Plan Drawing Ref D&A Section 1 4.2.1 Weighbridge 2 4.2.1 Peecon Feeder 24m3 GPH/CROU/008/PL/024 3 4.2.1 Peecon Feeder 80m3 4 4.2.1 Peecon Feeder 60m3 5 4.2.1 Pump Station 6 4.2.2 Digester 1 7 4.2.2 D&A Section Title Feedstock Arrival and Feed Systems Primary Digestion Tanks Equipment Name Drawing Ref Drawing Title Drawing By Scale Dimensions G.P.H N.T.S Yes Weighbridge 24m3 Peecon G.P.H 1:50 @A3 Yes Feeder mixer for Digesters 1 and 2 112‐800‐000‐900‐4992 Stationary Mixer 80m3 Crouchland Peecon 1:60 @A3 Yes Feeder mixer for Digesters 1 and 2 112‐600‐000‐900‐4926 N/a Peecon N/a Yes Feeder mixer for Digester 3 1:50 @A3 Yes 6.1m metal container 1:100 @A1 Yes Digestion Tank 1:200 @A3 Yes Digestion Tank 1:100 @A0 1:200 @A2 Yes Digestion Tank 1:50 Yes Three tanks, acoustically enclosed fans and pipework CSO desulphurisation equipment Removal of Hydrogen Sulphide from biogas prior to combustion and/or further gas clean up processing Reduce noise emissions from fans GPH/CROU/008/PL/020 Rev 0 Weighbridge GPH/CROU/008/PL/021 Rev 0 GPH/CROU/008/PL/021 Rev 0 G.P.H GPH/CROU/008/PL/008 Existing Bio‐Tanks Planning Drawing Proposed Planning Bio‐Tank Planning Drawing G.P.H Slab and Plan Elevations CSO Technik Equipment Description G.P.H Digester 2 Purpose Weigh incoming and outgoing vehicles to determine weight of feedstock Receive and process feedstock, transfer to digesters 1 and 2 Receive and process feedstock, transfer to digesters 1 and 2 Receive and process feedstock, transfer to digester 3 Transfer of feedstock from feeder mixers to AD tanks Digestion of organic matter in anaerobic conditions to produce biogas Digestion of organic matter in anaerobic conditions to produce biogas Digestion of organic matter in anaerobic conditions to produce biogas 8 4.2.2 Digester 3 GPH/CROU/008/PL/009 9 4.2.3.1 CSO Desulphurisation Equipment VOO1254‐04‐01_01 9a 4.2.3.1 CSO Coolers Acoustic Enclosures GPH/CROU/008/PL/026 CSO Plant Blower Acoustic Enclosures G.P.H 1:50 @A4 Yes Acoustic enclosures to house CSO cooler fans 10 4.2.3.1 Purac CO2 Removal GPH/CROU/008/PI010 Purac Plant Planning Drawing G.P.H 1:100 @A1 1:200 @A3 Yes Tanks and containers associated with Purac CO2 Removal of CO2 to yield pure biomethane for removal plant further processing prior to removal from site Purac Coolers COOL‐370‐08‐04‐100‐11 Purac Puregas/Crouchland Farm Luvata Soderkoping NTS Yes Gas Cooling Plant Gas Clean‐up and Conditioning Biomethane Plant Cooling of gas as it passes through gas clean up processing stage, cooling prepares the gas for compression and storage stages Compression of biomethane to pressure suitable for biomethane export Cooling of compressed gas as it enters storage / export stage 11 4.2.3.1 12 4.2.3.1 Wartsilla CNG Gas Compressor AS1000‐1364‐2 Layout gas vector 4DA300‐160kW inverter Fornogas 1:20 Yes 3 x gas compression equipment housed in container 13 4.2.3.1 CNG Coolers AS10001379‐0 Layout air cooler 3 fan (160kW) Fornogas 1:20 Yes Gas Cooling Plant 14 4.2.3.1 ENCAL Kiosk QD12375 Encal Kiosk Quinshield NTS Yes Analysing equipment housing Kiosk for housing of AD analysing equipment 15 4.2.3.1 Gas Dryers GPH/CROU/008/PL/011 Gas Dryer System G.P.H 1:20 @A3 Yes Exterior pipework and control cabinets (x2) Removal of moisture