Holistic System Risk Management

Company Profile
Cost Management
Risk Management
Software Development
Technikerstr. 32 | 6020 Innsbruck | Austria
www.riskcon.at
RiskConsult GmbH
Headquarters
Technikerstr. 32, 6020 Innsbruck, Austria
Phone
+43 512-29 47 43-0
Email
[email protected]
Website
www.riskcon.at
Commercial registration no
FN 293 857v
VAT ID
ATU 63513709
Key Facts:
 Founded in 2007
 Total staff: 12
 Experts in cost management, risk management,
software developement and in-house trainings.
 Vast experience in major infrastructure projects.
Our office in Innsbruck
Business Partnerships
As a professional consulting company, SSP BauConsult offers services in all construction management and construction-related
issues. It provides high-quality services for owners, contractors
and planners. SSP BauConsult guarantees efficient, cost effective
and speedy processing of your orders.
Technikerstraße 32
6020 Innsbruck
Austria
www.sspbauconsult.at
11921 Ferdinand Street
P.O. Box 2852
St. Francisville, LA 70775
USA
www.moergeli.com
Rosengartenstrasse 28
CH-8716 Schmerikon
Switzerland
moergeli + moergeli is a consultung firm based in Switzerland providing services in the following fields: functional system safety,
system risk management, safety & health, management systems,
cost controlling and machinery & systems safety.
5E Engineering is a consulting company with longstanding experience in developing and planning major projects in the field of
hydraulic engineering.
Wilhelm-Greil-Straße 14/1
6020 Innsbruck
Austria
www.5e-zt.com
Technikerstr. 32 | 6020 Innsbruck | Austria
www.riskcon.at
CEOs
Philip Sander, PhD
Markus Spiegl, PhD
Personal Data
Born in:
1976, Munich
Born in:
1968, Innsbruck
Citizenship:
Germany
Citizenship:
Austria
Languages:
German, English
Languages:
German, English
Email:
[email protected]
+43 512 29 47 43-25
Email:
[email protected]
+43 512 29 47 43-40
Phone:
Phone:
Education
2012
Doctorate in engineering, PhD
University of Innsbruck
2002
"Probabilistic Risk Analysis for Construction Projects - Development of a Demand-oriented software
-based risk analysis system"
Doctorate in engineering, PhD
University of Innsbruck
"Risk Sharing in Public-Private Partnerships with
International Competitive Bidding“
2004
Graduation as Dipl.-Ing. (Univ. Dresden)
Cert. Civil Engineer
1995
Graduation as Dipl.-Ing. (Univ. Innsbruck), Cert. Civil Engineer
1998 - 2004
Technical University of Dresden,
Civil Engineering
1988-1994
Technical University of Innsbruck,
Civil Engineering
Professional Career
2010 - today
Lecturer at several universities:

