A Noise Impact Assessment was prepared to analyze the effects of highway traffic noise on communities within
the project limits. Sound barriers were evaluated as a way of reducing or eliminating noise impacts to the
affected public and were found to be feasible.
Forty-three (43) sound barriers were found to be feasible and reasonable to reduce noise impacts.
Sound barriers are constructed within Georgia DOT right-of-way, not on private property.
The maximum height of a noise wall is 30 feet.
Sound barriers must provide at least a 5 decibel reduction for the locations affected by noise impacts.
The proposed sound barriers would be constructed of a light-weight concrete material with a textured
finish, as shown in the photo below.
The sound barriers may also be earthen berms or combination berm/wall systems.
Georgia DOT is seeking input from individuals who benefit from the construction of sound barriers.
The sound barriers will not be constructed if a majority of the benefited public does not want the sound
barrier.
Please provide your vote on the sound barriers by completing the voting ballot available at this meeting.
LEGEND
SIX
ES
RD
Holly Springs
Sixes Rd.
General-Purpose
Interchange
Managed-Lane
Interchange
OW
LAKE PKW
TOWNE
Slip Ramp Southbound
Y
CHEROKEE
Slip Ramp Northbound
Towne Lake Pkwy.
92
Woodstock
Old Alabama Rd.
Main Arterial/
Collector
ALABAMA RD
OLD
5
75
Interstate
Highway
92
Hickory Grove Rd.
SHA
Wade Green Rd.
•Extension of existing HOV system to
RD
D
FERRY R
WAD
E
GREEN
RD
LLS
BE
Chastain Rd.
Chastain Rd.
RD
N
CANTO
RD
Bells Ferry Rd.
Big Shanty Rd.
IN
41
A
ST
A
Big Shanty
Rd.
CH
managed lane tie-in
BARRETT PKW
Y
Barrett Pkwy.
Barrett Pkwy.
COB
B
PK
W
Y
I-575
•Managed lane interchanges are
CTR
CN
NE
CA
NTO
N
Kennesaw
LO
WF
OR
D
L
575
•Reversible managed lane system on
I-75 would consist of two lanes from
I-285 to I-575 and one lane from I-575
to Hickory Grove Rd.
Shallowford Rd.
Acworth
PROJECT
LOCATION
AL
LG
Canton Connector
D
OO
proposed on I-75 at I-285, Terrell Mill
Rd., Roswell Rd., I-575, Big Shanty Rd.
and Hickory Grove Rd.
RD
120
RO
SW
EL
L
RD
PKWY
Roswell Rd.
. MAR
IETTA
S.SMarietta
Pkwy.
PK
RS
FER
RY
WY
DELK
RD
Delk Rd.
RD
WY
PK
E
RR
TE
SE
I-575 from I-75 to Sixes Rd. would
consist of one lane in the median
er
R iv
LL
tta
ha
h
Terrell Mill Rd.C
41
285
RD
L
EL
ST
AU
•Slip ramp access on I-575 located
D
WINDY
LL
HI
Y
N
WI
I-285
GE
RID
WY
PK
AKER
SM
RD ILL
WindyRHill Rd.
D
ER
WD
PO
GS
RIN
SP
•Reversible managed lane system on
RD
RD
BB
CO
COBB
RD
E
W
PO
Marietta
ELL
SW
RO
LOW
ER
MILL
DALLAS HWY
c he
e
120
oo
N. Marietta
N. MARIPkwy.
ETTA
Akers Mill Rd.
Smyrna
in the vicinity of Barrett Pkwy,
Shallowford Rd. and Sixes Rd.
Rev. 3/10
S
FULTON
BB
CO
DR
75
285
0
1
3Miles
THE SELECTED ALTERNATIVE
•Two reversible managed lanes on the west side of I-75
between I-285 and I-575
•One reversible managed lane on I-75 between I-575 and
and Hickory Grove Rd.
•One reversible managed lane on I-575 between I-75 and Sixes Rd.
TOLLING
•Variable pricing employed to manage the use of the lanes
at 45 mph free flow speed
•Open Road tolling
•Use of transponders and video tolling
•No toll booths
•The Managed Lane system will be operated as an
Express Toll Lane (ETL) system
I-75 TYPICAL SECTIONS
PROPOSED
I-75 REVERSIBLE
MANAGED LANES
10'
SHLDR
12'
12'
2'
SHLDR
EXISTING
I-75 SOUTHBOUND
GENERAL PURPOSE LANES
ON BRIDGE
EXISTING
I-75 NORTHBOUND
GENERAL PURPOSE LANES
I-75 TYPICAL SECTIONS
BETWEEN DELK ROAD AND SOUTH 120 LOOP
PROPOSED
I-75 REVERSIBLE
MANAGED LANES
10'
SHLDR
ON WALLS
12'
12'
2'
SHLDR
EXISTING
I-75 SOUTHBOUND
GENERAL PURPOSE LANES
EXISTING
I-75 NORTHBOUND
GENERAL PURPOSE LANES
MECHANICALLY
STABILIZED
EARTH WALLS
I-75 TYPICAL SECTIONS
BETWEEN DELK ROAD AND SOUTH 120 LOOP
I-75 AND I-575 TYPICAL SECTIONS
EXISTING
I-75 SOUTHBOUND
GENERAL PURPOSE LANES
PROPOSED
I-75 REVERSIBLE
MANAGED LANE
10'
SHLDR
12'
EXISTING
I-75 NORTHBOUND
GENERAL PURPOSE LANES
4'
SHLDR
I-75 TYPICAL SECTION
NORTH OF I-575
EXISTING
I-575 SOUTHBOUND
GENERAL PURPOSE LANES
EXISTING
I-575 NORTHBOUND
GENERAL PURPOSE LANES
PROPOSED
I-575 REVERSIBLE
MANAGED LANE
10'
SHLDR
12'
4'
SHLDR
I-575 TYPICAL SECTION
NORTH OF I-75
Roswell Road Managed Lane
Interchange (AM Operation)
This is an artist’s rendering and may not be representative of the final design.
13
Roswell Road Managed Lane Interchange (closed for reversal)
This is an artist’s rendering and may not be representative of the final design.
14
Roswell Road Managed Lane
Interchange (PM Operation)
15
This is an artist’s rendering and may not be representative of the final design.
Managed Lane Interchange
on I‐75 at Big Shanty Road
This is an artist’s rendering and may not be representative of the final design.
I 575 Slip Ramp Operation
I‐575 Slip Ramp Operation
This is an artist’s rendering and may not be representative of the final design.
16