TRACTION ROLLING STOCK OPERATION 1. HISTORY: TRO Branch in this Division has become functional in the year 1989. New Delhi – Madras Grand Trunk express (2616 Up) was worked with AC electric locomotive on 11.09.1989 from Nagpur to Madras which was the first Mail Express train run on Ac traction on Nagpur Division. 2. ORGANIZATION: The Electric (TRO) organization consists of: (i) SN. 01 02 Gazetted Organization : Incumbent Designation Shri S. K. Shukla Sr.DEE/TRO Shri J. P. Mishra DEE/TRO (ii) Rly Ph. No. 55290 55292 P&T No. 0712-2564979 0712-2540884 Mail Add. [email protected] [email protected] Non Gazetted Organization: SN. Incumbent Design. Rly No. CUG No. 01 02 03 04 05 06 Shri D. S. Bais Shri Rajesh Yadav Shri S. Bhattacharyya Shri Richard Andrews Shri V. K. Gupta Shri M. K. Arrora CLI/HQ CLI/Plg. CTA Ch. OS TLC/SPM CTLC 55296 55296 55294 55270 55296 55437 9503012014 8600048212 9503012050 9503012048 9503012046 9503012037 07 08 09 10 11 12 13 14 15 16 Shri S. H. Mani Shri M . P. Singh Shri Karimullah Haq Shri Susheel Tiwari Shri Vivek Chate Shri Venugopal Rao Shri Ajay Singh Shri V. P. Age Shri Venketesharlu Shri Akhilesh Kumar CCCOR CCCOR/NGP CCCOR/BPQ CCCOR/AMF DI/AQ (CC/NGP) Div. RR Inc. RR Inc./NGP RR Inc./BPQ (new) RR Inc./BPQ (Old) RR Inc./AMF 57276 55278 53240 57440 56239 --55287 53213 53210 57425 9503012025 9503012031 8600047655 8600048222 8600048121 9503012039 9503012079 8600047715 8600047628 7389918835 Non Gazetted Staff Position Category Running Staff Loco supervisors Running room and lobby staff TRS staff Ministerial staff TOTAL Sanction Man on Vacancies Strength Roll 1652 1428 224 106 86 20 All surrendered staff re-deployed 57 55 2 51 40 11 1873 1615 258 Running Staff: (As on 30.06.2014) Sanction Strength 177 44 559 106 753 13 1652 Category M/Exp Driver Passenger Driver Goods Driver Shunter Asst Driver T/Wagon Driver Total 3. ACTIVITY CENTERS: 3.1 Lobbies & Running Room : Man on Roll 166 31 485 94 639 13 1428 Vacancies 11 13 74 12 114 00 224 There are 03 Lobbies in the division located at Nagpur, Amla, Ballarshah, & 05 Running Rooms at Nagpur, Amla, Ballarshah, Majri, Ghugghus, and 03 Rest Rooms located at Dharakhon, Teogaon and Wardha. Nagpur Crew Booking Lobby Occupation capacity of Running rooms: Location NGP AMF BPQ MJRI GGS No. of beds 37 35 171 17 12 Avg. Occupancy 54 51.5 215 28 07 Category A A A B C LOBBIES & RUNNING ROOMS OF DIVISION Lobbies: 1. Nagpur 2. Ballarashah 3. Amla Running Rooms: 1. Triveni Running Room, Nagpur 2. Tapti Running Room, Ballarshah 3. Narmada Running Room, Amla 4. Majri 5. Ghuggus Rest Rooms: 1. Dharakhoh 2. Teegaon 3. Wardha Crew Beats: LOBBY Mail / Exp. NGP-BPL NGP - 393 KM ET-NGP AMF - 297 KM NGP-BSL - 393 KM NGP-ET - 297 KM NGP-BPQ - 211 KM NRKR-AMI - 138 KM NGP-ET - 297 KM BPQ -- NGP-AMI - 177 KM Pass. NGP-AMF - 168 KM AMF-ET - 130 KM NGP-BPQ - 211 KM AMF-CWA - 115 KM NGP-BD - 174 KM AMF-NGP - 168 KM AMF-BD -- - 220 KM NRKR-AMI - 138 KM Goods NGP-BPQ - 211 KM AMF-ET - 130 KM BPQ-BD NGP-BD - 174 KM AMF-BPL - 222 KM BPQ-NGP NGP-BSL - 393 KM AMF-NGP - 168 KM BPQ- G NGP-AMF - 168 KM AMF-DGG - 368 KM NGP-ET - 297 KM NRKR-AMI - 138 KM NGP-DGG - 202 KM - 228 KM - 211 KM - 250 KM BPQ- ADB - 148KM 3.2 Trip Shed/Ajni: The division is having Trip Shed at Ajni headed by Senior Section Engineer. In addition to this, skeleton maintenance staff is also available at Ballarshah and Nagpur, being interchanging points. 3.3 Drivers Training Center (DTC)/Ajni: The Driver’s Training Center at Ajni is conducting various training courses to enhance the safety standards, quality of driving technique and trouble shooting knowledge of AC loco Running staff. Recently a new training module ‘GYAN KASAUTI’ which was introduced at S.C.RLY has been also introduced in our division. 