Deutsche Akkreditierungsstelle GmbH Annex to the

Deutsche Akkreditierungsstelle GmbH
Annex to the Accreditation Certificate D-PL-19065-01-00
according to ISO/IEC 17025:2005
Period of validity: 2015-01-05 to 2018-08-28
Date of issue: 2015-01-05
Holder of certificate:
TÜV SÜD Certification and Testing (China) Co., Ltd.
Guangzhou Branch, 5F, Communication Bldg.,163 Pingyun Road, Huangpu West Ave.
GUANGZHOU CITY 510656, P. R. CHINA
Tests in the fields:
Electrical Safety, Photovoltaic Inverters and Wind Converters
1
Technical Area
Standard / inhouse procedures
/ version
Title of the Standard or the in-house methods
(resp. Information about deviations /
modifications from the standard procedures)
Testing / restrictions
Product safety
IEC 62109-1:2010
Safety of power converters for use in
photovoltaic power systems - Part 1: General
requirements
Limitations:
Dust chamber for testing
ingress protection according
to clause 6.3; UV-exposure
test equipment according to
clause 6.4 respectively clause
13.6.4; Testing of coatings
according to clause
7.3.7.8.4.2 and IEC 60664-3;
Insulation requirements for
frequencies above 30 kHz
according to clause 7.3.7.9
and IEC 60664-4; Partial
discharge test according to
clause 7.5.3; Sound pressure
level measurement according
to clause 10.2.1.
EN 62109-1:2010
DIN EN 621091:2011
Product safety
IEC 62109-2:2011
EN 62109-2:2011
DIN EN 621092:2012
1
Safety of power converter for use in photovoltaic Limitations:
power systems
See part 1
Part 2: Particular requirements for inverters
In case of in-house methods the title and the equipment under test has to be declared
1/6
Annex to the accreditation certificate D-PL-19065-01-00
Technical Area
Standard / inhouse procedures
/ version
Product safety
IEC 62040-1:2008 + Uninterruptible power systems (UPS) – Part 1:
A1:2013
General and safety requirements for UPS.
1
Title of the Standard or the in-house methods
(resp. Information about deviations /
modifications from the standard procedures)
EN 62040-1:2008 +
A1:2013
AS 62040.1.1 2003
(R2013)
Testing / restrictions
Limitations:
a) Maximum power 30 kW (3
phase).
b) No short-time withstand
current test according to
clause 5.5.4 and Annex P.
c) No test with respect to
connection to telecom
networks according to clause
9.
d) No test with respect to
solid-state backfeed
protection according to
Annex I.5.
e) No test of hydrogen gas
concentration according to
Annex M.2.
Product safety
IEC 60335-2Household and similar electrical appliances – Limitation:
29:2002 + A1:2004 Safety – Particular requirements for battery No test of battery chargers
+ A2:2009
chargers.
for use by children according
AS/NZS
Limitation (see deviation report, enclosure 4.4): to Annex AA.
60335.2.29:2004 + No test of battery chargers for use by children
A1:2004 + A2: 2010 according to Annex AA.
Product safety
AS/NZS 4763:2011 Safety of portable inverters.
Limitation:
No testing of coated printed
circuit boards according to
Annex E.
Product safety
AS/NZS 3100:2009 Approval and test specification – General
+A1:2010
requirements for electrical equipment.
Period of validity: 2015-01-05 to 2018-08-28
Date of issue: 2015-01-05
2/6
Annex to the accreditation certificate D-PL-19065-01-00
1
Technical Area
Standard / inhouse procedures
/ version
Title of the Standard or the in-house methods
(resp. Information about deviations /
modifications from the standard procedures)
Testing / restrictions
Product safety
IEC 62477-1:2012
EN 62477-1:2012
DIN EN 624771:2012
Safety requirements for power electronic
converter systems and equipment – Part 1:
General.
Limitations:
Product safety
UL 1741:2010
Inverters, Converters, Controllers and
Interconnection System Equipment for Use
With Distributed Energy Resources.
Grid connection
DIN V VDE V 0126- Automatic disconnection device between a
1-1:2006 + A1:2012 generator and the public low-voltage grid
Testing of coatings according
to clause 4.4.7.8.4.2 and
IEC 60664-3; Insulation
requirements for frequencies
above 30 kHz according to
clause 4.4.7.11 and
IEC 60664-4; Sonic pressure
and sound level
measurement according to
clause 4.10.2; Dust chamber
for testing ingress protection
according to clause 5.2.2.3;
Partial discharge test
according to clause 5.2.3.5;
High current arcing ignition
test according to clause
5.2.5.2; Test of cemented
joints according to clause
5.2.5.7 and IEC 60664-3;
Vibration test according to
clause 5.2.6.4; Dust and sand
test according to clause
5.2.6.6.
