East West Gateway Workshop Two - 5/21/14 MoDOT Sales Tax Candidate Project List Breakout #1 - Regional Priority: Medium ID Location Route H7 St. Louis Route D H8 St. Louis City I-44 H9 St. Louis Airport Access H10 St. Louis City Replace signalized intersections with grade-separated crossings from I-270 to US 67 Interchange modifications at the I-55 interchange Consolidate and improve airport access Banshee Rd./Scudder/I170/Airport/McDonnell Corridor improvements from I-270 to Hall Street Corridor improvements from Long Road to MO 141 Est. 2019 cost (millions $) Regional Priority Range $105 Med $87 Med $14 Med $15 Med $105 Med H11 St. Louis I-64 H12 St. Louis I-270 Interchange improvements at MO 364 $17 Med H13 St. Louis I-44 Corridor improvements from MO 141 to US 67 $170 Med H14 St. Louis $185 Med $24 Med $200 Med $90 Med $5 Med $1 Med $140 Med $93 Med $66 Med $36 Med $1 Med $41 Med $104 Med H15 St. Louis City Highways Route H Project Corridor improvements at Manchester Baxter/Sulphur Spring Road, Brentwood Rd (Rte.100) Blvd, Big Bend Blvd, Hanley Rd Route H / Hall St H16 St. Charles MO 94 H17 St. Charles I-70 H18 St. Louis City Branch St H19 St. Louis Lindbergh tunnel H20 St. Louis H21 St. Charles H22 St. Charles H23 St. Louis H24 Jefferson H25 St. Louis H26 Jefferson Improvements from East Grand to Riverview Drive to eliminate flooding Upgrade to an expressway from I-70 to Route 364 Corridor improvements from Route T/W to I-64 Improvements from I-70 to Mississippi River levee, including sidewalks and bike lanes Upgrade IT systems Interchange improvements at Shrewsbury Corridor improvements from I-64 to US 61 Lincoln County Systematic safety improvements F, T, TT, W, including adding shoulders, widening H, J, C, B, Y, lanes, correcting curves, adding V guardrail, etc. Corridor improvements from MO 100 to II-270 64 Corridor improvements from Route 21 to Astra Way, including at Ridgewood MO 141 Middle School Drive and Old Missouri State Road Laclede Corridor improvements, including Station accommodating bicycles and corridor pedestrians Corridor improvements from Route Z to I-55 US 67 I-44 East West Gateway Workshop Two - 5/21/14 MoDOT Sales Tax Candidate Project List Breakout #1 - Regional Priority: Medium ID Location St. Louis St. Louis City St. Louis T9 St. Louis City St. Louis St. Louis City T10 Franklin Jefferson St. Charles St. Louis St. Louis City T11 Franklin Jefferson St. Charles St. Louis T12 St. Louis City Route Transit St. Louis St. Louis City St. Louis St. Louis City St. Louis T15 St. Louis City T14 Est. 2019 cost (millions $) New buses and vans for MetroBus and $17 annually Call-A-Ride Implement traffic signal priority (TSP) for $2 buses and emergency vehicles T8 T13 Project I-55 64 T16 St. Louis City Regional Priority Range Med Med Supplement funding shortfall for the Transportation for Elderly Persons and Persons with Disabilities Program (Section 5310 - paratransit) $3 Med Provide operating funds to supplement the Missouri Elderly and Handicapped Transportation Assistance Program (MEHTAP) $5 Med $23 Annually Med $5 annually Med $23 Med $40 Med $290 Med Provide operating funds to support additional Metro transit services Address service needs including additional frequency and span of service in underserved markets Build enhanced express bus infrastructure Build bus rapid transit (BRT) route on I64, Chesterfield to Downtown Central corridor streetcar: Central West End to Downtown T17 St. Louis City Construct a Northside - Florissant Valley MetroLink extension $1,050 Med St. Louis St. Louis City Construct the Southside - South County MetroLink extension $1,150 Med ? Med $23 Med T18 St. Louis