HARYANA VIDYUT PRASARAN NIGAM LIMITED (A Govt. of Haryana undertaking) Regd. office: Shakti Bhawan, Sector-6, Panchkula-134109 Corporate Identity Number: U40101HR1997SGC033683 O/o Chief Engineer (Material Management), Tel No.: 0172-2583724/2583744, Fax No.:0172-2583724/2565746 E-mail: [email protected], [email protected], [email protected] To 1. The Superintending Engineer/TS, HVPNL, Karnal/Panchkula/Rohtak. 2. The Executive Engineer/TS, HVPNL, Rohtak/ Yamunanagar/Kurukshetra/Panipat/ Kaithal. Memo No.Ch- 98/ITMS-144/IT&C/substation Dated: 5.12.2014 IT Plan implementation –Substation Module implementation and Training w.e.f 8.12.2014 at Karnal Training Center. Subject: As you are aware that the work of IT plan Implementation is in progress. 2. To make the users aware about handling the application, training for 5-6 days is to be imparted by System Integrator (SI) at Panchkula, Karnal, Hisar and Gurgaon. During the training, the Handholding of the module alongwith exposure to working on Live Environment shall be provided. 3. It is to inform that the training on Substation Module at Conference Hall, o/o SE/TS Karnal, Shakti Bhawan, Kunjpura Road Karnal will commence from 8.12.2014 (Monday) for 1st batch and from 15.12.2014 (Monday) for 2nd batch. As per directions of Managing Director, HVPNL it was desired that concerned SSE Incharge of the substation be also present during the training to staff. 4. The training has been scheduled in two weeks by picking up two persons in first week and remaining two persons in next week. The end users have been identified as per feedback provided by concerned AEE/AE of TS and M&P Wings. The detailed training schedule for Week-1 and Week-2 is attached herewith for reference (Annexure-A and Annexure-B). It is requested that the officers/officials mentioned in the enclosed training schedule may be directed to report in respective Training centers at 9.15 AM on 8.12.2014 for Week -1 and on 15.12.2014 for Week-2. SE/TS Karnal is requested to ask Sh. Piyush Xen/TS, Kurukshetra to supervise the training programme being ‘Core User’ for substation module and his AEE/Works to assist Sh. Piyush Xen/TS Kurukshetra for smooth running of training. The schedule has also been uploaded on HVPN website www.hvpn.gov.in under Tab ‘IT/ERP-Training programmes’. DA/Detailed training schedule SE/ IT & C For Chief Engineer/MM HVPNL Panchkula. CC: 1. 2. 3. 4. The Chief Engineer/TS, HVPNL, Panchkula. The Chief Engineer/MM, HVPNL, Panchkula. The Vice Principal, HPTI, Pinjore. The SPS to Managing Director, HVPNL, Panchkula for kind information of Managing Director, Panchkula. 5. The SPS to Director (Technical/Projects) HVPNL, Panchkula for kind information of Director (Technical/Projects), Panchkula. 6. Sh. Piyush Saini, Xen/TS, HVPNL, Kurukshetra. 7. AEE/Works of SE/TS, HVPNL Karnal. 8. Sh. Darshan Lal JE, IT Nodal officer at Karnal to ensure smooth running of training as per schedule. 9. Sh. Pawan JE IT Nodal officer at Kaithal. 10. Sh. Dhanraj JE IT Nodal Officer at Rohtak 11. Sh. Ashutosh Triguanyat, Program Manager (Site), M/s Tech Mahindra (SI). It is requested to supply attendance on daily basis alongwith feedback/evaluation of participants on completion of training. 12. Sh. Satvik Shriniwaroa, Project Manager, IFS Solutions. 13. Sh. Manish Thakur, Site Project Manager, Dimension Data 14. Sh. Sandeep Dogra, Dimension Data. Annexure-A Training Centre Day-1 (8.12.14) IT Plan Implementation Substation Module Implementation Training schedule wef 8.12.2014 to 12.12.2014 Process Name Process Name Session-1 Whom to attend Session-2 1. Introduction of Substation Module, IFS Basic List given below Equipments Master Navigation (Launching IFS Application,Log on Log Sheet Entry -1 (Hourly reading, process,changing password,key shortcuts) Battery reading) Karnal Whom to attend List given below Day-2 (9.12.14) Log Sheet Entry.-2( Energy Meter, Bus connection & other) SSTN -Technical and Non Technical Log Entry Part-1 List given below SSTN -Technical and Non Technical Log Entry Part-2 List given below Day-3 (10.12.14) SSTN-Preventive Maintenance and Condiction Based Maintenance List given below SSTN-Breakdown Maintenance and Emergency Maintenance List given below Day-4 (11.12.14) Technical Audit Periodical Testing List given below Hot line maintenance Line Maintenance List given below List given below Day-5 (12.12.14) E mail messaging+Basic Trouble shooting of Hardware and support mechanism List given below Generation of reports List given below Feedback+Test+Resolving shortcomings. Participants List Sr. No. 1 2 3 4 5 6 7 Substation 132 kV Rohtak 66 kV Lohara 66 kV Gangori 132 kV Bhore 132 kV Bodhni 132 kV Ganaur 132 kV Cheeka 1st Week Surender SA Sanjay Kumar JE Raman Saini SSA(C ) Eshwar Singh SSA(C ) Balbir Singh JE Dharambir JE Manoj ALM Anil SA Vikram SA(C ) Sushil Kumar SA(C ) Mohit Lineman Kamal Kumar SA Satnarain GSO Sumit Singh SA(C ) Sh. Sujan Sungh SSE 132 kV Rohtak, Annexure-B Training Center IT Plan Implementation Substation Module Implementation Training schedule wef 15.12.2014 to 19.12.2014 Process Name Process Name Session-1 Whom to attend Session-2 Day-1 (15.12.14) 1. Introduction of Substation Module, IFS Basic Navigation (Launching IFS Application,Log on process,changing password,key shortcuts) Log Sheet Entry.-2( Energy Meter, Bus connection & Day-2 (16.12.14) other) SSTN -Technical and Non Technical Log Entry Part-1 SSTN-Preventive Maintenance and Condition Based Day-3 (17.12.14) Maintenance Day-4 (18.12.14) Technical Audit Periodical Testing E mail messaging+Basic Trouble shooting of Hardware Day-5 and support mechanism (19.12.14) List given below Equipments Master Karnal Whom to attend List given below Log Sheet Entry -1 (Hourly reading, Battery reading) List given below List given below SSTN -Technical and Non Technical Log Entry Part-2 List given below SSTN-Breakdown Maintenance and Emergency Maintenance List given below List given below Hot line maintenance Line Maintenance List given below List given below Generation of reports Feedback+Test+Resolving shortcomings. List given below Participants list Substations 1 2 3 4 5 6 7 132 kV Rohtak 66 kV Lohara 66 kV Gangori 132 kV Bhore 132 kV Bodhni 132 kV Ganaur 132kV Cheeka 2nd Week Sushil SA Sinil Kumar SA(C ) Parbhash Chand JE Bhag Singh SSA(C ) jaspal SA Prem Lineman Vikram Kumar SA(C ) Ram Pal SA Vikram SA(C ) Parveen Kumar SSA(C ) Pardeep Kumar SA© Nirmal Singh SA(C ) Navin Lineman Harvinder Singh JE-1 Sh. Vishal Sharma SSE 132 kV Ganaur
© Copyright 2024 ExpyDoc