4. PERFORMANCE STATISTICS Sr. SUBJECT No 1.0 Safety performance 2.0 a) Accident on account of running staff b) Signal passing at danger c) Fire in loco on account of loco operation Asset Failure a) Loco failures (TB) i) CR on CR ii) FR on CR TARGET Avg. Up to May % age May 2013 May 2014 0 0 1 0 100.00 0 1 0 1 -100.00 0 0 0 0 0.00 1 0 1 0 --- 10 7 16 12 25.0 5 2 8 6 25.0 18 13 30 28 6.67 2 4 2 11 - 450.0 2013 2014 Variation b) Equipment failures (TB) j) CR on CR ii) FR on CR c) Stalling cases (TB) Sr. SUBJECT No 3.0 Avg. Up to May % age May 2013 May 2014 6 11 9 15 - 66.67 0 0 0 1 -- a) Goods (Km/loco/day) 674 400 690 473 -31.45 b) Coaching (Km/loco/day) 1060 1019 1061 1024 -3.49 Operating Performance a) GTKM’s (P+G) in millions 4151 4426 4189 4426 5.66 b) Engine Kms (P+G) in lakhs 27 20 54 43 -20.37 87.54 85.25 87.73 86.67 -1.19 TARGET 2013 2014 Variation Punctuality loss cases i) CR on CR ii) FR on CR 4.0 5.0 ^ Punctuality loss on account of Trip sheds / TLC / Loco Pilots/ LIs Asset Utilization c) 10 hrs performance of crew d) Pre departure detention of crew at NGP 1.19 0.59 1.27 0.57 34.48 AMF 0.54 1.00 0.57 0.57 -- BPQ 1.31 1.01 1.37 0.59 39.18 e) Light engine movement (EKM) f) Detention of train at crew changing 21713 2057 22703 2160 90.49 Sr. SUBJECT No 6.0 7.0 ^ May 2013 May 2014 NGP 0.55 AMF TARGET Avg. Up to May % age 2013 2014 Variation 0.33 0.54 0.32 40.74 0.28 0.31 0.29 0.29 -- BPQ 1.00 0.38 1.01 0.38 37.70 Average speed of Goods train 32.71 32.97 32.07 33.67 4.99 a) Coaching trains 18.40 18.35 18.40 18.35 0.27 b) Freight trains 8.50 7.41 8.50 7.41 12.82 a) No of TI of coaching locos 152 136 302 290 -3.97 b) No of TI of freight locos 60 43 108 87 -19.44 c) No of STR of coaching locos 3 4 7 6 -14.29 613 598 1232 1262 2.44 Specific energy consumption Maintenance 8.0 management of Trip Shed d) No of loco given fit from trip shed / yard / station 5. HIGHLIGHTS i Specific Energy Consumption: SEC has been reduced from 8.50 to 7.41 up to May’14 as compared with the same period of the previous year i.e. a reduction of 12.82 %. During the month of May-14 summary of energy consumption and regeneration in 3- phase locos is as under: (Data taken from NGP division Loco Pilots): ii SERVICE CONSUMPTION (IN KWH) REGENERATION (IN KWH) % ENERGY REGENERATED SAVINGS (IN Rs.) COACHING 4585628 924884 20.17 74,63,814 GOODS 3281557 572043 17.43 46,16,387 TOTAL 7867185 1496927 19.03 1,20,80,201 Stalling of Trains Increase in sectional speed from 60 to 70 kmph in the following sections between has benefitted in minimizing stalling during monsoon. Sr No. 1 2 3 4 Block Section SLOR-SEGM CHJC-WR CKNI-NGI DMN-DIP Section NGP-WR BPQ-WR BPQ-WR WR-BD Location 770/19 to 763/27 763/01 to 759/01 818/24 to 815/01 707/11 to 704/09 Action Initiated: During monsoon “Monsoon Mantras” have been followed by all train running staff. Improved packing of track at all points & crossings at WR yard resulted into reduction of stalling in CHJC – WR section. Admitting trains on main line at 30 Kmph instead of yard at WR. A meeting with Loco Inspectors was organized on 10.06.2014 regarding prevention of stalling. Where it was decided to counsel all LPs as per circulated Loco Pilot Bulletin No. 194 & 195 also pictorial gradient chart of stalling prone section. A pictorial flex board of critical stalling prone section displayed at lobbies and LIs deputed round the clock to upgrade knowledge how to negotiate on gradients. Pre-intimation / Warning (stalling) boards for LPs at stalling prone locations have been erected to pre-warn the LPs before entering graded section. Increase in speed from 60 to 70 KMPH of Sumo rake in following sections in 2 – 3 Kms in length for achieving attacking speed to negotiate the gradient. Sr No. Block Section Section Location 1 BOK-BTBR WR-NGP 807/10-809/18 2 BBTR-GDYA ET-NGP 814/2-815/28 3 GDYA-DHQ ET-NGP 815/28-823/0 4 MJY-BZU ET-NGP 848/16-851/28 5 BZU-MALK ET-NGP 851/28-858/12 6 MALK-BYS ET-NGP 858/12-864/30 7 BYS-AMF ET-NGP 864/30-865/24 Division has also identified following block sections for increase of attacking speed of SUMO (Box’N’/ Box’N’/HL) rakes from existing 60 kmph to 70 kmph in the stretches having 60 