff
Cave Park Trail, Cliff Cave to Bee Tree
Park Trail
Grand
Center /
Theresa to Sheldon Concert Hall
Washington
Ave
Improvements including road diet and
Tucker Blvd. median enhancement from Washington
to Chouteau
Sidewalk Improvements along city
City arterials
arterials, including ADA compliance
7th and 8th
Complete from Pine to Spruce
Street
Clark St
8th to Broadway
B10 St. Louis City Vandeventer Forest Park Parkway to I-44
Est. 2019
cost
(millions $)
Regional
Priority
Range
$35
Med
$2
Med
$8
Med
$12
Med
$5
Med
$5
Med
$20
Med
B11 St. Louis City
Natural
Bridge
Kingshighway to Grand
$6
Med
B12 St. Louis City
MLK
Grand to Kingshighway
$6
Med
$3
Med
$9
Med
$35
Med
$7
Med
$6
Med
$6
Med
B13 St. Louis City Goodfellow I-70 to Natural Bridge Road
B14 St. Louis City
Laclede's
Landing
Improvements including traversable
streets, ADA compliant sidewalks, park
enhancements & pedestrian
connections under MLK Bridge, 1st St.,
2nd St., Morgan and Laclede's Landing
Blvd.
Centennial
Delmar to Creve Coeur Park Trail
Greenway
Chouteau
B16 St. Louis City
Midtown Trail Loop
Greenway
Old Chain of
St. Louis City
B17
Rocks
Bridge Restoration
/ IL
Bridge
B15 St. Louis City
B18 St. Louis City
N. Grand
I-70 to Natural Bridge Road
East West Gateway
Workshop Two - 5/21/14
MoDOT Sales Tax Candidate Project List
Breakout #1 - Regional Priority: Medium
ID
Location
Route
Bike/Ped
St. Louis
B21
St. Louis
B22 St. Louis City
B23
St. Louis
B24 St. Louis City
B25
St. Louis
B26
St. Louis
B27
St. Louis
B28
St. Louis
St. Louis City
B29 St. Louis City
Multimodal
B30
St. Louis
$3
Med
$2
Med
$2
Med
$3
Med
$4
Med
$17
Med
$14
Med
$8
Med
$7
Med
$29
Med
$10
Med
Add paved shoulders
$8
Med
Municipal River Terminal N Dock
consolidated improvements
$12
Med
Construct new track from N. Market to
Biddle St. to better accommodate MO
River Runner trains
$8
Med
Rehabilitate runways at St. Charles
County SMARTT airport
$2
Med
Laclede
Station
corridor
Provide access to the South County,
Shrewsbury Crestwood and Affton
areas in Maplewood
Add bike shoulders, improve and add
New Ballwin
sidewalks and extend pedestrian lights
/ Dougherty
between New Ballwin Road and
Ferry
Kirkwood
Add bikeway from St. Louis City Limit to
Gravois
Washington Ave.
Ladue /
Add paved shoulders
Clayton
Confluence
North Riverfront Phase II
Greenway
BridgeRoute 66 Bridge Restoration
Route 66
Connector O'Fallon and Fairgrounds Parks to
Trail
Riverfront Trail
Connector
Etzel to St. Vincent County Park Trail
Trail
Maline
UMSL to Riverfront Trail
Greenway
River des
Forest Park to Francis Slay Park Trail
Peres
Lansdowne Trail
Greenway
Clayton
M2 St. Louis City
Waterways
M3 St. Louis City
Rail
M4 St. Charles
Regional
Priority
Range
Chouteau greenway, Cerre St under EB
I-64 ramps/vehicular traffic lanes and a
cycle track on south side, bike/ped
bridge through I-64/70/44 interchanges
from Cerre to Arch grounds, Citygarden
connection along 10th from Greenway
to Market
B19 St. Louis City
B20
Est. 2019
cost
(millions $)
Project
Aviation