NORDEX AUDEE 2013 COMPANY PRESENTATION MONTEVIDEO JUN 2013 AGENDA 1 Activities: Global / Americas 2 Financials and Bankability of Nordex WTG 3 The Nordex Efficiency Class 4 Availability Track Record 5 Projects & Service, Training Nordex USA, Inc. | Company Presentation | WindPower 2013 | Chicago | May 2013 Slide 2 ACTIVITIES: GLOBAL / AMERICAS NORDEX GROUP NORDEX GROUP: KEY FACTS Global manufacturer of wind energy turbines with a focus on 2.5 MW class 28 years experience INSTALLED BASE Americas 7% Africa 1% Germany 25% Asia 11% Global headquarters in Hamburg, Germany, listed on the Frankfurt Stock Exchange Main production sites in Germany (Rostock), USA (Jonesboro, AR) Extensive use of platform technology (same or similar components across all WTG types) By region Other EU 56% Variants for different wind and climate conditions 2,536 employees as of 31 Dec 2012 Total installations in 39 countries Mid Size (0.75-1.49 MW) MW Class 12% (1.5-2.5 MW) 78% as of 15 Apr 2013 8,776 MW / By segment 5,397 WTG Small (< 0.75 MW) 10% Nordex USA, Inc. | Company Presentation | WindPower 2013 | Chicago | May 2013 Slide 3 ACTIVITIES: GLOBAL / AMERICAS NORDEX LOCATIONS WORLDWIDE GLOBAL PRODUCTION, SALES AND SERVICE NETWORK Chicago Hamburg Kolding Kolding, Uppsala Rostock Jonesboro Beijing Beijing Manchester Manchester Dublin Barcelona, Barcelona Porto Headquarters Paris Production Sites Roma Rome Subsidiaries Nordex USA, Inc. | Company Presentation | WindPower 2013 | Chicago | May 2013 Istanbul Warsaw Countries with Nordex WTG installed Slide 4 ACTIVITIES: GLOBAL / AMERICAS TARGET MARKETS IN THE AMERICAS Target Markets Target Market Plans NX Americas Headquarters NX Nacelle Assembly Plant Participation at AWEA, Chilean + Uruguayan wind conferences Create service organization near contracted projects Contract local suppliers of installation, domestic transportation, and maintenance services Canada First installation in target markets outside the US beginning in 2013 (Uruguay) U.S.A. Target Market Presence and Activity Puerto Rico Mexico Honduras Costa Rica MW Columbia Installed 1 Ecuador Peru Potential 673 MW Canada 26 MW Uruguay U.S.A. Target USA Chile Uruguay MW under MW under Construction 1 Development 1 1,500 MW 117 MW Honduras Columbia 300 MW 19.5 MW Chile 70 MW 1 Nordex USA, Inc. | Company Presentation | WindPower 2013 | Chicago | May 2013 as of Apr 2013 Slide 5 AGENDA 1 Activities: Global / Americas 2 Financials and Bankability of Nordex WTG 3 The Nordex Efficiency Class 4 Availability Track Record 5 Projects & Service, Training Nordex USA, Inc. | Company Presentation | WindPower 2013 | Chicago | May 2013 Slide 6 FINANCIALS AND BANKABILITY OF NORDEX WTG NORDEX SE: SHAREHOLDER STRUCTURE 24.99% 75.01% Skion/momentum capital Free float on the basis of 73,529,499 shares, as of 1 Sept 2011 Nordex USA, Inc. | Company Presentation | WindPower 2013 | Chicago | May 2013 Slide 7 FINANCIALS AND BANKABILITY OF NORDEX WTG MANY OF THE LEADING COMPANIES CHOSE NORDEX … Customer Country Selected Projects # WTG WTG Type MW Netherlands Nerefco 9 N80/2500 23 USA Cedar Creek II 60 N90/2500 150 USA Highland I 25 N90/2500 62.5 USA Highland North 30 N100/2500 75 USA Roth Rock 20 N90/2500 50 USA Shirley 8 N100/2500 20 USA Elk 17 N100/2500 42.5 USA Haw keye 20 N100/2500 50 USA Rippey 15 N100/2500 37.5 USA Beebe 34 N117/2400 81.6 USA Pow er County 18 N100/2500 45 France France France France France Romania Boulay Erize Saint-Dizier Amélécourt St. Aubin II Courcelles Chirnogeni 12 5 5 5 5 32 N90/2500 N90/2300 N90/2300 N90/2300 N90/2300 N90/2500 30 11.5 11.5 11.5 11.5 80 France Germinon 30 N100/2500 75 United Kingdom Slieve Divena 12 N80/2500 30 United Kingdom United Kingdom Germany Germany Germany Poland Poland Gruig Bow Beat Ketzin Schortew itz Hoppenrade Lebcz Dolice 10 24 8 6 5 4 21 N80/2500 N60/1300 N90/2300 N90/2500 N90/2500 N80/2500 N90/2500 25 31.2 18.4 15 12.5 10 52.5 Ireland