from biogas 16 4.2.4 Biomethane Up‐load Stanchion Type CP569 Hale Hamilton (Valves) Ltd N114324 Yes Bio‐methane Up‐load stanchions Lorry Park & Details Glanville As shown @A2 Yes Loading area showing wheel stops N/a N/a N/a N/a 2 x cooling fans for CHP units ENER‐G 1150kW CHP ENER‐G 1:30 @A1 Yes CHP Generator in container housing with stack N/a N/a 1:30 @A2 Yes N/a Biomethane Export Biomethane Loading Stanchion Biomethane Loading Bays N114324 17 4.2.4 18 N/a CHP Cooling Fans N/a 19 4.2.5 CHP 1 (1.15MW) 13238 19a N/a CHP 1 Catalytic converter N/a N/a N/a 20 4.2.5 CHP 2 (2MW) 9671 ENER‐G 2.0MW CHP ENER‐G 20a N/a CHP 2 Catalytic converter N/a N/a N/a CHP Plant ST8120997‐217 21 4.2.5 Oil Tank 22A 4.2.6 1.5MW Dualfuel Boiler and Hot Water Pump GPH/CROU/008/PL/025 22B 4.2.6 Hot Water Pump GPH/CROU/008/PL/002 rev 0 23 4.2.6 Heat Exchanger 1534‐M‐0008 24 4.2.7 Heat Distribution Catalytic conveter exhaust for CHP 1 CHP Generator in container housing with stack Backup CHP engine for conversion of biogas to electricity and heat in the event of gas clean up process being offline N/a Catalytic conveter exhaust for CHP 2 G.P.H 1:50 @A3 Yes Oil Tank Oil store for storage of oil supplied to CHPs, dualfuel boiler and pump system Byworth Boiler Container G.P.H 1:50 @A3 Yes Dual Fuel Boiler runs off biogas or diesel Backup boiler to provide heat to AD plant in the event of CHPs being unavailable Hot Water Pump System Container G.P.H 1:50 @A3 Yes Metal container housing hot water pump Pump to distribute hot water around the AD plant to achieve desired temperature Crouchland Heat Skid ENER‐G N.T.S Yes Heat Exchanger Heat exchanger for efficient capturing of heat and utilisation of heat within AD process GPH/CROU/008/PL/015 rev 0 Oil Tank Transformer 1 GPH/CROU/008/PL/003 Rev 0 Transformer G.P.H 1:40 @A3 Yes Transformer in cabinet Transformer 2 GPH/CROU/008/PL/003 Rev 0 Transformer G.P.H 1:40 @A3 Yes Transformer in cabinet Transformers 25 4.2.7 Transfer of methane to road tankers for removal of gas from site Loading bays for road tankers to receive methane from loading stanchions Cooling fans for CHPs 1 and 2 (previously intalled on top of CHP containers) Provides parasitic heat and power and backup CHP engine for conversion of biogas to electricity and heat in the event of gas clean up process being offline To transform generated electricity to required voltage for export to national grid To transform generated electricity to required voltage for export to national grid 26 4.2.8 27 4.2.9 28 4.2.9 29 Closed Flare Flare 1294‐2001 Switch and Control Room GP/CROU/008/PL/005 Control Room GHP/CROU/008/PL/013 4.2.9 Admin Office and Control Room GPH/CROU/008/PL/004 30 4.2.10 Separator ST8120997‐20 Rev C2 31 4.2.10 Digestate Liquor Holding Tank 32 4.2.10 33 4.2.10 Pump House 34 4.2.10 Digestate Lagoon 35 4.2.11 Oil Interceptor 36 4.2.11 Control Systems Digestate Management NTS Yes Gas flare For combustion of biogas as last resort in the event of no alternative gas processing stream being available G.P.H 1:50 @A3 Yes 6.1m metal container Control Room for tanks 1 & 2 G.P.H 1:50 @A3 Yes 6.1m metal container Control Room for tank 3 Admin, Office and Control Office G.P.H 1:50 @A3 Yes Admin Office Admin Office for site operations Extenstion