CURRICULUM VITAE Abel Cardoso Holtz Detailed Professional

CURRICULUM VITAE
Abel Cardoso Holtz
68 years old - male
Graduation – Civil Engineer
Expert on Business Administration, Foreign Trade, Financial
Administration, and Contracts
Detailed Professional Experience
As Independent Consultant and Business Advisor.
October 2000 to date – HOLTZ ENGENHARIA & ASSOCIADOS S/C LTDA.
Major Tasks:
2014 – Hired by Three major Brazilian Construction Companies to
analyze possibilities and condition materialize the concept of a
binational power company between Brasil and Bolivia.
2013 – Hired by Construtora Norberto Odebrecht to participate in a
series of meeting in Assunción with ANDE (Administración Nacional de
Eletricidad), in order to make evaluations on partnerships at the
electric sector in Paraguay.
2013 – Hired by Construtora Norberto Odebrecht to participate in a
workshop in Windhoek on an International Agreement between Angola
and Namibia, on a financial structure for funding the construction of the
binational Hydroelectric Project of Baynes.
2012 – Hired by four major private companies of the electric energy
industry—Duke Energy Paranapanema, MPX, GDF-Suez, and Odebrecht
Energia, in a partnership with CBIE— to review and influence on the
materialization of the concept of auctions by sources and by regions,
the environmental issue in the construction of hydroelectric plants and
the impact of taxes in the structuring of the projects.
2011 – Hired by four major Brazilian Power Companies to analyze the
market and help materialize the concept of Hydrothermal Energy for
the Electricity Sector.
2010 – Hired by ABEólica to draft its Strategic Plan to assure its
presence in the Brazilian Power Matrix.
2010 – Hired by Andrade & Canellas Energia S.A. for technical and
commercial advisory on business development in power generation—
Greenfield Projects in Angola.
CV Abel Holtz – SP, JUN 2004
2010 – Hired by ETH Bioenergia S.A. for technical and commercial
advisory on the power trade business.
2010 – Hired by Foz do Brasil for technical and commercial advisory on
power potential of the water supply system of COMPERJ.
2010- Hired by ABEEólica to provide a Strategic Plan for its operation as
the association for the wind power producers.
2010- Hired by Xilolite for technical and commercial advice on the
power supply and costs.
2010- Hired by Andrade & Canellas Energia S.A. for technical and
commercial advice on business development in power generation
Greenfield Projects in Angola.
2010- Hired by ETH Bioenergia S.A. for technical and commercial advice
on the power trade business.
2010- Hired by FOZ do Brasil for technical and commercial advice for
implementation of a solution to provide power to the water supply
system to COMPERJ.
2009- Hired by Citagua for technical and commercial advice as to the
deployment of PCH Ilha da Luz (ES).
2008 - Hired by MPX to provide technical and commercial advice as to
the power generation business.
2005 - Hired by Construtora Norberto Odebrecht to provide technical
and commercial advice as to the Country Director in Angolan activities
on business development to power generation Greenfield Projects.
2005 - Hired by Construtora Norberto Odebrecht to provide technical
and commercial advice as to the Power Director’s team on the
generation business Greenfield Projects.
2004 - Hired by CFS do Brasil to provide technical and commercial
advice as to the Transmission business in Brazil and Angola.
2004 – Hired once more, by Odebrecht to provide technical and
commercial assessment of its assets at Gerasul represented by an 84,5
MW power swap option
2003 - Hired by Itapebi Geração de Energia to provide technical and
commercial counseling on the power generation business.
2002- Hired by ABRACE – Brazilian Association of Large Energy
Consumers to provide consulting about the impact of the Electric Sector
Revamping Program on the Brazilian industry power costs and on their
competitiveness.
2001 - Hired by Monitor do Brasil to provide consulting services on
corporate management.
CV Abel C.Holtz – SP 03/07/2014
2
2001 - Hired by RAIMUNDO BRITO E CALASANS – Advogados
Associados to provide technical and commercial counseling on power
transmission from the Itá and D. Francisca Hydroelectric Plants.
2001 - Hired by CSN-Energia to provide technical and commercial
counseling on the generation business.
2001 - Hired by Odebrecht to provide technical and commercial
assessment of its assets at Gerasul represented by an 84,5 MW power
swap option.
2000 - Hired by Odebrecht to identify and negotiate an 84,5 MW swap
option.
CV Abel C.Holtz – SP 03/07/2014
3
As Executive
Independent Tasks Performance.
