Schedule of Requirements [ 181 KB]

Republic of the Philippines
COMMISSION ON ELECTIONS
Manila
SECTION VI
Schedule of Requirements
TWO-STAGE COMPETITIVE
BIDDING FOR THE LEASE
OF ELECTION MANAGEMENT
SYSTEM (EMS) AND PRECINCTBASED OPTICAL MARK READER
(OMR) OR OPTICAL SCAN (OPSCAN) SYSTEM
BAC Reference No. 01-2014-AES-OMR
BIDS AND AWARDS COMMITTEE
2014
Section VI
SCHEDULE OF REQUIREMENTS
ACTIVITY/ ITEM/
SCHEDULE
PLACE OF
DESCRIPTION
OF DELIVERY
DELIVERY
Component 1: Election Management System (EMS) and Precinct-Based
Optical Mark Reader (OMR) or Optical Scan (Op-Scan) System
As per
Comelec, PDG,
A
Election Management System
A.23
Base Source Code of EMS
attached
Intramuros,
B
23,000 Vote Counting
Terms of
Manila
Machines (VCM)
Reference
B.37.1
Source Code of Hash Extractor
and Validator
B.45.1
All consumables, supplies and
materials, such as removable
storage devices, paper, ink,
marking pens and the like,
which are needed by the
system to be operational, and
which have been used in all
tests, including all
documentations
C.I.1.1
Settings, configuration,
scripts, codes, or passwords
used
C.I.1.2
All disk images of all servers,
used in the configuration and
in the installation
C.I.1.3
All back-up files, (EMS files,
VCM files, ballot templates)
C.I.1.4
Application and procedures on
restoration of back-up files
and disk images, including
information on minimum
hardware requirements to
restore the files.
C.I.3
Warranty for the entire duration of
the project for all components, all
equipment and software, including
provision of all software/firmware
upgrades or replacement of any
defective components, entire units,
or systems
C.I.4
Inventory system
Ref. No.
2
Ref. No.
C.I.5
C.I.8.
C.I.9
C.I.10
C.I.11
C.I.12
C.I.12.1.7
C.I.12.2
C.I.12.2.1
.2
C.I.12.6
C.I.12.7
C.I.12.8
C.I.12.9.
C.I.12.10
C.I.12.11
ACTIVITY/ ITEM/
SCHEDULE
DESCRIPTION
OF DELIVERY
All systems for ICE
review,functional testing and
certification
Replacement of all expendable parts
of the VCM used in the ballot
verification
Remote and on-site technical
support during the conduct of
source code review by local
interested parties
Presentation of the source
codes of the EMS and VCM
and all of its components to
the technical personnel of the
COMELEC
Requirements for the conduct
of training and public
demonstration
Requirements for the conduct
of the different tests Hardware
Acceptance Test (HAT), Lab
Test, Field Test, Mock
Elections, Pre-Election Logic
and Accuracy Test (PreLAT),
TEC Certification Test, Live
Transmission Test, Final
Testing and Sealing (FTS)) and
public demonstration
Replacement of all hardware that
did not pass the HAT with new
units
First laboratory test
Second laboratory test
Certification on the conduct of
Quality Control and Quality
Assurance Tests
Technical Support during Lab Test
Field test
Mock elections
TEC Certification
PreLAT
Final Testing and Sealing (FTS)
3
PLACE OF
DELIVERY
Ref. No.
C.I.13
C.I.13.5
C.I.15.
C.I.16
C.I.17.
C.I.18.
C.I.18.1
C.I.18.2
C.I.18.3
C.I.19
C.I.20.
C.I.21.1
C.II.1
C.II.2
ACTIVITY/ ITEM/
SCHEDULE
PLACE OF
DESCRIPTION
OF DELIVERY
DELIVERY
Materials, supplies, equipment and
support services needed for the
tests
Computerized Machine Inventory
System
Technical support and manpower
complement in the conduct of HAT,
PRELAT, Reverse Logistics (testers,
logistics, packers, etc.)
Delivery and pullout of VCM for
National Printing
Ballot verification scanning
Office (NPO) or
BangkoSentralngPil
ipinas (BSP)
Deployment of all VCMs, ballot
Comelec, PDG,
boxes, and other AES equipment
Intramuros,
and peripherals, including all other
Manila
AES-related consumables, supplies,
materials
and
contingency
equipments
Post-election
activities,
which
includes Inspection, Inventory and
Testing
All storage devices and supplies and
materials, retrieved during the
conduct of reverse logistics
System for backing-up, viewing and
printing of all files stored in the
removable devices for use in case of
election protests
Technical support in the conduct
of post-election activities
Post-election report on all activities
undertaken pertaining to the project
Plan on the conduct of training,
tests, setting-up, configuration, FTS
and E-Day activities, back-up,
closing and other related activities
Project management support to
manage the submitted plan
Training program for executives
First Extensive training or transfer
of technology
Second Extensive training or
4
Ref. No.
