SVOM: A Chinese-French GRB mission Olivier Godet/Guillaume Nasser On behalf the SVOM team Space-based multi-band Variable Object Monitor Science rationale GRB phenomenon GRB physics Diversity and unity of GRBs (high-z GRBs & sub-luminous GRBs) Acceleration and nature of the relativistic jet Radiation processes The early afterglow and the reverse shock GRB progenitors The GRB-supernova connection Short GRB progenitors Cosmology Cosmological lighthouses (absorption systems) Host galaxies Tracing star formation Re-ionization of the universe Cosmological parameters Fundamental physics Origin of high-energy cosmic rays Probing Lorentz invariance Short GRBs and gravitational waves Possible synergy (horizon 2020): (electromagnetic) JWST, E-ELT, ALMA, SKA, LOFAR, CTA (non-electromagnetic) Advanced Ligo/Virgo, IceCube, KM3 SVOM observation strategy Orbit: LEO (625-650 km) with an inclination of ~30 o & Anti-Sun pointing Avoidance of the Galactic Centre, the Moon & Sco X-1 Duty cycle per orbit ~ 56% due to SAA crossing & Earth crossing Most of the GRBs (up to 75-80%) detected by SVOM to be well above the horizon of large ground based telescopes all located at tropical latitudes SVOM observation strategy Orbit: LEO (625-650 km) with an inclination of ~30 o & Anti-Sun pointing Avoidance of the Galactic Centre, the Moon & Sco X-1 Duty cycle per orbit ~ 56% due to SAA crossing & Earth crossing Most of the GRBs (up to 75-80%) detected by SVOM to be well above the horizon of large ground based telescopes all located at tropical latitudes SVOM science payload a combination of a multi-wavelength space payload with a dedicated ground NIR/optical instruments Ground segment Space payload GWAC GFT-1 OFT Robotic telescopes T0 = detection of a GRB by ECLAIRs ECLAIRs (< 12' @ 90% c.l.) VT, OFT, GFT MXT 20’’ Alerts sent via VHF network spread around the SVOM orbit (< T0 + 1 min) Pointing: < T0 + 5 min Energy coverage (4-150 keV) (0.2-10 keV) (V & R) Prompt phase Afterglow phase (B,V,R,I) (B,V,R,I,J,H) (low-resolution spectro) Intensity (50 keV- 5 MeV) Excellent follow-up of the prompt emission from optical to MeV & the AG emission from optical to X-rays Broad-band coverage for non-GRB science through ToOs and key programs ECLAIRs: the GRB trigger camera Estimated GRB detection rate: ● ● GRB detection rate: ~ 70 long GRBs/yr (using Butler et al. 2010 work) + ~10% to take the short GRB population into account 0.96 Comparison of sensitivity for the GRB prompt emission ECLAIRs low-energy threshold = 4 keV ECLAIRs expected to be more sensitive than Swift-BAT for GRBs whose peak energy is < 20 keV z>5 ~4% of ECLAIRs GRBs predicted to be high-z GRBs (z > 5) ECLAIRs: the GRB trigger camera I-PI = IRAP Maîtrise d'oeuvre = CNES APC CEA-Saclay (+ UGTS) IRAP •Mask aperture = 50% •Mask-to-detection plane distance = 36 cm •Geometrical surface ~1000 cm2 •Effective Area @ 4keV = 150 cm2 •FOV = 2 sr •Energy range = 4-150 keV •Localisation accuracy < 12 arcmin (90% conf.) ECLAIRs: the GRB trigger camera I-PI = IRAP Maîtrise d'oeuvre = CNES Contribution IRAP detection plane DPIX / front-end electronics APC CEA-Saclay (+ UGTS) IRAP •Mask aperture = 50% •Mask-to-detection plane distance = 36 cm •Geometrical surface ~1000 cm2 •Effective Area @ 4keV = 150 cm2 •FOV = 2 sr •Energy range = 4-150 keV •Localisation accuracy < 12 arcmin (90% conf.) ECLAIRs Instrument Center Suivi des opérations Génération des commandes Surveillance moyen et long terme Etalonnage de l’instrument Maintien du logiciel de bord Support aux scientifiques (BA) Chercheurs et ITA potentiellement impliqués sur le projet : O. Godet, J. Platzer, P. Ramon, W. Marty, E. Pallier ECLAIRs: DPIX ● ● ● ● ● DPIX: ECLAIRs detection plan Gamme : 4 – 150keV 80x80 schottky CdTe pixels (≈1000cm2) cooled @ -20°C 200 XRDPIX Front-End Electronics (ELS) provides to the DPU calibrated events (time, energy) XRDPIX Schedule: Building/test of a proto-DPIX (1600 pixels + 2 ELS) : 2014-2016 Fabrication XRDPIX FM : 2014-2016 ECLAIRs: DPIX Chef de Projet R. Pons 20% 1 Responsable Scientifique local J-L Atteia 8 Equipe Système C. Amoros 1, K. Lacombe 1 D. Rambaud 1, V. Waegebaert R. Pons 1, J-L Atteia 8 O. Godet 6 Responsable Simulations et étalonnages O. Godet 6 Assistante de Projet P. Ramon 3 20% Détecteurs O. Godet 6 Critères de tri