Typical subdivision drawings

.
Multi-tenement/lot development (3-19 lots)
2
Reticulated sewer at
1.0m offset under DWP
(developer funded)
Tapping to be sized for whole
development or separate
tappings to be located in
common property
Existing point
to be CCTV inspected
FP
3
3
Reticulated water
under DWP (developer
funded). Extended
water across frontage
1
1
3
FP
Existing point to be
CCTV inspected
Applicable servicing arrangement
3
2
Individual water
lines to extend
into each Lot
6
5
Owners corporation common
house drain in accordance
with VBA regulations
New tapping – two
meters located in the
Common Property in
a mainfold
Legend
1.Sewer alignment, connection point and common house connection drain locations are subject to lot control.
2.The examples shown are where all lots to be sub-divided are less than 500m2.
3.Where any lot(s) are above 500m2, then construction of full Barwon Water assets apply.
4.Existing single water services to be replaced if galvanised.
5. The house connection point must be extended into each allotment.
6.Easement widths available in Land Development Manual (LDM).
Disclaimer: Barwon Water does not accept any responsibility to investigate the assumptions made, or the information you
have provided, or if after further investigation those assumptions or further information provided are proved erroneous.
FP
MT
SV
C/W
HC
MS
1
Existing
tapping
Existing point to be
CCTV inspected
Applicable servicing arrangement
Notes
Issue date: January 15, 2015
Provide common
house connection
drain to service all lots
7
4
SV
Minimum 2.0m
easement
in favour of
Barwon Water
Existing point
to be CCTV
inspected
8
2
THROUGH STREET
100mm PVC
Easement is to be
2.0m in favour of
Barwon Water
2
Individual meters required for
developments up to six lots,
otherwise bulk meter and
sub-meters may be provided
(as shown)
*Owner’s corporation is required to encumber
all lots equally within the Subdivision
COMMON PROPERTY
*Owner’s corporation NOT permitted
COMMON PROPERTY
1
Fire plug
Mont tap
Stop valve
Carriage way
House connection
Maintenance shaft
Applicable servicing arrangement
TMS
CCTV
ODPE
HDPE
PVC
DWP
Terminal maintenance shaft
Closed circuit television
Outside diameter polyethylene
High density polyethylene
Polyvinyl chloride
Developer works process
S
W
Water service
Water meter
Proposed sewer
Proposed water
Existing sewer
Existing water
Typical servicing arrangements multi-tenement/lot development (3-19 lots) - lots < 500m2
.
Multi-tenement/lot development (3-19 lots)
5
*Owner’s corporation NOT permitted
Reticulated sewer at 2.0m offset
under DWP (developer funded)
when located in front yard
Existing sewer
HC point to
be CCTV
inspected
Tapping and Flushing Point to
be located clear of existing or
proposed driveway(s)
3
6
*Owner’s corporation NOT permitted
New sewer HC points cut into
existing sewer by Barwon
Water approved plumber
*Owner’s corporation NOT permitted
Existing sewer
HC point to
be CCTV
inspected
Reticulated sewer at
1.0m offset under DWP
(developer funded)
Easement is to be
2.0m in favour of
Barwon Water
Water main to
extend across the
entire frontage
63 OD HDPE
Easement is to be
3.0m in favour of
Barwon Water
2
1
DEAD END STREET
4
1
2
3
1
2
3
Reticulated
water under DWP
(developer funded)
FP
FP SV
MT
150mm PVC
Tappings to be provided for each lot for
development types without common property
Applicable servicing arrangement
Applicable servicing arrangement
Notes
Legend
1.Sewer alignment, connection point and common house connection drain locations are subject to lot control.
2.The examples shown are where all lots to be sub-divided are less than 500m2.
3.Where any lot(s) are above 500m2, then construction of full Barwon Water assets apply.
4.Existing single water services to be replaced if galvanised.
5. The house connection point must be extended into each allotment.
6.Easement widths available in Land Development Manual (LDM).
Disclaimer: Barwon Water does not accept any responsibility to investigate the assumptions made, or the information you
have provided, or if after further investigation those assumptions or further information provided are proved erroneous.
FP
MT
SV
C/W
HC
MS
Issue date: January 15, 2015
Fire plug
Mont tap
Stop valve
Carriage way
House connection
Maintenance shaft
Reticulated water under
DWP (developer funded)
Applicable servicing arrangement
TMS
CCTV
ODPE
HDPE
PVC
DWP
Terminal maintenance shaft
Closed circuit television
Outside diameter polyethylene
High density polyethylene
Polyvinyl chloride
Developer works process
S
W
Water service
Water meter
Proposed sewer
Proposed water
Existing sewer
Existing water
Typical servicing arrangements multi-tenement/lot development (3-19 lots) - lots < 500m2