Kings Mountain 10 N80/2500 25 Nordex USA, Inc. | Company Presentation | WindPower 2013 | Chicago | May 2013 Slide 8 FINANCIALS AND BANKABILITY OF NORDEX WTG … AND CONTINUE TO DO SO Customer Country Selected Projects # WTG WTG Type MW Italy United Kingdom United Kingdom United Kingdom Italy Minervino Murge Kilbraur Millennium Earlsburn Fossa de Lupo 26 19 20 15 36 N90/2300 N90/2500 N90/2500 N80/2500 N90/2500 59.8 47.5 50 37.5 90 Italy Vicari 18 N90/2500 45 United Kingdom United Kingdom Italy Italy Italy Italy Portugal Portugal Portugal Little Cheyne Court Bilbster Grighine Messina Energia Alternativa Cadau Carreco Vergao Chamine 26 3 43 21 25 14 9 10 3 N90/2300 N60/1300 N90/2300 N90/2300 S77/1500 S77/1500 N90/2300 N60/1300 N90/2300 59.8 3.9 98.9 48.3 37.5 21 21 13 7 Norway Havoygavlen 15 N80/2500 37.5 Germany Niederrhein 8 S77/1500 12 Germany France Roth Brachy 15 5 S77/1500 N90/2500 22.5 11.5 Canada Pincher Creek 20 N60/1300 26 South Africa Dorper 40 N100/2500 100 United Kingdom Crystal Rig 25 N80/2500 62.5 Nordex USA, Inc. | Company Presentation | WindPower 2013 | Chicago | May 2013 Slide 9 AGENDA 1 Activities: Global / Americas 2 Financials and Bankability of Nordex WTG 3 The Nordex Efficiency Class 4 Availability Track Record 5 Projects & Service, Training Nordex USA, Inc. | Company Presentation | WindPower 2013 | Chicago | May 2013 Slide 10 THE NORDEX EFFICIENCY CLASS PRODUCT PORTFOLIO BUILT ON MORE THAN 8.7 GW OF INSTALLATIONS Type MW IEC Wind Class* Sound dB(A) N80/2500 2.5 Ia 103.0 N90/2500 2.5 I & II 105.5 N100/2500 2.5 II & III 106.0 N117/2400 2.4 III 105.0 N100/3300 3.3 I 105.5 N117/3000 3.0 II 106.0 * Net Capacity Factor** (%) 6.5 35.7 7.0 7.5 8.0 8.5 9.0 9.5 10.0 35.7 39.5 43.0 46.3 38.1 42.2 46.0 49.4 52.6 49.9 53.3 39.1 42.9 46.4 48.2 51.8 55.0 33.3 37.9 42.3 46.3 40.7 45.3 49.4 53.0 40.0 44.3 49.7 IEC I: strong wind; IEC II: moderate wind; IEC III: light wind ** Assuming net losses of 13% (wake, electrical, icing, technical availability), standard air density of 1.225 kg/m3 and Weibul k=2.5; average wind speed at hub height Nordex USA, Inc. | Company Presentation | WindPower 2013 | Chicago | May 2013 Slide 11 THE NORDEX EFFICIENCY CLASS FROM GENERATION GAMMA TO GENERATION DELTA FUTURE 2014 Portfolio Additions from 2014 N100/3300 By July 2014 22% AEP Current Product Portfolio 2012/2013 22% AEP CURRENT CURRENT N117/3000 By July 2014 High tower solutions of up to 141 meters: +50 meter tower height = +20.5% AEP Nordex “Anti-Icing System”: up to 25% increase in AEP achieved Nordex USA, Inc. | Company Presentation | WindPower 2013 | Chicago | May 2013 Slide 12 THE NORDEX EFFICIENCY CLASS FLEXIBLE TOWER HEIGHTS ARE KEY TO SUCCESS N117/2400: annual energy yield Higher yield due to greater hub heights + 21% Topographical obstacles, such as trees, may result in lower yields. At higher hub heights, +16% the wind quality is better. Hybrid Tower 141m (7.41m/s) 120m Tubular Steel Tower (7.16m/s) 91m Steel Tower Nordex USA, Inc. | Company Presentation | WindPower 2013 | Chicago | May 2013 (6.5m/s) Slide 13 AGENDA 1 Activities: Global / Americas 2 Financials and Bankability of Nordex WTG 3 The Nordex Efficiency Class 4 Availability Track Record 5 Projects & Service, Training Nordex USA, Inc. | Company Presentation | WindPower 2013 | Chicago | May 2013 Slide 14 AVAILABILITY TRACK RECORD WORLDWIDE AND USA AVAILABILITY 2.5 MW GLOBAL AVAILABILITY 1 Jan 2012 - 31 Dec 2012 # all WTG1: 1,868 Ø Availability: 98.09% 1 Jul 2011 - 30 Jun 2012 # all WTG: 1,746 Ø Availability: 97.70% 1 Jan 2011 - 31 Dec 2011 # all WTG: 1,447 Ø Availability: 97.54% 1 Jul 2010 - 30 Jun 2011 # all WTG: 1,340 Ø Availability: 97.33% 1 2.5 MW installations globally with Nordex Availability Warranty; total installed base comprises 2,022 WTG as of 31 Dec 2012 2.5 MW US AVAILABILITY 2 1 Jan 2012 - 31 Dec 2012 # all WTG2: 225 Ø Availability: 98.56% 1 Jul 2011 - 30 Jun 2012 # all WTG: 