September 2000 to date - Director and main executive HOLTZ
ENGENHARIA & ASSOCIADOS LTDA – consulting on investments in
power business and projects in general.
Major Tasks:
In charge of corporate management setting roles focusing on actions
on business effectiveness; organizing tasks and advisers.
June 2003 to September 2004 - ELETROCOOP PLANEJ & DESEVOLV DE SET
DE ENERGIA ELET TRANSM DADOS – ELETROCOOP – as its President,
responsible for implementing the company in a pioneering partnership
between private small power plants entrepreneurs in a Cooperative
Organization.
Major Tasks:
In charge of corporate management, including the structuring of a
finance scheme for an equity fund to funding the projects; setting roles
focusing on actions on business effectiveness; organizing tasks and
advisers; formulating administrative and management policies for the
cooperative interactions; projects’ validation; establishing goals and
result-oriented management.
June 2002 to Jan 2003 – COMPANHIA HIDRELETRICA
FRANCISCO – CHESF, Member of the Board of Directors.
DE
SÃO
Major Tasks:
Reviewing and approving strategic decisions made by the corporate
management, including resetting roles focusing on actions aiming at
competition in the new power market environment; strategic action and
positioning on the power auction selling; review of administrative and
management policies with emphasis on financial aspects; establishing
goals and result-oriented management for the next years.
CV Abel C.Holtz – SP 03/07/2014
4
September 2001 to February 2002 – ADMINISTRADORA DE SERVIÇOS
DO MERCADO ATACADISTA DE ENERGIA – ASMAE as President,
responsible for implementing and clearing house the purchase and sale
of electric energy in the Brazilian market.
Major Tasks:
In charge of corporate management, including restructuring; resetting
roles focusing on actions on the two major businesses; reorganizing
positions and teams; reformulating administrative and management
policies with emphasis on human resources, training, and the user;
establishing a new communication policy; establishing goals and resultoriented management.
Odebrecht International Business Performance.
From January 1985 to June 1989 – International Business Director
Major Activities:
New business deal in Algeria, being responsible for contacts and
negotiations with members of MEICP – Ministére des Industries
Chimiques et Petrochimiques. A tentative barter deal between Algeria
and Brazil aiming at a 100,000 m 3 /day of liquefied natural gas
importation by Petrobras for the Brazilian market against the
construction of a 3,000 km railroad in the Algerian High Plains held by
Odebrecht.
New business deal in Morocco. Discussions with the Ministére des
Equipments and OCP. In short, a tentative barter deal between Morocco
and Brazil aiming at the construction of the Benin El Rarun dam to
irrigate a vast agricultural area, which construction should be held by
Odebrecht whereas the import of phosphoric acid necessary for the
fertilizer industry should be borne by the Brazilian Government.
From May 1983 to December
International Business Division.
1984
–
Market
Director
for
the
Major Activities:
New business development in Argentina, Bolivia, Dominican Republic,
and Suriname, participating in meetings with the IDB and the WB in
Washington (USA) to develop financing schemes for prospective
projects in these countries.
CV Abel C.Holtz – SP 03/07/2014
5
Kapanda Project – member of the ODEBRECHT negotiation team in the
consortium with the Soviet company TECHONOPROMEXPORT (TPE)
(former USSR). Top discussions held in Moscow for two years. Further
joint negotiations took place in Luanda, Angola, with the Angolan
Ministry of Energy and Petroleum for construction of the 530-MW
Kapanda Hydroelectric Power Plant.
Odebrecht National Business Performance.
November 1997 to October 2000 – ODEBRECHT SERVIÇOS DE
INFRAESTRUTURA – OSI Odebrecht Investment Division – Power
Concession, Assistant Director based at the company’s head office in
São Paulo.
Major Projects:
In charge of studies and design for divestiture of Odebrecht’s share in
the ITASA power venture. In charge of technical and commercial
management support to Odebrecht‘s interests in power generation as
an Itasa board member.
Odebrecht representative at ABDIB – Power Task Force Group to
assess, influence, propose, establish, and conceptually consolidate the
new model for the electricity sector, in addition to assessing the
technical aspects and financial conditions for the power generation
business in Brazil. The task scope comprised official meetings with
government officials and authorities.
From December 1995 to November 1997 – Odebrecht Investment
Division – Assistant to the Power Concessions Director, based at the
company’s head office in São Paulo.
Major Activities:
Responsible at the Odebrecht Group for studies and development of a
strategic plan focusing on new opportunities and its participation as a
private entrepreneur in electric power generation.