Risk Management

Programming
2007 - today
RiskConsult GmbH, CEO
2009 - today
RiskConsult GmbH, Innsbruck, CEO
2002 - 2005
Lecturer for Construction Management
at the HTB, Bolzano (Italy)
2006 - today
SSP BauConsult GmbH, Partner
2001 - today
SSP BauConsult GmbH, CEO
2004 - 2006
CPM Projektmanagement GmbH Sindelfingen/Stuttgart, Germany
1996 - 2002
University of Innsbruck, Institute for
Construction Economics and Construction Management
2003 - 2004
Hochtief AG, Essen, Germany
2002
Grinaker-LTA, South Africa
1995 - 1996
ENTEC engineering/consulting company
Technikerstr. 32 | 6020 Innsbruck | Austria
www.riskcon.at
Services
Top Cost Elements
Dynamic Project Structure - depiction of
Not yet awarded
purchase orders
Capital surplus
to cover
materializing risks
Risks
Claims
Add. awarded
ik
n
contracts
hierarchic project structure in the software.
Quantity deviation
Basic Costs
experience with high-profile projects, the unique
challenges of your project will be successfully
Project costs
excluding risks
on a set date
Purchase Orders
Main contracts
Inflation
Paid
(Status)
Coaching by Experts - based on many years of
Not yet awarded
purchase orders
Commitments
estimations, cost controlling, final project review.
Cost Elements & Controlling Elements
Predicted inflation
during
project period
Not awarded
contracts
Consistent Cost Management - including cost
Predicted
Inflation
Awarded contracts
Link
Materialized risks
Cost Management
Probabilistic Approach - use of distributions to
illustrate your uncertainties and to better forecast costs and risks.
Tailor-made Software - software is adjusted and optimized for your project. Your project does not need to
fit into the software restraints.
Risk Management
Link
Risk
Identification
Develoment of a customized risk management system and effective incorporation into the company or the specific project.
Risk Management
Process
Qualita
tiv
Analys e
is
An integrated risk management process consisting of a combination of
complementing methods including established and approved scientific
methods (Generic Risk Management according to ISO 31000 and 31010).
Mo
& C nitorin
ont
roll g
ing
System Risk Management
Quantitative
Analysis
Structure analysis using Probabilistic Approach / Fault Tree / Event Tree
RAMS - Reliability, Availability, Maintainability, and Safety
RAMS evaluates the reliability, availability, maintainability and safety of your entire
system as a whole for the complete life cycle time.
BCM - Business Continuity Management
BCM prepares you for a fast continuity after an undesired event / system
downtime (e.g. based on ISO 22301).
Supported by the Cost and Risk Anaysis Tool
Software Development
Link
Combined Expert Knowledge - based on our software development
competence and long-term experience with high-profile projects as
consulting engineers we provide fast and high-end solutions
.NET - we offer development solutions based on the professional .NET
platform (C#, C++, VB, WPF, etc.)
Excel VBA - design of VBA tools for fast and user-friendly
applications in MS Excel.
Technikerstr. 32 | 6020 Innsbruck | Austria
www.riskcon.at
Main Products
Cost Risk Tool
Link
RIAAT has been specifically developed for operative risk and cost management and allows for active and
dynamic project management.
Excerpt Features:

Cost Estimation: Hierarchic structuring by using tree structures, central database and revision management

Risk Analysis: Qualitative and quantitative evaluation, detailed financial assessment of risks, applicable for
planning and execution phases, combination of change order and risk management

Probabilistic Approach: Illustration of uncertainties and monitoring of changes

Project Controlling: Purchase order administration (incl. additional costs, accounting, forecasts, etc.),
assignment of costs to years to determine cash flow

