Concrete - Pinnacle Infotech Inc.

3D BIM SERVICES
FOR CONCRETE CONTRACTORS
|
|
|
|
|
|
|
|
3D MODELS
CONSTRUCTABILITY REVIEW
MODEL COORDINATION AND CLASH RESOLUTION
FORM WORK
SHOP DRAWINGS (LIFT DRAWINGS)
REBAR QUANTITY & BAR BENDING SCHEDULE (BBS)
QUANTITY TAKE-OFF
4D PHASING
www.pinnaclecad.com
Commitment
We are committed to our core values and
corporate mission:
|
Maximize client value by adopting
the latest technologies and
innovations.
|
Improve project efficiency by
streamlining workflow and provide
high quality services.
|
Save time by using a large global
team to leverage time zone
advantages.
|
Reduce client costs up to 30% by
harnessing a highly experienced
global work force.
INDEX . . . .
Revolutionizing Concrete
Construction
3
Concrete Modeling
3
Benefits of Concrete Modelling
4
Constructability Analysis
5
Shop Drawings
6
4D Construction Phasing & Monitoring
8
Bar Bending Schedule
8
Quantity Take-off
9
Quality Control Process (QC)
10
Work Flow
11
Why Pinnacle?
12
Testimonials
13
Project Snap Shots
14
Revolutionizing the Concrete Construction
Proper planning and coordination are the keys to the
successful execution of projects in the construction
industry. Advancements in 3D technology and the advent
of Building Information Modeling (BIM) have revolutionized
the Architectural, Engineering and Construction (AEC)
industry.
BIM allows stakeholders to create and examine virtual
representations of the architecture model and other utilities
of their project. The virtual construction can be used to
generate accurate construction drawings and address all
constructability issues before construction begins.
Pinnacle Infotech has been acknowledged as the global
leader in providing innovative BIM solutions. We have
received several awards and recognition from both industry
and government. NASSCOM, the leading IT trade
association, has named Pinnacle among the Top IT
innovators 3 years in a row (2006, 2007, and 2008) and
again in 2011.
The successful completion of more than 3000 BIM
projects in 18 countries has provided Pinnacle with a
deep understanding of international building codes and
procedures. Our global delivery system allows us to
maintain constant contact with our clients making
geographical separation meaningless.
We recognize the importance of effective work process
management and regular communication when
outsourcing services. We have developed an ideal mix
of infrastructure, experience, global presence and
commitment to excellence that has led to long-term
relationships with more than 950 clients worldwide.
Building Information Modeling - Concrete
Building Information Modeling (BIM) is the creation and use of coordinated 3D model via link to intelligent database for
a construction project. BIM concrete model enables seamless collaboration between Architects, Engineers, Contractors
and Sub-Contractors enabling quick decision making, accurate construction documents, better construction management.
BIM offers structural engineers complete control over the design and detailing of concrete, steel and reinforcement.
Following structural elements are modelled in BIM:
Beam, Columns, Joists/Truss, Slab/Bracings, CMU/Pre-Cast Walls, Footings and Foundation, Stairs, Pile Details,
Metal Canopy, Construction Joints, Steel, Rebar, Embeds, Shoring, etc.
03
Healthcare
Input 2D Drawing
Output 3D BIM Model
Hydraulic Spillway
Water Treatment Plant
Output 3D BIM Model
Output 3D BIM Model
Benefits of Concrete Modelling
| COORDINATION: Streamline communication with 3D visualization among all stakeholders for quick decision
making during design and pre-construction phase.
| EFFICIENCY: Eliminate RFI’s, work stoppages and rework by checking the accuracy and completeness
of drawings before starting construction on-site/off-site.
| QUALITY: Improving Quality by producing accurate Shop Drawings directly from the 3D BIM model which could
also be used for pre-fabrication.
| SAVINGS: Pre-construction and Pre-fabrication reviews mean better use of manpower, better quality
construction and reduced rework and wastage, all of which translate into lower costs.
| PROJECT MANAGEMENT: Detailed Material BOQ and Shop Drawings with 3D visualization enable a better look
at “The Big Picture” and aid in the review, scheduling and monitoring of each project.