Kg. rails as shown below. (Proposal has been sent to GM/CR/NGP by DRM/NGP vide L. No. NGP / G.293/TRO dtd. 21.10.2013. SN Block Section Section 1 2 3 BTBR-GMG NGP-GNQ DOH-POX BD-NGP NGP-ET NGP-ET Sub Section in which speed to be increased 809/18-815/10 1039/17-1035/5 792/25-789/1 Action Plan: 6. Neutral section at KM No. 876/18-20 between AMF- JKR and KM No. 830/26 between GDYA-DHQ down direction to be shifted. Proposal has been sent to TRD vide this office L. No. NGP/TRO/Genl-22 dtd. 14.06.13 and estimate received for the work. Correction required in load table of WTT 98 is sent to HQ vide L.NO. NGP/TRO/EST/28A on dated 02.06.14. MEASURES TAKEN FOR SYSTEM IMPROVEMENT Operation: A pocket size pamphlet - "MONSOON MANTRAS" was prepared for guiding the staff concerned with train operation to prevent stalling of loaded goods trains in critical sections during monsoon and distributed to supervisors of all departments and to all goods loco pilots. A pamphlet viz. 'Operation 50+' was issued to all staff concerned with train operation to achieve average speed of 50+ Kmph of Millennium and Container trains. Dynamic Dossier of LPs for performance category has been introduced as Platinum, Gold and Silver. Data generation for wages purpose through CMS is being monitored. Use of WAG-9 loco in place of WAG-7 loco as banker in ghat section. Energy Conservation: A pocket sized pamphlet titled "ऊर्जा संरक्षण मंत्र" was published for all running staff & all concerned staff. Prepared stickers to educate Loco Pilots to use regenerative brake to the maximum possible extent in 3 phase locos by which not only 20 - 30% electricity regenerated but also reduce the wheel shelling in coaches. These stickers are pasted in all 3 phase locos plying over the division. Duties of Sectioin Controllers regarding Energy Conservation have been displayed in control office, LPs/LIs in lobbies & running rooms & supervisory staff. “Green Card & White card” has been introduced for LPs, to record energy generation / consumption of 3 phase locos & consumption of conventional locos. Data collected through ‘Green Cards & White Cards’ in the month of May has revealed that 17.43% energy is regenerated in freight trains and 20.17 % in coaching trains. Star rating of best energy saver for loco pilots has been started and displayed at Lobbies to encourage the staff, Loco pilots are categorised as per their contribution in energy saving i.e. 5 star (saves 30% and above) 4 star (saves 20% - 29%) 3 star (saves 10% - 19%) 2 star (saves 5% - 9%) 1 star (saves 1% - 4%) Trip Ration in KWH for various types of Loco, Load and Section combinations have been prepared and distributed to loco pilots to save energy by improving driving technique. Best energy conservators are being rewarded at divisional level by DRM to motivate the staff. Running Room & Lobbies: Complete management of Nagpur, Ballarshah, Majri & Amla running rooms have been outsourced. As a result 27 posts of running room have been rendered surplus and surrendered. Subsidized meal facility to all running staff has been made available in all running rooms of this division. Nagpur room running is upgraded with- New facelift of front area, Kuti, Yoga Garden umbrella, fountain, gym ,washing machine, Library, garden lights, rain water harvesting LED display of safety and troubleshooting aids. Solar geysers are also being provided and ISO 9001:2008 certification for complete management services is underway. Nagpur lobby is upgraded with more seating area for healthy environment. A canteen “JAYAKA” managed by running staff is started in Nagpur lobby. All running rooms have been provided reception desk. Computerized check-in & check-out facility has been introduced in all running room of Nagpur Division. It has helped in identifying vacant beds as well as accountal for subsidized meal. All running rooms are provided with gym equipment. Washing machines & Micro wave oven have been provided at all running rooms. Drop