Construction Engineer

Todd Steagall, P.E. - Director of Construction
Charles Eleazer, P.E. - Construction Engineer
July 31, 2014
Organization Chart
Director of Construction
Todd Steagall
Office of Materials &
Research
Merrill Zwanka
State Pavement Design
Engineer
Jay Thompson
Quality Management Team
(QMT)
Merritt Vann
Construction Support
Brian Parnell
Contracts Engineer
Vacant
Contract Administrator
Jeff Elliott
Construction Engineer
Charles Eleazer
Design Build and Special
Projects Engineer
Claude Ipock
Scheduling Engineer
Patti Gambill
Geomatics Engineer
Wei Johnson
Road Construction Engineer
Vacant
Assistant Design Build and
Special Projects Engineer
David Rodgers
Bridge Const. Engineer
David Rister
Assistant Road Engineer
Districts 2, 4, & 6
Kevin Harrington
Assistant Bridge Engineer
Districts 1 & 6
Vacant
Assistant Road Engineer
Districts 1 & 7
Al Barwick
Assistant Bridge Engineer
Districts 3, 4, & 7
Doug McClure
Assistant Road Engineer
Districts 3 & 5
Nick Waites
Assistant Bridge Engineer
Districts 2 & 5
Bill Mattison
Other Organizational Changes





Janet Oakley – Secretary of Transportation
Christy Hall – Deputy Secretary for Engineering
Leland Colvin – Chief Engineer for Operations
Thad Brunson - Chief Engineer for Field Operations
District 1
Bryan Jones – District Engineering Administrator
 Robbie Isgett – District Construction Engineer (DCE)
 Ashleigh Sandel – Assistant DCE

 District 6

Kevin Turner – DCE (Replaced David Glenn)
Joint Committee and
Road Sub-committee Topics






Statewide consistency
Summer 2013 weather
Low Shoulder Spec (8/2014)
ADA Ramps
Sub/Hauler Request – electronic submittals
Compost Quantities
Joint Committee and
Road Sub-committee Topics





Pavement Preservation Certification - 11/2014
Proposed Intersection Traffic Control Standards
Prime Bidders List
Permanent Construction Sign Removal
Utility and Preconstruction Subcommittees
Combined.
 Flex Time Specification
Joint Committee and
Road Sub-committee Topics
 Schedules
Used to predict cash flow and schedule lettings
 Currently ~ 38% of projects are > 10% behind
schedule.
 Submit updates on time and accurate

• This seems to be a habitual problem
Joint Committee and
Road Sub-committee Topics
 Dispute Review Board – new members

Gene Ellison

David Law
DBE Reminders
 Prime Contractors must submit Quarterly
Reports for all DBE/WBE participation, even if
there is no goal. DBE Supplemental Spec
states “This requirement applies regardless of
whether there is a contract goal assigned to the
contract.”
 If not part of the committal, just submit Quarterly
Report. Subcontracts not needed by SCDOT.
DBE Reminders
 Must perform ”Commercially useful function”.

“…DBE must be also responsible, with respect to
materials and supplies used on the contract, for
negotiating price, determining quality and quantity,
ordering the material, and installing (where
applicable) and paying for the material itself.”
DBE 101 Review
 Gary Linn offers a 1-2 hour review session on
fundamentals of DBE program
Goal Setting
 Lettings
 On-site Reviews
 DBE Related Issues
 Project Completion

 Call Gary at (803) 737- 4672 or e-mail at
[email protected] to schedule
Upcoming Major Projects
 US 378 – 7 mile widening (Phase 5) – August 2014 –
Florence Sales Tax
 US 25 – 5.7 mile widening – Edgefield – Winter 2014
 SC 51 Widening – 4 sections – 2015 – Florence Sales
Tax
 SC 9 Bridge replacement over Broad River –
Chester/Union – late 2015
 I-385 - 5.5 mile Rehab (MM 37- MM 42) – Greenville –
late 2015
Design Build
 Website has details on membership rotation
guidelines, best practices, and project updates.
 Upcoming projects:

I-85 / I-385 Interchange – Greenville County
• 3 teams short listed
• Award / Contract Execution – August 2014

Bridge Package E
• 2 Teams short listed
• Award / Contract Execution – November 2014

US 701 bridge replacement over Great Pee Dee
• 5 teams short listed
• Award / Contract Execution – November 2014
Design Build
 Upcoming projects continued:

I-26 Rehab – Newberry County (MM 60-75)
• Bridge jacking, cross slope correction, resurfacing
• RFQ release Fall 2014

I-26 Port Access (Exit 218)
• Direct access from I-26 to new Port Terminal
• RFQ release Spring 2015

I-26 Rehab – Lexington/Richland (MM 89-101)
• 11 miles of widening and bridge replacements
• RFQ release Summer 2015
Research Topics - Active
 Evaluation of Cost Benefits to the DOT with
Increased RAP/RAS usage. (9/11/14)
 The Evaluation and Specification Development
of Alternate Modified Binders in SC. (11/16/14)
 Validation of Contractor HMA Testing Data in the
Materials Acceptance Process – Phase II.
(6/23/15)
Research Topics - Active
 Evaluating the Use of Wide Footprint Laser
Sensors for Improved Rideability Measurement.
(9/17/15)
 Calibration of the AASHTO Pavement Design
Guide to SC Conditions – Phase I (6/17/16)
Research Topics – Recently Completed
 Impact of Course Aggregate Gradation on PCC
Performance Properties (6/30/13)
 Accelerated Bridge Construction – Precast
Alternate for Flat Slab Spans (12/31/13)
Research Topics - Pending
 Better Construction Project Management
through Better Scheduling
 Effect on Asphalt Quality Due to Nighttime
Construction
 Laboratory Performance of Liquid Anti-Stripping
Agents in Asphalt Mixtures used in SC
Research Topics - Pending
 Best Construction Practices for Longitudinal
Joint Construction and Compaction
 Evaluation of High Los Angeles (LA) Abrasion
Aggregate in Open Graded Friction Courses
 Preparing SCDOT Construction Offices for 3D
Construction Modeling
Asphalt
 NCAT Test Track
Warm mix with high RAP content
(Completion scheduled for March 2015)
 Lee Road – 25 sections of various
preservation treatments
 www.Pavetrack.com

 Most contractors are opting to use
chemical additive for OGFC Warm Mix to
improve workability.
Traffic Control in another Country
Questions or Comments?