of Separator Platform Glanville As Shown @A1 Yes Separator Plant for separation of whole digestate to solids and liquids 1:50 @A2 Yes Concrete walled, and partially below ground storage tank Temporary storage of liquid digestate prior to transfer to digestate lagoon for long‐term storage Buried pipework connecting AD tanks with digestate lagoon Transfer of liquid digestate from tanks to lagoon General Arrangement UFO‐3000‐ENV Switch and Control Room 6100 Shipping Container New Tank Control Room 6100 Shipping Container GPH/CROU/008/PL/016 Rev 0 Digestate Liquor Holding Tank UniFlare G.P.H Buried component ‐ no elevation or plans drawing provided Buried Pipework GPH/CROU/008/PL/021 Rev 0 GPH/CROU/008/PL/021 Rev 0 128‐75 Plan, Section and Detail ‐ Earthwork G.P.H PG Quinn Ltd 1:50 @A3 Yes 6.1m metal container Transfer of liquid digesate from AD tanks digestate storage lagoon following separation As shown @A1 Yes Lagoon with HDPE cover and liner Storage of liquid digestate from the AD tanks Buried component ‐ no elevation or plans drawing provided Oil interceptor to capture solid contaminants Buried component. SPEL Puraceptor class 1 single present within run off from the site prior to it chamber separator ‐ full retention leaving site and enabling extraction and safe disposal 2 x cylindrical underground chambers with Pump to transfer dirty water to attenuation concrete sill and metal handrail lagoon 1 x cylindrical underground pump chamber with Pump to transfer clean water for recycling / concrete sill and metal handrail removal from site Dirty Water Pump GPH/CROU/008/PL/017 Dirty Water Pump No 1 G.P.H 1:50 @A3 Yes Clean Water Pump G.P.H 1:50 @A3 Yes Lagoon Cross‐Section Aardvark EM Ltd 1:200 @ A3 Yes Farm Workshop Machinery Store Planning Drawing G.P.H 1:200 @ A3 Yes Agricultural building for purposes of farm machinery storage N/a Yes Portable metal waste skip bin G.P.H 1:50 @A3 Yes 2 x black, upright storage tanks Drainage Measures 37 4.2.11 Clean Water Pump GPH/CROU/008/PL/018 38 4.2.11 Farmyard Dirty Water Attenuation / Slurry Lagoon 1387/2831 39 4.2.12 Workshop GPH/CROU/008/PL/001 40 4.2.12 Waste Storage N/a 41 4.2.12 Bunded Fuel Store 42 4.2.12 Dairy Office Continental 1100 Litre Technical Information Taylor GPH/CROU/008/PL/022 Rev 0 Bunded Fuel Store Attenuation area for farmyard and site run off GPH/CROU/008/PL/012 Dairy Office G.P.H 1:100 @A3 Yes Temporary site office building GPH/CROU/008/PL/04 Security Fencing and Gate G.P.H 1:100 @A3 Yes Palisade style fencing in RAL 6005 Dark Green Workshop and machinery storage building Storage of general site waste prior to off‐site disposal Fuel store area for on site plant and /or machinery Office for dairy operations Ancillary Development 43 4.2.12 Palisade Fencing Security fencing around perimeter of site 44 4.2.12 Sliding Gate Access gate to site 45 4.2.12 Lagoon Fencing N/a 46 4.2.12 Digester 3 Bund GPH/CROU/008/PL/009 "Preventing access to effluent storage and similar areas on farms" Proposed Planning Bio‐Tank Planning Drawing Health and Safety Executive G.P.H N/a 1:100 @A0 1:200 @A2 Yes Post and wire mesh fencing Safety fencing surrounding digestate lagoon Landscaping Bund Reduce visual impact of third digester tank
© Copyright 2024 ExpyDoc