C.II.3
C.II.4
C.II.5
C.II.6
C.II.7
C.III.1
C.III.2
C.III.2.2
C.III.3
C.IV
C.IV.3.1
C.IV.3.2
C.IV.3.3.1
C.IV.3.3.2
C.IV.3.3.3
C.IV.3.4
C.IV.3.5
C.V.2
ACTIVITY/ ITEM/
SCHEDULE
DESCRIPTION
OF DELIVERY
transfer of technology
Training for trainers and certifiers
Training programs for the BEIs and
Random Manual Audit Team
Training for the Technical Support
Re-training of COMELEC trainers
Training materials
Risk management program
Back-up plan
Modules of the risk training and the
Contingency Plan Manual, and
personnel complement
Risk monitoring tools (manual and
automated)
Plan on the proposed change
management services
Assistance and logistical support in
the conduct of the information
assistance and education campaign
Print and broadcast information
materials
Comprehensive manual on the use
and operation of the system
Comprehensive list of frequently
asked questions, with suggested
answers, on the use and operation of
the system
Other materials as may be required
COMELEC
220 VCM Units for road shows
Assistance in the development and
maintenance of voter education and
information website for this project.
This shall include the delivery of all
requirements, including hardware,
software,
services,
technical
training, and communications link,
which shall be formally turned over
to the COMELEC upon the
completion of the project.
Pertinent guidelines and procedures
5
PLACE OF
DELIVERY
ACTIVITY/ ITEM/
DESCRIPTION
for the crafting and development of
Quality Assurance criteria for the
evaluation of the various phases
and/or activities of the Project
C.V.3.1
Development and implementation
of procedures for the measurement
and monitoring of the Service
Level Agreements (SLAs) for the
other components of the Project
C.V.3.2
Assistance
in
the
regular
monitoring of SLA compliance for
all components
C.V.3.3
Assistance in the conduct of a 3rd
party Stress and Security Testing of
all systems
C.V.3.4
Assistance in the conduct of a 3rd
party code review of the system
C.V.3.5
Assistance
in
recommending
acceptance and payment for the
services or outputs, and/or the
position
of
penalties
where
applicable
COMPONENT 2: Ballot Printing Services
1
16,500,000 ballots
Ref. No.
3
Installation of ballot printing
facility
7.5
Technical and administrative
support services during Ballot
Printing
Ballot Printing Monitoring System
with proper documentation on its
use, management and
administration
Project management plan on how
the printing of all ballot
requirements shall be finished on
time
7.6.
8.1
6
SCHEDULE
OF DELIVERY
As per
attached
Terms of
Reference
PLACE OF
DELIVERY
Comelec, PDG,
Intramuros,
Manila
At the premises of
the National
Printing Office
(NPO) or at the
BangkoSentralngPil
ipinas(BSP)
Comelec, PDG,
Intramuros,
Manila
ACTIVITY/ ITEM/
SCHEDULE
DESCRIPTION
OF DELIVERY
8.2
Detailed documentation which
includes technical specifications and
quantity of ballot paper, ballot
printer and ink
10
All
supplies,
materials,
consumables, ballot papers that are
not used
COMPONENT 3: Ballot Boxes
7
20, 406 ballot boxes
As per
attached
8
Delivery of ballot boxes
Terms of
Reference
COMPONENT 4: Technical Support
1
4,550 Technicians for Polling As per
Places/Voting Centers
attached
150 for National Technical Support Terms of
Reference
Center
1.1.2
Complete list of technicians with
their complete addresses and
contact numbers
10
Report on the resignation or failure
to report for duty of support
technicians
11.1
Complete names, addresses and
contact numbers of replacement
technicians
13.1
Procedures or set of rules to be
followed at the NTSC by the
technical
support,
including
documentation on the possible
systems
problems
that
may
encounter and the possible solutions
to the problems
13.2
Resume of all levels of technical
support
13.6.
NTSC
14
Operational plan which includes the
number of technical support
personnel to be hired, hiring,
training,
documentation
and
operational procedures
17
Proof
of
specialization
of
Ref. No.
7
PLACE OF
DELIVERY
Comelec, PDG,
Intramuros,
Manila
Comelec, PDG,
Intramuros,
Manila
Office of the
Election Officer
Office of
Election Officer
Ref. No.
ACTIVITY/ ITEM/
SCHEDULE
DESCRIPTION
OF DELIVERY
coordinators, such as resume,
certification
of
expertise,
certification of number of years of
experience and the like
PLACE OF
DELIVERY
Conforme:
_________________________________________________
Name of Company (in print)
___________________________________________________
Name and Signature of Company Authorized Representative
__________________________________________________
Date
8