DIN VDE V 0126-11:2013
Grid connection
E DIN VDE V 01261-1:2012-09
Automatic disconnection device between a
generator and the public low-voltage grid
Grid connection
VDE-AR-N 4105:
2011
Power generation systems connected to the lowvoltage distribution network
Technical minimum requirements for the
connection to and parallel operation with lowvoltage distribution networks
Grid connection
DIN V VDE V 0124- Grid integration of generator plants 100:2012
Generator units Test requirements for generation units to be
connected and operated parallel with the lowvoltage distribution networks
Period of validity: 2015-01-05 to 2018-08-28
Date of issue: 2015-01-05
3/6
Annex to the accreditation certificate D-PL-19065-01-00
1
Technical Area
Standard / inhouse procedures
/ version
Title of the Standard or the in-house methods
(resp. Information about deviations /
modifications from the standard procedures)
Grid connection
IEC 62116:2008
Test procedure of islanding prevention measures
for utility-interconnected photovoltaic inverters
IEC 62116:2014
Testing / restrictions
EN 62116:2011
DIN EN 62116:2012
Grid connection
IEC 61727:2004
Photovoltaic (PV) systems Characteristics of the utility interface
Grid connection
AS 4777.2:2005
Grid connection of energy systems via inverters,
part 2: Inverter requirements
Grid connection
AS 4777.3:2005
Grid connection of energy systems via inverters,
part 3: Grid protection requirements
DR AS/NZS 4777.2
2013
Grid connection of energy systems via inverters
Part 2: Inverter requirements
Grid connection
ER G83/1-1:2008
Recommendations for the Connection of Type
Tested Small-scale Embedded Generators (Up to
16A per Phase) in Parallel with Low-Voltage
Distribution Systems
Grid connection
ER G83/2:2012
Recommendations for the Connection of Type
Tested Small-scale Embedded Generators (Up to
16A per Phase) in Parallel with Low-Voltage
Distribution Systems
Grid connection
ER G59/2-1:2011
Recommendations for the connection of
generating plant to the distribution systems of
licensed distribution network operators
ER G59/3: 2013
Grid connection
CER/06/190
Ireland: Arrangements for Micro Generation
Consultation Paper
Grid connection
RD 1663:2000
Spanish: Real Decreto 1663/2000,
Connection of photovoltaic system to the lowvoltage grid network
Grid connection
RD 661:2007
Spanish: Real Decreto 661/2007,
About the generation of electric energy
Grid connection
RD 1699: 2011
Spanish: Real Decreto 1699/2011, the connection
of generation system for electric energy with
small power
Grid connection
ÖNORM E 8001-4712:2009
Austria: Erection of electrical installations with
rated voltages up to AC 1000 V and DC 1500 V –
Part 4-712: Photovoltaic power-systems –
Erection and safety requirements systems
Period of validity: 2015-01-05 to 2018-08-28
Date of issue: 2015-01-05
4/6
Annex to the accreditation certificate D-PL-19065-01-00
Technical Area
Standard / inhouse procedures
/ version
Grid connection
Technical
Regulation
3.2.1:2011
1
Title of the Standard or the in-house methods
(resp. Information about deviations /
modifications from the standard procedures)
Testing / restrictions
Denmark: electricity generation facilities with a
rated current of 16 A per phase or lower
Grid connection
UTE C 15-712-1:
2010
France: LOW-VOLTAGE ELECTRICAL
INSTALLATIONS: Photovoltaic installations
connected to the public distribution network
Grid connection
C10/11:2012
Belgium: Technical requirements for specific
production facilities decentralised running
parallel on the distribution network
Grid connection
CEI 0-21:2012
Italy: Reference technical rules for the
connection of active and passive users to the LV
electrical Utilities
Grid connection
CEI 0-16: 2012
Reference technical rules for the connection of
active and passive consumers to the HV and MV
electrical networks of distribution Company.
Grid connection
EN 50438: 2007
EN 50438: 2012
EN 50438: 2013
Requirements for the connection of microgenerators in parallel with public low-voltage
distribution networks
Grid connection
IEEE 1547:2003
IEEE Standard for Interconnecting Distributed
Resources with Electric Power Systems
Grid connection
IEEE 1547.1:2005
IEEE Standard Conformance Test Procedures for
Equipment Interconnecting Distributed
Resources with Electric Power Systems
Grid connection
Grid connection
BDEW:2008+
Technical Guideline
Supplement
1/2009, 7/2010,
2/2011
Generating Plants Connected to the MediumVoltage Network
FGW TR3 Rev.23
Technical Guidelines for Power Generating Units
Guideline for generating plants’ connection to
and parallel operation with the medium-voltage
network
Part 3 Determination of electrical characteristics
of power generating units connected to MV, HV
and EHV grids
Period of validity: 2015-01-05 to 2018-08-28
Date of issue: 2015-01-05
5/6
Annex to the accreditation certificate D-PL-19065-01-00
1
Technical Area
Standard / inhouse procedures
/ version
Title of the Standard or the in-house methods
(resp. Information about deviations /
modifications from the standard procedures)
Grid connection
FGW TR4 Rev.6
Technical Guidelines for Power Generating Units
Testing / restrictions
Part 4 Demands on Modelling and Validating
Simulation Models of the Electrical
Characteristics
of Power Generating Units and Systems
Grid connection
FGW TR8 Rev.6
Technical Guidelines for Power Generating Units
Part 8 Certification of the electrical
characteristics of power generating units and
systems in the medium-, high- and highestvoltage grids
Grid connection
ABNT NBR 16149
Photovoltaic (PV) systems – Characteristics of
the utility interface
Grid connection
ABNT NBR 16150
Photovoltaic (PV) systems – Characteristics of
the utility interface – Conformity test procedure
Grid connection
MEA Guideline:
2013
Regulation for an Inverter Used in Gridconnected Power Generating System of the
Metropolitan Electricity Authority (MEA)
Grid connection
PEA Guideline:
2013
The Requirements on Grid Connection of
Provincial Electricity Authority(PEA) for VSPP
Period of validity: 2015-01-05 to 2018-08-28
Date of issue: 2015-01-05
6/6