Responsible at the Odebrecht Group for the conceptual proposition,
development, consolidation of the structure, technical and financial
studies, and definition of a strategic planning for participation of
private investors in the power generation business in Brazil.
CV Abel C.Holtz – SP 03/07/2014
6
Responsible for developing the power generation business at the
Campos Novos Hydroelectric Plant, including conceptual consolidation,
technical and financial studies, and development of a strategic planning
for participation of private investors in the business. The model was
devised as the first consortium between domestic and international
companies (AES - American Energy Services and Light) under an EPC
agreement led by Odebrecht and Andrade Gutierrez.
This task included devising an EPC agreement, on a turnkey and lump
sum basis, in which ABB, Gec Alsthom, Voith, Engevix, Promon,
Odebrecht, and Andrade Gutierrez formed the core of goods and
services suppliers. Identifying and contracting off-takers was also part
of the job. The financing scheme was primarily developed with the ING
Bank working as a finance advisor. (The Granting Authority deferred
the tender for this project for several years. The bidding was held later
but with changes).
Responsible for studying and proposing to Odebrecht’s board of
directors the participation of the company as Independent Producer of
Energy (PIE) having its participation at ITASA as support. A thorough
commercial, technical, and legal analysis was performed with
recommendations as to the best alternatives to sell the surplus power
under the existing regulation.
Representative of the Odebrecht Group at ACCE, ABDIB, and APINE to
propose, influence, establish, and conceptually consolidate techniques
and financial conditions for the power generation business in Brazil.
The task scope comprised official meetings with government officials
and authorities.
Responsible for scouting a partnership with foreign investors on power
generation ventures in Brazil.
The task included the identification of prospective partners at American
investment funds. Conclusions and recommendations were submitted
to Odebrecht Board of Directors.
March 1992 to October 1997 – COMPANHIA BRASILEIRA DE PROJETOS
E OBRAS – CBPO
In the following positions:
From July 1993 to December 1995 – Assistant to the Concessions
Director based at the company’s head office in São Paulo.
Major Activities:
CV Abel C.Holtz – SP 03/07/2014
7
In charge, as the Administrative Structure Planning and Consolidation
Director of the Concessions Business of CBPO, of the support to provide
recommendations to the Federal Government for funding highway,
sanitation, and power generation concession agreements.
Responsible for designing and developing legal conditions for private
sector participation in power generation concessions—self-production;
From June 1993 to October March 1997
Responsible for developing the power generation business, including
participation in the bidding by CSN – Companhia Siderúrgica Nacional,
Companhia de Cimento Itambé, Poliolefinas S/A, and PPH – Companhia
Industrial de Polipropileno for the Itá Hydroelectric Plant. The proposal
was submitted to Centrais Elétricas do Sul do Brasil S/A – ELETROSUL
and included institutional, legal, and financing structure and proposal
strategy for a consortium. This was a pioneering partnership between
private companies and a state-owned company (ELETROSUL) for
undertaking a large-scale Hydropower Plant Project (1,450 MW
installed capacity)—a USD 1 billion project.
From March 1992 to June 1993 – Assistant to the São Paulo
Superintendent Director in charge of Concession Business Development
for the São Paulo State.
Major Activities:
Structuring and designing operations to make the concession business
feasible and devising recommendations for bidding processes held by
the state government for highway, sanitation, and power generation
concessions.
From July 1989 to February 1992 – Director in charge of the Concession
Program in Brazil. A joint effort of Odebrecht and others entrepreneurs
to support Brazilian Congressmen.
Main Activities:
Advisory to members of the Brazilian Congress on formulation of
specific legislation for concessions based on experience gained in
foreign countries.
Coordination of the company's operations in the contract concession of
the 3rd bridge at Vitória in the Espírito Santo State, through the ORL
subsidiary.
CV Abel C.Holtz – SP 03/07/2014
8
Design, structuring, and implementation of a financial scheme for a
partnership between Odebrecht and Companhia de Eletricidade do
Estado de Goiás, by which SPE-OPEL was committed to securitization of
receivables from power generation in Phase IV of the Cachoeira
Dourada Hydroelectric Power Plant, as a source of payment for
investments made to complete the project.
May 1975 to February 1992 – CONSTRUTORA NORBERTO ODEBRECHT
S/A – CNO
In the following positions:
From May 1975 to November 1976 – Project Manager based at the
company’s head office at Salvador, Bahia.
Main Activities:
Negotiation of water supply and sanitation projects for the Northeast
within the PLANASA Program supported by the former National Housing
Bank.