G. Nasser 7 Banc de tests CDD Electronique 40% V. Waegebaert Hybridation 60% K. Lacombe 1 ASIC CEA O. Gevin F. Lugiez Support CNES 4 Banc de tests B. Houret & Expertise K. Lacombe 1 CDD Assurance Produit S. Bordon 20% Prestataire Architecture électronique Electronique Analogique J-A. Martin3 CDD 3 4 Expertise J-L Atteia 8 O. Godet 6 G. Nasser 7 Câblage Prestataire Tests/ Intégration CDD 4 Electronique Numérique/EGSE 5% D. Rambaud 1 Mécanique 10% C. Amoros 1 3 V. Waegebaert Hybride 3 3 Architecture mécanique C. Amoros 1 Enrobage/ MGSE 4 E. Lecomte G. Rouaix 1 Thermique Sous-traitance Intégration CDD 3 AIT/AIV R. Pons 1 Logiciels 10% W. Marty Prestataire Etalonnages Electronique Numérique AIT/AIV G. Nasser 7 C. Amoros 1 K. Lacombe 1 B. Houret 3 J-A. Martin3 CDD J-L Atteia 8 O. Godet 6 G. Nasser 7 Support CNES Banc de calibration CDD 3 CEM Expertise Support CNES P. Mandrou Composants Micro X-ray channel plate Telescope MXT = refine the GRB position & sampling of the X-ray flux over time I-PI = CEA-Saclay Maîtrise d'oeuvre = CNES Univ. of Leicester (UK) IRAP contribution DPU (Automatic GRB localization) LAM Simulated MXT light-curves based on Swift-XRT GRB light-curves with different brightness ● ● ● ● Chef de projet : D. Rambaud Resp. scient. : O. Godet Positioning accuracy (90% cl.l) < 17'' for 50% of the detected GRBs CEA-Saclay MPE & Univ. Tubbingen (Germany) Detection of virtually all ECLAIRs GRBs provided a fast repointing (1st orbit) Detection of the X-ray AG emission up to T0+105 s provided integration over a few orbits Sensitivity (5σ) = 10-10 erg cm-2 s-1 @ 10 s 2x10-12 erg cm-2 s-1 @ 10 ks energy range = 0.2-10 keV Effective area ~ 50 cm2 @ 1.5 keV • FOV = 64’ x 64’ • Readout time = 100 ms • FWHM ~ 75 eV @ 1keV • focal length = 1 m • • Optical instruments Refinement of the GRB position, sampling of the X-ray flux over time & constraint of the GRB redshift Limiting magnitude GFT VT GWAC* 21.5 (R) in < 1 min (10σ) ~ 23.4 (R) in 1 ks (10σ) ~ 23 (V) in 300s (10σ) ~ 15 (R) in 10s (5σ) OFT VT 1 minute * During full moon nights The intrinsic cumulative GRB apparent optical afterglow distribution OCEVU Fast Telescope Collaboration France-Mexique ● Télescope robotique de 1.2 m (TBC) à installer à San Pedro Màrtir (Mexique) ● Spectral coverage = B, V, R, I & J, H ● Maybe a low resolution optical spectrometer? ● FoV = 21' x 21' ● Possible funding from OCEVU (on-going) L’infrastructure de l’observatoire robotique comprend : le bâtiment, le dôme, et les équipements nécessaires au fonctionnement du télescope et au contrôle de son environnement. Le télescope équipé est un ensemble comprenant un télescope robotique alt-azimutal de type Cassegrain équipé d’un miroir primaire de 1,2 m (TBC), la bonnette avec les optiques imageantes pour les 2 voies, visible et IR. OCEVU Fast Telescope Contribution IRAP Centre de contrôle associé à l’observatoire. Le système conduit les opérations de manière totalement autonome et automatisée sans interaction humaine. Expertise acquise sur les télescopes TAROT. ● ● Caméra proche IR CAGIRE Chercheurs et ITA de l’IRAP impliqués sur le projet : • J.L. Atteia, A. Klotz, J.F. Le Borgne • E. Pallier (resp. Développement logiciel) J. Platzer • A. Burlacu (stagiaire) • • Activités réalisées : analyse des besoins et préparation d’un plan de développement préliminaire Activités en cours : spécifications détaillées du logiciel et mise en place des outils de développement logiciel Status of the mission ● Février 2012 : gel du projet en France ➢ Les développements instrumentaux les plus critiques restent soutenus par le CNES Février 2013 : proposition Chinoise de fournir le lanceur et la plateforme satellite ● ● Mars 2013 – Mars 2014 : Instruction du dossier « SVOM-2 » par la France ➢ ➢ ➢ Instruction scientifique : Groupe Astro (04/13 et 05/13), CERES (06/13) et CPS (07/13): OK ! Instruction technique : réunion en Chine (04/13) point clé au CNES (09/13), puis revue “DeltaPRR” en Chine (10/13): OK, mais livraison de la charge utile française pas possible avant 2018 Instruction politique en cours… plusieurs réunions France-Chine ont eu lieu dans les dernières semaines ou sont prévues jusqu’à fin Mars ● Résultat attendu au séminaire de prospective du CNES (20/03/2014) ● Lancement dans le créneau 2020-2023
© Copyright 2025 ExpyDoc