NORTH SEA
NORTH SEA BUSINESS OVERVIEW
Montrose Area Redevelopment (MAR)
• Drive value from late life assets while
continuing to pursue divestments/dilutions
– Restore reliability and efficiency
– Execute major projects
– Divest/dilute
• UK
Bridge linked platform
to be installed
– MAR project expected to deliver production
late 2016
– Claymore Compression Upgrade will
deliver >80% Operating Efficiency
Existing platform
• Norway
– Yme MOPU to be removed summer 2015
– Yme redevelopment concept under evaluation
New bridge linked platform
(under construction)
Heavy lift of compression unit
May 2014
NYSE: TLM | TSX: TLM
www.talisman-energy.com
1
MAR – ADDING INCREMENTAL PRODUCTION
THROUGH REDEVELOPMENT
Montrose Area Redevelopment (MAR)
Montrose
Cayley
Arbroath
Shaw
Godwin
• Jacket 2014
• First Production late 2016
• Topsides 2015 – 2016
• Peak Production 2017
NORTH SEA PROGRESS
Portfolio
Management
Asset
Rationalization
• Increased management focus for
Norway and UKJV
Operating
Efficiency
• Develop optimized asset strategies
Improving
Performance
– Focused asset plans
Resource
Recovery
Project
Execution
• Stabilize operations while improving
cash flow
Capital
Discipline
– Realize economic value of resources
– Effectively manage decommissioning
• Increasing technical capability
• Driving a performance culture
Building a stronger business while continuing to pursue North Sea exit
May 2014
NYSE: TLM | TSX: TLM
www.talisman-energy.com
2
KURDISTAN
KURDAMIR / TOPKHANA CROSS SECTION
Post K-2 & K-3, oil
presence in Topkhana is
considered very likely
T-1
T-2
Topkhana
•
•
T-1 (drilled before K-2 & K-3)
was not tested in the oil leg
GOC 1882m in Topkhana
extrapolated from K-2 and K-3
DST results
Currently
drilling
K-2
K-1
K-3
Kurdamir
Kurdamir OGC 1840mss
Topkhana OGC 1882mss
2C ODT: 2049 mss
3C ODT: 2229 mss
Prospective gas and condensate
2C gas and condensate
Prospective oil
2C oil
DST Intervals
3C oil
Continuing appraisal to prove resource
May 2014
NYSE: TLM | TSX: TLM
www.talisman-energy.com
3
KURDAMIR / TOPKHANA –
GROSS RECOVERABLE RESOURCE
Gross recoverable unrisked resource
Gas (bcf)
May 2014
Topkhana
Prospective
(Best Estimate)
Topkhana
Contingent
(2C)
Kurdamir
Contingent
(2C)
1782
2825
1665
Condensate (mmbbls)
95
55
38
Oil (mmbbls)
610
0
268
NYSE: TLM | TSX: TLM
www.talisman-energy.com
4
INVESTOR RELATIONS CONTACTS:
Paul Smith
Executive Vice President, Finance and Chief Financial Officer
(403) 237.1434
ANALYST & INVESTOR RELATIONS INQUIRIES:
Lyle McLeod
Vice President, Investor Relations
(403) 237.1020
GENERAL & MEDIA INQUIRIES:
Simon Scott
Head of Corporate & Investor Communications
(403) 693.8493
TALISMAN ENERGY INC.
Suite 2000, 888 - 3rd Street S.W.
Calgary, AB T2P 5C5
Phone: (403) 237.1234
Fax: (403) 237.1902
Email: [email protected]
Website: www.talisman-energy.com