Our clients have reported cost savings up to 30% by successfully implementing BIM.
04
Constructability Analysis
Virtual Construction of project in BIM enables Independent Review of the Construction Plans and Specifications. This
identifies discrepancies in drawings and all constructability issues at preconstruction stage. During the constructability
review, our BIM team generates a series of RFI’s to help identify following type of constructability and operational issues:
Missing information / documents
Input inconsistencies
Conflicting data
Other constructability issues
BIM model is updated based on responses of RFI’s. Status of all RFI’s is maintained in a log and follow-up is done to
resolve them at preconstruction stage. This eliminates work stoppages and rework during construction.
RFI Format
05
Shop Drawings
Shop Drawings are created based on project standards and are useful to contractors, fabricators, suppliers and
manufacturers during construction. BIM is highly useful for construction of any irregular or complex structures.
These drawings are generated directly from coordinated BIM models and are detailed enough for on-site
construction/precast. Advanced BIM tools help in revisions management.
Shop Drawing Samples for Stadium project
Foundation Plan
S.O.G. Layout
Shop Drawing Sample for Hospital Project
06
Shop Drawing Samples
Column Arrangement Plan
Slab Arrangement Plan
Wall Arrangement Plan
Wall Setting Plan
Column Setting Plan
Structural Stair
07
4D Construction Phasing & Monitoring
Project construction schedule/sequencing is linked to the BIM model. A real time simulation of the construction sequence
is shown in Navisworks Time Line or as an animation video format. During the entire duration of the project, the Planned
Vs. Actual construction schedule is compared and presented.
When the project plan is established in visual simulation, users can visually associate model objects and scheduled tasks.
Users can click on a building object in the 4D visual environment and can view its associated task highlighted in the Gantt
Chart or vice versa.
Planned Status
Actual Status
Foundation, 1st - 5th Floor -100% complete
On Schedule
Behind schedule
Ahead of schedule
Completion of concreting
Foundation, 1st - 4th Floor - 100% completed
5th Floor Column 100% Completed
5th Floor Wing I Slab 100% Completed
5th Floor Wing II Slab scheduled to be Completed today
Delay in completion: 10 days
Bar Bending Schedule
The Bar Bending-schedule details the management of
reinforcement bars that will be cut and bent into rebar.
BIM Model provide following details
Break down of bars by quantity and diameter
Cross section views
Length, weight and shapes of bars
RC Detail Correction (Constructibility issues)
08
BBS of Column
BBS of Beam
Rebar & Reinforcement Take-off
Quantity Take-Off (QTO)
BIM model generates accurate quantity of all materials. These quantities are automatically updated with any changes in
the BIM model. Quantity Take-Off (QTO) reports can be formatted in Excel and exported to a database for detailed analysis.
Quantities can be generated for a specific time period or project area (4D/5D) to help manage material procurement and
save inventory costs.
Concrete Bill of Quantity Sample
09
Quality Control Process
Our QC process is ISO 9001:2008 certified and managed by an independent QC team. The main objective of the quality
control (QC) process is to detect errors and rectify it.
Ensuring quality is a group effort and our dedicated QC team is led by a highly qualified and experienced Manager in
MEP Coordination and Quality Control.
The entire QC process is handled in three phases:
QC 1
QC 2
QC 3
Plot Check
Screen Check
Pre-Shipment Check
Performed by
Production Team
Performed by
QC Dept./Team
Performed by
Project Manager
DELIVERY
TO
CLIENT
100% Quality
QC Check Phase I
The model is plotted on paper and a preliminary grid by grid check is done comparing it with the original contract
documents. Member of the Project Management team assists in this process.
The project team leader sends a status report to the QC Department to begin QC Phase II.
QC Check Phase II
The QC Team performs a more detailed comparison of the Contract Documents against the 3D BIM model. Specific
Checklist is prepared to review/check the deliverables. Their main objective is to review, identify and address
the following:
Missing data
Mismatches with the contract documents
Clashes (Old/New), Elevation, Routing, Fittings, etc.