St. Louis City St. Louis T20 St. Louis City T19 I-44 High Speed Rail from St. Louis to Chicago Build enhanced express bus infrastructure East West Gateway Workshop Two - 5/21/14 MoDOT Sales Tax Candidate Project List Breakout #1 - Regional Priority: Medium Bike/Ped ID Location B4 St. Louis St. Louis City B5 St. Louis City B6 St. Louis City B7 St. Louis City B8 St. Louis City B9 St. Louis City Route Project Chouteau Avenue to Lyons Park Trail, Lyons Park to Sugarloaf Mounds Trail, Sugarloaf to Bellerive Park Trail, Mississippi Bellerive Park to River des Peres Trail, River Jefferson Barracks Park to Sylvan Greenway Springs Trail, Sylvan Springs to Cliff Cave Park Trail, Cliff Cave to Bee Tree Park Trail Grand Center / Theresa to Sheldon Concert Hall Washington Ave Improvements including road diet and Tucker Blvd. median enhancement from Washington to Chouteau Sidewalk Improvements along city City arterials arterials, including ADA compliance 7th and 8th Complete from Pine to Spruce Street Clark St 8th to Broadway B10 St. Louis City Vandeventer Forest Park Parkway to I-44 Est. 2019 cost (millions $) Regional Priority Range $35 Med $2 Med $8 Med $12 Med $5 Med $5 Med $20 Med B11 St. Louis City Natural Bridge Kingshighway to Grand $6 Med B12 St. Louis City MLK Grand to Kingshighway $6 Med $3 Med $9 Med $35 Med $7 Med $6 Med $6 Med B13 St. Louis City Goodfellow I-70 to Natural Bridge Road B14 St. Louis City Laclede's Landing Improvements including traversable streets, ADA compliant sidewalks, park enhancements & pedestrian connections under MLK Bridge, 1st St., 2nd St., Morgan and Laclede's Landing Blvd. Centennial Delmar to Creve Coeur Park Trail Greenway Chouteau B16 St. Louis City Midtown Trail Loop Greenway Old Chain of St. Louis City B17 Rocks Bridge Restoration / IL Bridge B15 St. Louis City B18 St. Louis City N. Grand I-70 to Natural Bridge Road East West Gateway Workshop Two - 5/21/14 MoDOT Sales Tax Candidate Project List Breakout #1 - Regional Priority: Medium ID Location Route Bike/Ped St. Louis B21 St. Louis B22 St. Louis City B23 St. Louis B24 St. Louis City B25 St. Louis B26 St. Louis B27 St. Louis B28 St. Louis St. Louis City B29 St. Louis City Multimodal B30 St. Louis $3 Med $2 Med $2 Med $3 Med $4 Med $17 Med $14 Med $8 Med $7 Med $29 Med $10 Med Add paved shoulders $8 Med Municipal River Terminal N Dock consolidated improvements $12 Med Construct new track from N. Market to Biddle St. to better accommodate MO River Runner trains $8 Med Rehabilitate runways at St. Charles County SMARTT airport $2 Med Laclede Station corridor Provide access to the South County, Shrewsbury Crestwood and Affton areas in Maplewood Add bike shoulders, improve and add New Ballwin sidewalks and extend pedestrian lights / Dougherty between New Ballwin Road and Ferry Kirkwood Add bikeway from St. Louis City Limit to Gravois Washington Ave. Ladue / Add paved shoulders Clayton Confluence North Riverfront Phase II Greenway BridgeRoute 66 Bridge Restoration Route 66 Connector O'Fallon and Fairgrounds Parks to Trail Riverfront Trail Connector Etzel to St. Vincent County Park Trail Trail Maline UMSL to Riverfront Trail Greenway River des Forest Park to Francis Slay Park Trail Peres Lansdowne Trail Greenway Clayton M2 St. Louis City Waterways M3 St. Louis City Rail M4 St. Charles Regional Priority Range Chouteau greenway, Cerre St under EB I-64 ramps/vehicular traffic lanes and a cycle track on south side, bike/ped bridge through I-64/70/44 interchanges from Cerre to Arch grounds, Citygarden connection along 10th from Greenway to Market B19 St. Louis City B20 Est. 2019 cost (millions $) Project Aviation
© Copyright 2024 ExpyDoc