box is provided in lobby to receive PASS / PTO applications of running staff and deliver passes in lobby itself. Out sourcing the activities of loading & unloading of loco pilot & guards line boxes has been implemented in division. LED Monitor has been provided in all Lobbies and Running Rooms for visual display of locomotive information, trouble shooting and safety related items. Mini Common Line Box: Common line boxes introduced for all coaching & freight service. Out sourcing activities of loading & unloading of loco pilot & guards line boxes introduced in the division. Signal Passing At Danger (SPAD) Year Mail/Exp. Train Goods Train 2012-13 2013-14 2014-15 up to May-14 --- 01 -- 02 02 01 SPAD counseling: A pocket sized pamphlet titled “laj{kk&ea=” was published as a case study for all running staff regarding signal passing at danger. Family members of running staff were counseled about the consequences of SPAD and importance of rest at home in prevention at NGP on 09.04.14. Approx. 53 family members were counseled about their role in providing uninterrupted rest to running staff and a pamphlet regarding nature of duty also distributed among them. A pictorial flex board regarding duties of ALPs for opening of RS Flap Valve to prevent SPAD displayed at all lobbies. 10 Hrs. Performance Apr-13 Apr-14 May-13 May-14 87.93 88.10 87.54 85.25 Action Plan: 1. 2. 3. 4. 5. 6. 7. Close watch on duty Hrs. Ensuring correct ordering. Monitoring of en-route detention by CC Control. By booking shuttling crew between NGP-AQ during bunching. By planning relief for crew during over Hrs. Extended run as crack between NGP-ET & NGP-BSL section. Close monitoring on worst section affecting 10 hrs. (NGP-BD, BPQ-BD & NGPBPQ). Operation Efficiency: Three multiple bankers introduced against 1 single + 2 multiple bankers in TEO - CCD ghat section – resulted in the improvement of average speed from 23 to 34 Kmph and increase in sectional capacity, also improvement in 10 hrs performances due to reduction in detention for MU banker. Speed of M/E trains in the ghat sections of MJY – DHQ & CCD – TEO while descending the ghat increased from 60 Kmph to 75 Kmph. Two minutes gain in the running time per train has been noticed during these trials. WAG-9 loco as Banker Engine in DHQ-MJY-DHQ section is being carried out and found that 675 to 700 units are being generated in each trip while descending the ghat up to 3500 T load (WAG7 single loco assists only 2500T). Working of DPWCS fitted locos at TEO -CCD-TEO ghat section as banker and at GGS coal circuit found satisfactory. Complete management of all Running Rooms has been outsourced and subsidized meal introduced. Which has resulted in more satisfaction and hassle of carrying ration by running staff in eliminated. AMF & NGP running rooms were given best maintained running rooms shield in the year 2010 and 2013 respectively. Also these were selected in best 5 running rooms at Railway Board level in 2011-12 and 2012-13. Previous year BPQ (Tapti) running room is being offered for contest by division in railway board level. TRO has bagged shield for best maintained Nagpur lobby in the year 2013-14. Manpower Planning and Cost control: 48 Call boys surrendered after introduction of CUG Sims resulted in saving of Rs 1.114 crores per year after deducting payment of CUG bill to running staff. 99 Box boys surrendered after introduction of outsourcing of line box loading / unloading resulted in saving of Rs 2.67 crores per year after deducting contract bill. After outsourcing of BPQ (Tapti & Godavari), NGP (Triveni) and AMF (Narmada) running room with subsidized meal. 56 running room staff have been surrendered resulting in saving of Rs 33.02 Lacs per year after deducting contract bill. Two posts of Driver Instructor created and process of selection is going on. 6 posts of LIs filled up and 12 additional posts of LIs also created and process of selection is going on. ****
© Copyright 2024 ExpyDoc