Construction point of view.
No-Fly-Zones.
Attribute Checking (Pressure class, Pipe material, etc.)
Location of Equipment such as VAV, Sleeves, Hangers, Valves.
Equipment Connection details as per Schematic Drawings.
Equipment Models as per Technical Submittals.
Annotations & Dimensions, Aesthetic View.
Miscellaneous issues
The QA/QC Team continuously interacts with the Project Lead and other team members to resolve all technical issues
related to the project.
QC Check Phase III
The Project Manager conducts the pre-shipment check before sending them to the client.
10
Work Flow
UNDERSTANDING DETAILED SCOPE/RFI/CLARIFICATION
BIM WORK PROCESS FOR CONCRETE PROJECT
PINNACLE
MARKETING
TEAM
DELIVERABLES
CLIENT
OWNER/CONCRETE CONTRACTORS/
GENERAL CONTRACTOR
ESTIMATES
PINNACLE BIM
PROJECT MANAGER
PROJECT TEAM
Project Study/
Input Doc.
Review
Raising RFI’s
for missing
information
RFI’s
Answered
Creating
3D Model
Value Engineering (VE)
& Constructability
Review (CR)
Updating the
3D Model to
Reflect VE &
CR Changes
QC of Model
Phasing/4D
Scheduling
Presentation Outputs (Rendered Images/
Videos/Mock-ups)
BIM COORDINATION WITH ARCH./STRUC./MECH./PLMB. TEAM
Combining of all the
Models of various
Trades/Discipline
Performing Clash
Detection
Quantity Take-off
& it's QC
Coordination Meetings
to discuss unresolved
Clashes
2D Drawings
& it's QC
Updating the Model
to resolve Clashes
6D and As-built
Services
DELIVERABLES
11
Why Pinnacle?
Pinnacle is global leader in providing innovative BIM services.
Our in-house team of more than 650 experienced Architects,
Engineers and BIM professionals helps us provide end-to-end
solution to discerning clients around the world.
Our 3,50,000 sq.ft., world-class production facility is equipped
with high-end workstations, advanced servers with real time
backup and a high speed data and voice network. It is all
protected with an uninterrupted power supply with a 24 x 7
security system.
Fast Turnaround
Our skilled team of professionals can provide quick
turnarounds on complex projects. Pinnacle has successfully
completed several large-scale projects across multiple
verticals including Health Care, Hospitality, Airports,
University Centers, Data Centers, Retail Centers, Convention
Centers, Commercial, Industrial and Residential Projects.
Technical Strengths
Pinnacle engineers specialize in the latest BIM software :
Revit Software Suite (Revit, Revit MEP, Revit Architecture
and Revit Structure), Microstation, Ecotect Analysis,
NavisWorks, Inventor, Civil 3D, Plant Design Suite, Pro/Engineer, Tekla Structure, SolidWorks, Autodesk Fabrication Suite,
Quickpen, Cadpipe etc.
Pinnacle engineers have a deep understanding of global and regional codes and standards. Our Quality Management System is
as per ISO 9001:2008.
Global Presence
Pinnacle has offices around the world (USA, India-Durgapur &
Kolkata, UAE and Italy) enabling us to serve our clients around
the clock.
Experienced in BIM Domain
Pinnacle is one of the leading service providers in the BIM
domain. We have successfully collaborated with several leading
contractors on BIM projects for specialty hospitals, stadiums,
universities, dams, apartment complexes, hotels, casinos, large
retail center, high school, airport, commercial buildings,
convention center, high rise tower and industrial projects.
Communication
Pinnacle’s Project Management team is available to clients through a number of communication channels including:
1. Global telephone network for instant communication.
2. FTP over a secured network for file transfers.
3. Email for reports and interactions.
4. Video and teleconferencing for presentations and
conversations.
