NDT REQUEST NOTES SPO issues certified NDT procedure 1. - NDTSL designed procedures, - aircraft NDT publications (–36), or - OEM NDT Procedures. Yes Is an approved Specific NDT Procedure or suitable General NDT Procedure available? (NOTE 1) No Requirement for new NDT procedure Request Engineering disposition (NOTE 2) Approved Specific NDT Procedures are written NDT procedures developed to test a specific component or test area. Examples of approved Specific NDT Procedures are: No If an NDT method has been nominated in an AAP or equivalent documentation, approved by the Design Acceptance Representative (DAR), then a General NDT Procedure is considered adequate to perform the test. No procedure required Acceptable means of nomination: Perform a LPT, or Perform testing IAW ASTM E1444–95A. Yes Unacceptable means of nomination: Perform an NDT. When an AMO or SPO requests the use of a General NDT Procedure, a Level 2 or Level 3 NDT Technician will determine the appropriate General NDT Procedure for the test being considered in accordance with paras 7 to 11. Level 2 NDT Tech performs NDT Yes Discontinuity detected? NDT Tech completes the corrective action field in the recording and certification system and raises a second unserviceability No NDT Tech completes the corrective action field in the recording and certification system AMO to seek resolution 2. Refer to Web Forms AE298 – NDT Task Specification Form.
© Copyright 2024 ExpyDoc