Supervision of the agreement between Odebrecht and Petrobrás for
geological survey at the Campos Basin for installation of concrete
platforms for oil production.
Contract manager for Odebrecht as member of the team formed with
Norwegian Contractors for joint studies and construction of concrete oil
platforms at the Campos Basin in Brazil.
Member of the group assigned by the Board of Directors for analysis of
partnerships with Petrobrás, Occidental Petroleum, and Compagnie
Française des Petroles, including assessment for obtaining financing at
international banks for participation in the oil exploitation program at
the Campos Basin.
From December 1976 to November 1978 – Commercial Manager based
at the company’s head office in Rio de Janeiro, Brazil.
Main Activities:
At the Almirante Álvaro Alberto Nuclear Power Plant (Angra I, II, and
III) – Commercial Manager responsible for the entire supply of goods
and services, technology transfer agreements, purchase and leasing of
equipment to meet the construction of the Nuclear Power Plant on
behalf of FURNAS Centrais Elétricas S/A.
CV Abel C.Holtz – SP 03/07/2014
9
Responsible for managing the technology transfer agreement with
Hochtief AG Company – West Germany for the same project.
From November 1978 to February 1979 – Manager of the first
Odebrecht temporary foreign office in London, UK.
Major Activities:
Responsible for procurement and negotiations with future partners for
the supply of services and goods to projects in the Middle East.
From March 1979 to November 1979 – Assistant to the Superintendent
of Odebrecht Perfurações – OPL, the first Brazilian oil drilling company.
The company was created to manage the offshore drilling business of
Odebrecht in Aracajú, Sergipe.
Main Activities:
Responsible for hiring the entire foreign labor for platform operation;
contract administration at PETROBRÁS and establishment of the
insurance policy for the company and for the NORBE I jack-up rig.
From December 1979 to December 1980 – Superintendent of the CNO
Erection Division in Salvador, Bahia.
Main Activities:
Responsible for implementing the CNO-PRONTOFERRO merger—a
former Odebrecht subsidiary in charge of constructing fixed platforms
and related projects.
Responsible for managing agreements with PETROBRÁS, CARAÍBAS
METAIS, and RFFSA, meeting contractual liabilities assumed by
PRONTOFERRO.
From January 1981 to December 1982 – Contract Manager for the
Offshore Construction Project, in Salvador, Bahia.
Main Activities:
Responsible for constructing five offshore fixed platforms for oil
exploitation for PETROBRÁS.
Main characteristics: 6,200-ton total weight and 20-50 m (66,000 a
165,000 ft) length.
CV Abel C.Holtz – SP 03/07/2014
10
Based at the company’s office in Rio de Janeiro, from January 1983 to
February 1992, in the following positions:
From January 1983 to April 1983 – Superintendent to the Southern
Project Unit in charge of the Offshore Construction Department.
Major Activities:
Responsible for managing erection project contracts for CNO.
Others Previous Tasks.
January 1969 to April 1975 – CONSTRUTORA RODOARTE LTDA. –
Associate Manager in charge of the Technical Department.
Major Activities:
Responsible for the company proposal, procurement and negotiation
with suppliers, contract administration and relationship with clients, as
well as coordination of logistic support. Major infrastructure
agreements for the entire state of Bahia and the Northeast involving
the Brazilian Government: drainage work, bridges, water and sewage
treatment systems, viaducts, containment, drainage, and paving works
for the Bahia State Government.
March/70 to February /71 – Treasury Director, member of the board of
the CLUBE DE ENGENHARIA DA BAHIA.
Major Activities:
Responsible for budget and finance administration, including members
contributions.
May 1965 to December 1968 – COMPANHIA DE NAVEGAÇÃO BAHIANA –
Technician
Assistant to the Engineering and Maintenance Department
Major Activities:
In charge of the ship fleet maintenance program, including drydocking, and of the maintenance program of the company’s mooring
piers and docks along the Todos os Santos Bay.
CV Abel C.Holtz – SP 03/07/2014
11
March 1966 to December 1966 – POLYTECHNIC SCHOOL OF THE
UNIVERSITY OF BAHIA
Assistant to the Head Professor at the Rational Mechanics Department.
March 1963 to December 1963 – Military Academy of Belo Horizonte
along the year of 1963 – Student Officer – Commander of the Boarding
School
Assistant to the Officer of the Day, in control of the activities of 150
boarded students.
CV Abel C.Holtz – SP 03/07/2014
12