D 7 CONSULTING INC. 1000 Dove Street, Suite 102 Newport Beach, CA 92660 Phone (949) 955-2777 Building Envelope Specialists Fax (949) 955-2829 Date: 3-14-14 FLUID-APPLIED WATERPROOFING OBSERVATION REPORT Report # Project: Fountain (@ La Brea) Address: 1234 La Brea Ave. - West Hollywood, CA Client: Monarch Group Contact: Dennis Chapman Phone: (858) 490-3330 General Contractor: White Residential Superintendent:Lance Baker Fent Phone: (949) 283-2026 Waterproofing Contractor: Courtney Waterproofing. Superintendent: Tino Macchia. Phone: (310)686-3544 Crew Foreman: Fernando. Crew Size: 2 D 7 Quality Assurance Observer: Dan Williams. Start Time: 7:00 am. End Time: 3:00 pm Sunny W/ 5 mph winds. . . . 55. Highest: 74 Weather: Temp (°F): Lowest: Warranty: Waterproofing Contractor: Years Manufacturer: Systems Description: Neogard 7401 Fluid Applied Waterproofing 1. SAFETY Y N N/A Y N N/A x x Barricades Drains opened x x Portable toilet Temporary water cut-offs installed x Fire extinguisher Finished membrane protected x 2. MATERIALS Y N N/A Y N N/A x x Materials approved by Architect/Owner Manufacturer's brand name clearly marked x Material delivered in original sealed containers x Materials stored above 50°F 3. SUBSTRATE PREPARATION Y N N/A Y N N/A x x Concrete cure time met Substrate clean & dry x Substrate signed off by Manufacturer x x Primer required Deck primed & dry 4. WATERPROOFING SYSTEM Manufacturer: Neogard. Specification #: . 7401 fluid App WP Waterproofing system components: 7401 membrane, reinforcing fabric , sika flex sealant Base flashing components: Base/First coat: Neogard 7401. Applied: Wet Mils 45+. Specified: Wet Mils 45 Neogard 7401. 45+. . 45 Second coat: Applied: Wet Mils Specified: Wet Mils Neogard 7401. 45+. Third coat: Applied: Wet Mils Specified: Wet Mils 45 Fourth coat: Applied: Wet Mils Specified: Wet Mils 5. DETAILING & FLASHING Y N N/A REMARKS All detailing & flashing completed prior to field membrane xx All flashings fully adhered to substrate x x. x L-metal flashing installed in sealant & fastened to deck x Rienforcement installed over L-metal edge/type of reinforcement 6. TODAY'S WATERPROOFING APPLICATION Primary waterproofing application: Install Drainboard/term bar to 3 planters in the JC plaza and 2 @ fountain& LaBrea Location [Shown on deck plan/grid lines]: . see attached map and report for locations Area of deck covered with membrane:______________Sq. Ft. Water test conducted: N N/A Y. Yx 7. SUMMARY OF TODAY'S WORK INCLUDING DEVIATIONS & RESOLUTIONS: 1) Waterproofers were onsite at 7:00 am and we walked under water tests to check for leaks, No leaks were found at this time. 2) Crew removed water from planters and started installing drainboard to the inside of the planters. 3) Crew installed termination bar to the top edge of the drainboard 2" from the bottom of the light bar recess on 3 small planters in the John Chase plaza and 2" from the top in the 2 planters at the corner of Fountain& LaBrea. 4) holes were Pre-Drilled and termination bar was fastened in place with 11/4" long Hammer drive fasteners every 6" OC. 5) NOTE: A sign post was installed in the large planter on the John Chase plaza today. holes were drilled through the finished waterproofing and lag bolts set in epoxy were installed. Sign installer applied Sika Flex 1a sealant around lag bolts before setting sign post base in place. 6) Waterproofers applied SikaFlex 2c NS 2 part sealant around base of sign post and flex conduit installed by electrician. 7) Crew applied Neogard 7401 around base and up post appox. 3 1/2' before cleaning up and leaving at 3 :00 pm David Boscaglia QAO Signature:__________________________________________ Accepted By:______________________________ Company:________________________________ WRI Dan Williams QAO/RRO Title:_________________________________ Acting Superintendent Fluid Applied Waterproofing www.d7consulting.com 3-14-14 Fluid App WP site map ( ground floor) = Crew installed drainboard W/ termination bar to planters = sign post installed in large planter in the JC Plaza
© Copyright 2024 ExpyDoc