5. WebEx conferences with US-based phone systems.
12
Testimonials
“Pinnacle has been a real asset to the project. Their team is very knowledgeable and efficient at the BIM process and has provided
an end product that is very useful to not only the construction coordination and installation, but also the end users of the facility.”
Chuck KonKolics
The Whiting-Turner Contracting Company
“My experience in working with Pinnacle has been very good. Pinnacle assisted Baker on a very complex and demanding project and
Pinnacle’s hard work, dedication and attention to detail really contributed to our team’s success on the project. Thanks to the
Pinnacle team members for their hard work, dedication and quality work that they provided to Baker on this project.”
Kevin McGuire
Baker Concrete Construction, Inc.
“Pinnacle delivers a great deal of value for a very reasonable price. They consistently deliver my expectations on-time.”
Ryan Tingey
Turner Construction
“This was my 2nd project with Pinnacle and I have been satisfied with Pinnacle’s problem-solving approach and quick turn-around.
The project at this time was a bit unique and challenging, but the positive attitude by Chandan and his team mitigated the challenging
conditions and delivered to us a high-quality product. More we work together easier we communicate especially on some unique
protocols existing in Japanese construction industry. Thank you.”
Tatsuya Inokuchi
Obayashi Corporation
“I was very impressed and satisfied with the final outcome of the project. There were some issues but the Pinnacle team worked
them out and solved them satisfactorily. I will be glad to request some further assignments and tasks to be done for CAD, BIM,
and REVIT.”
Pedro R. Munoz
PRM Engineering, LLC
“The Pinnacle team was very responsive to all of our requests and input. Generated many valuable RFI's during the modeling
process.”
Ryan Brown
Turner Construction Company
It has been a pleasure working with Pinnacle. We dealt with a very complicated, poorly designed project and Pinnacle's modeling
service was able to help point out several discrepancies during the modeling process. The scope of work was updated, revised, and
changed so many times and Pinnacle was happy to continue working with us.
Lauren Smith
S. M. Wilson & Co.
Chandan and his team have been excellent to deal with and have responded to requests very quickly. I have been extremely happy
with Pinnacle's performance and would use your company again if the need arises.
Chris Robbins
ASI Constructors
Working with Sujit was very easy. We never once worried that deadlines wouldn't be met, or that the quality was lacking in
anyway. His communication with us instilled confidence.
Daniel Fahmi
Baker Concrete Construction, Inc.
Drawing review comments were regularly incorporated into revised drawings well. The timely incorporation of updates
was good. When the AutoCAD glitch occurred and line weights and dimensions were pixelated, your team worked
to find a solution. Weekly design meetings worked very well to ensure comments were fully understood.
Crosby Lovell
Pacific Structures Inc
13
Project Snap Shots
SECTOR
LOCATION
CLIENT
PROJECT NAME
DETAILS
TIME
LINE
PROJECT AREA
MANPOWER
Residential
L&T
The Crest
April
2014
3,574,356 Sq.Ft.
April
2014
340,000 Sq.M.
November
2013
425,754 Sq.Ft.
November
2013
118,000 Sq.M.
3D Modeling for Architectural, Structural and MEP trades;
Entire detailed BOQ; 4D phasing; Architectural & MEP shop
drawing; Clash coordination; Landscape modeling; On-site
work/coordination.
Gurgaon
India
Hotel &
Mall
HOK
As-Built model creation for Architecture, Structure and MEP
of the existing mall; As-Built updates based on documents;
Co-ordination between each Trades.
Dubai
UAE
Residential
Complex
Contractor
Vintage Park Apartments
Delivered a 3D BIM Model of Architecture, Structure,
Mechanical, Electrical, Plumbing and Fire Protection services
after a complete coordination among all the trades. Clash
reports were also generated from the model.
Florida
USA
Hospital
Dubai Festival City
Stantec
LLC.
Riyadh
Saudi Arabia
King Faisal Padiatric Hospital & Research Centre
3D Modelling of Structure & MEP from Schematic drawings;
Co-ordination with Architectural model; DD & CD set creation
from BIM model; Client Communication through WebEx
meeting & Email.