Reports: Visualization of data in various diagrams; export of all data to
MS Excel as required
Projects (Selection)
Koralm Base Tunnel
Railway Corridor Lower Inn Valley
Citytunnel Feldkirch
Hydro Power Plant Spullersee
Hydro Power Plant Tauernmoos
Hydro Power Plant Illspitz
Hydro Power Plant Mittlerer Inn
PEP - Project Cost Estimation Software
Link
PEP has been developed specifically for cost estimations
based on .NET - initially for the Semmering Base Tunnel
in Austria.
 Hierarchic cost structuring using tree view
 Cost estimation based on pricing procedure incl.
source management
 Visualization of data in various diagrams
 Supports data export to MS Excel
www.riskcon.at
Technikerstr. 32 | 6020 Innsbruck | Austria
www.riskcon.at
Projects (Selection)
Koralm Base Tunnel
Link
With a total length of 32.8 km and a maximum cover of 1,250 m
the base tunnel will traverse the Koralpe mountain range and will
connect the Austrian states of Styria and Carinthia.
 Services:
Risk management
Moderation of the process during the
whole planning and construction stage
 Software:
 Project costs:
approx. 1.5 billion €
Source: http://www.koralmtunnel.eu
Citytunnel Feldkirch
Link
The heart of the project is the 4-arm underground roundabout with a
diameter of 58 m, which connects the 4-section city tunnel underneath
Feldkirch and diverts the traffic.
 Services:
Probabilistic cost estimation
Preparation of a construction schedule to calculate the time-dependent costs
 Software:
 Project costs:
approx. 220 million €
Hydro Power Plant Illspitz
Link
Source: http://www.feldkirch.at/stadt
By developing a small power plant at the river Illspitz the
share of hydro power households will be raised from 19% up
to 35% (25.5 million kWh per year).
 Services:
Project management
Cost controlling
 Software:
 Project costs:
approx. 30 million €
Source: http://www.feldkirch.at/stadtwerke
Semmering Base Tunnel
Link
For the new construction of the Semmering base tunnel, the project management team ordered the development of a new software program to facilitate cost calculation.
 Services:
Development of software for the systematic
structuring and estimation of the project costs
 Software:
PEP
 Project costs:
approx. 3.0 billion €
Technikerstr. 32 | 6020 Innsbruck | Austria
www.riskcon.at
Publications (Selection)
Please find all documents on our website: www.riskcon.at (References  Publications)
Title and Theme
Place of Publication
Language
Continuous Cost and Risk Management for Major Projects in the Infrastructure Sector
Presentation and article BrennerCongress, February
20, 2014, page 51-62
Risk Management – How Do You Control Your Risks in
Practice?
Presentation at Boston Society of Civil Engineers Section on January 30, 2014, at the Revere Hotel, Boston
English
Cost and Risk Analysis - Fallacy of the Single Number
Approach
ÖGEBAU Journal, December 2013,
issue no. 12/2013, page 9-16
German
Project Review Lower Inn Valley Railway Corridor - Claim
Analysis
bauaktuell journal, November 2013,
issue no. 5, page 173-177
German
Value Added through Risk Analysis
Österreichische Bauzeitung, May 2012,
issue no. 9, page 26/27
German
Development of a Demand-Oriented Software-Based Risk Analysis System
Dissertation, Philip Sander, 2012
German
RIAAT - A Software Tool for Probabilistic Cost and Risk
Analysis
Presentation Congress Hagenberg, July 15 2011, Linz
English
Risk Analysis as a Basis for Deciding between Alternatives - Example Contract H8
Geomechanics and Tunneling, April 2011,
issue 4/2011, page 17-30
English
Probabilistic Risk Analysis for Construction Projects
Presentation Vereinigung Österreichischer Bohr-, Brunnenbau- und Spezialtiefbauunternehmungen (VÖBU),
October 19, 2011, Vienna
German
Fallacy of the Single Number Approach - Advanced Ways
for Cost and Risk Analysis
bauaktuell journal, March 2011,
issue no. 2, page 65-69
German
The Single Number - Thoughts on Handling Vagueness
The economic aspects of building; a publication for the
60th birthday of Prof. Rainer Wanninger, IBB TU Braunschweig, March 2010
German
Probabilistic Cost and Risk Analysis for Large Infrastructure Projects Using Probabilistic Methods
40th anniversary publication of the Institute of Construction Management, TU Graz, 2009
German
Probabilistic Cost Estimation in Building Construction
Publication for the anniversary of the Institute of Construction Management, TU Darmstadt, 2009
German
Probability and Risk Management
Tunnels & Tunnelling International, April 2009
English
Risk Management for Large Infrastructure Projects Using
Probabilistic Methods
Presentation and article at ITA-AITES World Tunnel
Congress, May 2009
English
English
German
Probabilistic Risk Analysis for Construction Projects -
Technikerstr. 32 | 6020 Innsbruck | Austria
German
www.riskcon.at
Don't hesitate to contact us,
if you have any questions or suggestions.
Technikerstr. 32
6020 Innsbruck
Austria
Contact
Philip Sander, PhD
+43 512 29 47 43-25
+43 664 4035146 (cell)
[email protected]
Markus Spiegl, PhD
+43 512 29 47 43-40
+43 664 5434962 (cell)
[email protected]
www.riskcon.at
V14 - 17.09.2014