178 Ø Availability: 98.44% 1 Jan 2011 - 31 Dec 2011 # all WTG: 113 Ø Availability: 97.75% 1 Jul 2010 - 30 Jun 2011 # all WTG: 33 Ø Availability: 97.03% 1 Jan 2010 - 31 Dec 2010 # all WTG: 25 Ø Availability: 97.09% total installed base in the United States comprises 270 WTG as of 31 Dec 2012 Nordex USA, Inc. | Company Presentation | WindPower 2013 | Chicago | May 2013 Slide 15 AGENDA 1 Activities: Global / Americas 2 Financials and Bankability of Nordex WTG 3 The Nordex Efficiency Class 4 Availability Track Record 5 Projects, Service & Training Nordex USA, Inc. | Company Presentation | WindPower 2013 | Chicago | May 2013 Slide 16 PROJECTS, SERVICE & TRAINING SERVICE CONTRACT OPTIONS AT A GLANCE Services* Contract Packages Premium Extended Basic Consulting & Support by Nordex Field Operations + Account Manager 24-hour Remote Monitoring including 24-hour Access and Remote Diagnostics Scheduled Maintenance & Inspection including Consumables and Reporting Unscheduled Maintenance Interventions at the Site (upon WTG controller alarms, etc.) Availability Warranty including Reporting Repair Work (labor) including fault diagnosis, excluding major WTG components (if removal for repair required) Repair Work (labor) for major component repairs, if removal for repairs required Spare Parts Supply excluding major components Spare Parts Supply for major components of WTG Condition Monitoring including Analysis and Reporting Inspection of Protective Equipment (PSE & WTG safety equipment) Individual Training for operators, operations managers & technicians Modernization & Upgrades (individual modifications, large-scale modernization measures & upgrade packages for component retrofitting) *The servic es in eac h service pac kage c an also be ordered individually, outside the c ontract packages. Contracted Service Scope Optional Contracted Service Scope Additional Service Scope (separate order) Full service scope and repair contracts are available for 3, 5, 10 years or even longer terms. Nordex USA, Inc. | Company Presentation | WindPower 2013 | Chicago | May 2013 Slide 17 PROJECTS, SERVICE & TRAINING MATERIALS MANAGEMENT & PARTS LOGISTICS MATERIALS MANAGEMENT & PARTS LOGISTICS Central depot for turbine components including large-scale items for all turbine types in Jonesboro, Arkansas and Rostock, Germany Electronic, web-based information system ensures spare parts are in stock Worldwide dispatch of spare parts 365 days/year Delivery to project site of most parts within 24 h Nordex USA, Inc. | Company Presentation | WindPower 2013 | Chicago | May 2013 Slide 18 PROJECTS, SERVICE & TRAINING TRAINING FACILITIES AND SCOPE TRAINING FACILITIES AND SCOPE State-of-the-art equipment and training resources Various Nordex-specific WTG components for hands-on maintenance and troubleshooting for field technicians Complete set of required training tools High tower rescue training with platform available in workshop area Wind Technician I Program: 3-week program to provide technicians with necessary skills for turbine maintenance Wind Technician II Program: 5-week program to provide technicians with necessary skills to assist in WTG commissioning process Nordex USA, Inc. | Company Presentation | WindPower 2013 | Chicago | May 2013 Slide 19 NORDEX SALES CONTACTS Americas Nordex USA, Inc. 300 South Wacker Drive, Suite 1500 Chicago, Illinois 60606, USA phone: fax: email: +1 (312) 386-4100 +1 (312) 386-4101 [email protected] EMEA Nordex Energy GmbH Langenhorner Chaussee 600 22419 Hamburg, Germany phone: fax: email: +49 (40) 30030-1100 +49 (40) 30030-1101 [email protected] Asia-Pacific Nordex (Beijing) WP Co. Ltd. First Shanghai Center 39, Liangmaqiao Road, Chaoyang District 100016 Beijing, P. R. China phone: fax: email: +86 (10) 84535188 +86 (10) 84535158 [email protected] Nordex USA, Inc. | Company Presentation | WindPower 2013 | Chicago | May 2013 Slide 20
© Copyright 2024 ExpyDoc