30 Engineers
25 Engineers
5 Engineers
10 Structural Engineers
& 20 MEP Engineers
Concrete
Red Rock Hydroelectric Power Plant
October
36.4 Megawatts
Contractor
Pinnacle provided complete 3D BIM model of cast-in-place,
precast concrete. MEP cut-outs and Steel Embedment was
also included in the scope. Quantity Take-off for form work,
cast-in-place and precast concrete was generated from the
model.
2013
10 Structural Engineers
Msheireb Downtown Doha
July
2013
374,541 Sq.M.
Doha
Qatar
Conspel
and
Obayashi
Corporation
and HBK
Construction
Office Building
Concrete
Broward County Courthouse
May
741,633 Sq.Ft.
Florida
USA
Contractor
Pinnacle’s scope of this project is entire exterior Rebar model
for beams, columns, slab and joists for other trade coordination.
The other trade coordination is performing with the exterior
embeds of precast panel which is controlled by the general
contractor. Pinnacle has provided level wise exterior rebar
model to Baker concrete and they will submit the model to the
GC for the coordination. After the trade coordination GC will fix
the clashes and finalized some new changes in the drawings.
2013
4 Structural Engineers
Industrial Plant
Mor PPM Inc.
(An EMCOR
Company)
Bridgestone Aiken ORR Plant
September
2012
1,320,000 Sq.Ft.
General
Contractor
TCS-ADIBATLA SEZ
Hydro Electric
Facility
Pella, Lowa
USA
Mixed Use
Residential
Township
South Carolina
USA
IT SEZ
Centre
Hyderabad
INDIA
Ambit of this project includes Architectural and Structural
3D Modeling, MEP-FP (Mechanical, Electrical, Plumbing,
Fire Protection) and 3D Modeling. Providing coordination
services, Final Shop Drawings and generation of constructability
report & Quantity Take-Off, creation of 3D Mock up along with
Phasing & 4D Scheduling.
Robust determination of Process piping-3D model, Coordination,
Shop drawing, Hanger BOQ, Spool, Hanger-LOD-500.
April
Pinnacle provided the completed 3D BIM Services for the entire 2012
Architecture, Structure, MEP with complete set of Good for
Construction Drawings, Wall penetration drawings of different
trades. Clash co-ordination for all the trades, 4D-Phasing,
Simulation etc.
45 MEP Engineers,
16 Architectural and
Structural Engineers
8 MEP Engineers
4,000,000 Sq.Ft.
14
Project Snap Shots
SECTOR
LOCATION
CLIENT
PROJECT NAME
DETAILS
TIME
LINE
PROJECT AREA
MANPOWER
Education
College of Media & Communication
February
2012
25,000 Sq.M.
Doha
Qatar
HBK
Contracting
Company
WLL
Shopping Mall
General
North Gate Mall
November
417,500 Sq.M.
Contractor
A Clash free 3D BIM model (Architectuarl & Structural) for
the entire mail area along with the office building were provided
by Pinnacle. A walk through presentation was also created and
delivered.
2011
32 Architectural/
Doha
Qatar
Airport
Abu Dhabi International Airport
August
Pinnacle provided the bid presentation model (as PPT
presentation) for Abu Dhabi International Airport. Both interior
and exterior architectural and structural elements. Also as per
clients request a video (AVI) presentation of the 4D phasing for
the entire project was delivered.
2011
General
Contractor
Tata Realty TCS Sahyadri Park
December
2010
Pune
India
Office Garage
Retail
General
Contractor
Cincinnati
USA
Hydro Electric
Facility
Concrete
Contractor
Kentucky
USA
Airport
Structural/Civil Engineers.
Contractor
EPC
Pinnacle provided complete coordinated 3D BIM services
for the entire Architecture, Structure, Plumbing, Fire Protection,
HVAC and Electrical trades along with complete set of Good
for Construction Drawings, wall penetration drawings of
different trades.
700,000 Sq.M.
15 Architectural &
10 Structural Engineers.
1,667,168 Sq.Ft.
