. Multi-tenement/lot development (3-19 lots) 2 Reticulated sewer at 1.0m offset under DWP (developer funded) Tapping to be sized for whole development or separate tappings to be located in common property Existing point to be CCTV inspected FP 3 3 Reticulated water under DWP (developer funded). Extended water across frontage 1 1 3 FP Existing point to be CCTV inspected Applicable servicing arrangement 3 2 Individual water lines to extend into each Lot 6 5 Owners corporation common house drain in accordance with VBA regulations New tapping – two meters located in the Common Property in a mainfold Legend 1.Sewer alignment, connection point and common house connection drain locations are subject to lot control. 2.The examples shown are where all lots to be sub-divided are less than 500m2. 3.Where any lot(s) are above 500m2, then construction of full Barwon Water assets apply. 4.Existing single water services to be replaced if galvanised. 5. The house connection point must be extended into each allotment. 6.Easement widths available in Land Development Manual (LDM). Disclaimer: Barwon Water does not accept any responsibility to investigate the assumptions made, or the information you have provided, or if after further investigation those assumptions or further information provided are proved erroneous. FP MT SV C/W HC MS 1 Existing tapping Existing point to be CCTV inspected Applicable servicing arrangement Notes Issue date: January 15, 2015 Provide common house connection drain to service all lots 7 4 SV Minimum 2.0m easement in favour of Barwon Water Existing point to be CCTV inspected 8 2 THROUGH STREET 100mm PVC Easement is to be 2.0m in favour of Barwon Water 2 Individual meters required for developments up to six lots, otherwise bulk meter and sub-meters may be provided (as shown) *Owner’s corporation is required to encumber all lots equally within the Subdivision COMMON PROPERTY *Owner’s corporation NOT permitted COMMON PROPERTY 1 Fire plug Mont tap Stop valve Carriage way House connection Maintenance shaft Applicable servicing arrangement TMS CCTV ODPE HDPE PVC DWP Terminal maintenance shaft Closed circuit television Outside diameter polyethylene High density polyethylene Polyvinyl chloride Developer works process S W Water service Water meter Proposed sewer Proposed water Existing sewer Existing water Typical servicing arrangements multi-tenement/lot development (3-19 lots) - lots < 500m2 . Multi-tenement/lot development (3-19 lots) 5 *Owner’s corporation NOT permitted Reticulated sewer at 2.0m offset under DWP (developer funded) when located in front yard Existing sewer HC point to be CCTV inspected Tapping and Flushing Point to be located clear of existing or proposed driveway(s) 3 6 *Owner’s corporation NOT permitted New sewer HC points cut into existing sewer by Barwon Water approved plumber *Owner’s corporation NOT permitted Existing sewer HC point to be CCTV inspected Reticulated sewer at 1.0m offset under DWP (developer funded) Easement is to be 2.0m in favour of Barwon Water Water main to extend across the entire frontage 63 OD HDPE Easement is to be 3.0m in favour of Barwon Water 2 1 DEAD END STREET 4 1 2 3 1 2 3 Reticulated water under DWP (developer funded) FP FP SV MT 150mm PVC Tappings to be provided for each lot for development types without common property Applicable servicing arrangement Applicable servicing arrangement Notes Legend 1.Sewer alignment, connection point and common house connection drain locations are subject to lot control. 2.The examples shown are where all lots to be sub-divided are less than 500m2. 3.Where any lot(s) are above 500m2, then construction of full Barwon Water assets apply. 4.Existing single water services to be replaced if galvanised. 5. The house connection point must be extended into each allotment. 6.Easement widths available in Land Development Manual (LDM). Disclaimer: Barwon Water does not accept any responsibility to investigate the assumptions made, or the information you have provided, or if after further investigation those assumptions or further information provided are proved erroneous. FP MT SV C/W HC MS Issue date: January 15, 2015 Fire plug Mont tap Stop valve Carriage way House connection Maintenance shaft Reticulated water under DWP (developer funded) Applicable servicing arrangement TMS CCTV ODPE HDPE PVC DWP Terminal maintenance shaft Closed circuit television Outside diameter polyethylene High density polyethylene Polyvinyl chloride Developer works process S W Water service Water meter Proposed sewer Proposed water Existing sewer Existing water Typical servicing arrangements multi-tenement/lot development (3-19 lots) - lots < 500m2
© Copyright 2024 ExpyDoc