15 Structural Engineers.
Queen City Square Tower
August
Pinnacle's scope included 3D model of the Architectural and
Structural elements. After clash detection and clash resolution
with all the trades, a completely coordinated 3D model was
generated to ensure clash free construction on-site. Shop
drawings for Concrete Contractor were produced.
2010
Meldahl Hydro Electric Power Plant
1,349,999 Sq.Ft.
15 Structural
Engineers
June
2010
Pinnacle provided complete 3D BIM model of cast-in-place,
precast concrete. MEP cut-outs and Steel Embedment was also
included in the scope. Quantity Take-off for form work,
cast-in-place and precast concrete was generated from the
model. 1365 Lift Drawings as per pour sequence was delivered
as per time line.
111 Megawatts
New Delhi International Airport
5,920,150 Sq.Ft.
May
2010
Pinnacle scope included entire designing of BIM for Terminal
3 and runways for this large Intentional PIER and Sight line
report for Air Traffic Control were generated. Simulated
structures of Raft Foundation and Column along with Arrival and
Mezzanine level concrete structure was also created.
The project also required Clash detection between all services.
Quantity Estimation and Construction Phasing was also done as
per PERT chart of the project.
New Delhi
INDIA
10 Architectural,
10 Structural & 10 MEP
Engineers.
General
Abu Dhabi
UAE
IT SEZ
Centre
Pinnacle provided 3D BIM Modeling and Coordination services
for the entire Architectural, Structural, Mechanical, Electrical
and Plumbing Trades. Level wise and zone wise BOQ and
coordinated shop drawings were also generated from the clash
free 3D BIM model.
15 Structural Engineers
40 Arch. Engineers,
30 Structural Engineers
& 20 MEP Engineers
Convention
Center
Tennessee
USA
General
Music City Center
February
369,998 Sq.Ft.
Contractor
The project required 3D Modeling and concrete Quantity
Take-off. The model was used for the Bid Presentation.
2010
15 Structural Engineers.
Water
Treatment
Plant
General
Contractor
Robert B. Diemer Water Treatment Plant
July
2008
9,234,714 Sq.Ft.
Yorba Linda
USA
Diemer Water Treatment Plant retrofitted. Oxygen/Ozone
system. Ozone Generation Building, Ozone Contractors,
Influent, Effluent Conduits, Rejection Tunnel, Liquid Oxygen
Store, Chemical Feed, Unit Substation, Switchgear Building,
Emergency Generator, 3D modeling, Detailing, Lift Drawing
embeds, Penetrations, Pre-cast walls, Slabs (Primary &
Secondary) etc.
10 Structural Engineers
15
Lecco, Italy
Texas, USA
Durgapur, India
Abu Dhabi, UAE
Kolkata, India
USA Office and Production Center
International Production Center
Pinnacle Infotech Inc.
Pinnacle Infotech Solutions
6161 Savoy Drive #1125,
Houston, TX 77036
Phone : 713 780 2135
Fax : 713 780 8784
Email : [email protected]
S.S.B. Sarani, Bidhannagar, Durgapur
West Bengal, India - 713212
Phone : +91 343 6602222 / 6602231 – 35
Fax : +91 343 6602230
Email : [email protected]
Biswanath Todi
Operations Manager
Cell : 832 283 6628
Bimal Patwari
President
Cell : 713 589 9125
UAE Office
Kolkata Office
Pinnacle Middle East
Pinnacle Infotech Solutions
P.O. 55384, Abu Dhabi, UAE
Phone : +971 2 6781070
Fax : +971 2 6781080
Email : [email protected]
Suite 530, SDF Building.
Salt Lake Sector V, Kolkata - 700091
Phone : +91 33 23576195
Fax : +91 33 23576194
Email: [email protected]
ITALY Office
Pinnacle Infotech Inc.
Nunki di M.Brossa,
via Calvi, 10 - 23801
Calolziocorte, LC - Italy
Phone : + 39 0341630070
Email : [email protected]
www.pinnaclecad.com