Detail of Contract awarded upto January, 2012 Project Planning & Development Department 4. PP&D/RVNL/ KURBOLANGIR/2010 21.08.10 21.09.10 M/S Feedback Ventures Pvt. Ltd. Bankability study of electrification of Nallapadu-Guntakal section RVNL/PP&D/Babk ability/NallapaduGuntakal/RE/10 11/06/2010 Project Consultancy services for development of PPP model in Railway projects. PP&D/RFP/BOT/ CONSULT/2009/P t. II dated: 25.03.2010 Bankability study for Khurda RoadBolangir New Line project. PP&D/RVNL/ KURBOLANGIR/2010 04/10/2010 M/s Pricewaterhouse Coopers Pvt. Ltd 13,18,085/- RVNL/PP&D/Bank ability/BuramaraChakulia/10 30/04/2010 Tendered cost (Rs.) 9,91,514/- Bankability study of Buramara-Chakulia New Line with upgradation of Rupsa-Buramara BG Line on SER. Estimated cost of work (Rs.) 15,00,000/- Contractor’s Name M/s. RITES Ltd. M/S Deloitte Touche Tohmatsu India Pvt. Ltd. 15,00,000/- PP&D/RFP/BOT/CO NSULT/2009/Pt. II 09/04/10 Contract No. & date (LOA) 9,65,125/- 3. RVNL/PP&D/Bankabil ity/Nallapadu Guntakal/RE/10 Description of work/study 15,00,000/- 2 RVNL/PP&D/Bankabil ity/Buramara Chakulia/10 Date of opening (Tender) 25/03/10 30,93,293/- 1 Tender No. 15,00,000/- Sr. No. Scheduled completion date 3 months from the date of submission of Bank Guarantee (14/05/2010) Physical Progress ( upto 31.01.12) Final Report sent to Railway Board on 16.08.11 for acceptance. 15/08/2010 (extended) 3 months from the date of submission of Bank Guarantee (25/06/2010) Final Report sent to Railway Board on 04.08.11 for acceptance. 25/09/2010 (extended) 26 weeks from the date of acceptance of LOA(25/03/2010) 25/09/2010 (extended) 10 weeks from the date of acceptance of CV(15/10/2010) 25/01/2011) Final Report sent to Railway Board on 21.09.11 for acceptance. Final Report sent to Railway Board on 02.02.11 for acceptance. 9. PP&D/RVNL/MCLANLDA/Bank/2010 PP&D/RVNL/ADI UDZ/Bank/2010 N.A. Study done in house. N.A. Study done in house. PP&D/FT/HUK/20 10 dated 08.02.2011 Bankability study for MacherlaNalgonda New Line project in South Central Railway. PP&D/RVNL / MCLA – NLDA / BANKA / 2010 dated 21.02.11 Bankability study for Ahmedabad Udaipur Gauge Conversion project in Western Railway. N.A. Traffic Study to Sh.Sanjeeva SHivesh ( ex IRAS), CEO, Smart Wave Consulting Pvt. Ltd., 410/CA, Shushant Lok, Cblock, Sec.-43, Gurgaon. N.A. Study done in house. 12,89,340/- 14,50,100/1,95,000/- Feasibility Study for Development of Freight Terminal at Holambi Kalan on Northern Railway. Traffic Study to Shri H.S.Duggal, Rtd.COM, Indian Railways,C/2/21, Goyal Inter City, Block-C, Drive in Road, Thaltej, Ahemedabad-54 M/S Deloitte Touche Tohmatsu India Pvt. Ltd. 8,76,885/- 21.01.11 PP&D/RVNL/DHD -INDB/Bank/2010 dated 24.12.2010 1,75,000/- PP&D/FT/HUK/2010 Study done in house. Bankability study for Dahod-Indore New Line project in Western Railway. M/s Pricewaterhouse Coopers Pvt. Ltd. ------- N.A. PP&D/RVNL/ HXSBC/2010 24/09/2010 8 weeks from the date of acceptance of CV(06/10/2010) 2/12/2010 Final Report sent to Railway Board on 30.12.11 for acceptance. 6 weeks from LAO (24.12.10) for Traffic Study which is out sourced. Final report is under examination by RVNL Finance. 16 weeks from the date of acceptance of CV(18/02/2011) Draft Final report is under examination. 10/06/2011) 4 weeks from LOA (21.02.11) for Traffic Study which is out sourced. Revised Final report is under examination by RVNL Finance. 20.03.2011 N.A. ------ 8. PP&D/RVNL/DHDINDB/Bank/2010 Bankability study for CuddapahBangalore New Line project. 5,00,000/- 7. 23.08.10 ------ 6. PP&D/RVNL/ HXSBC/2010 ------ 5. Study done in house and Completed, Report sent to Rly. Board on 31.12.2010. 13. No. RVNL/PP&D/RFP/PN U-SIOB/2011 04/01/11 16.01.12 Bankability study of Rayadurg-Tumkur New line in South Western Railway No. PP&D/RVNL/ RDG-TK /BANK/2010 Dated: 19/04/2011 M/s Deloitte Touche Tohmatsu India Pvt. Ltd. No. RVNL/PP&D/RFP/ PNU-SIOB/2011 Dated: 23.01.2012 M/s. Feedback Infrastructure Services Pvt.Ltd. 12,28,179.47 M/s ARKITECHNO Consultants (India) Pvt. Ltd 9,71,168.00 No. PP&D/RVNL/DWR BGM/BANK/Tende r/2010 Dated: 04/04/2011 15,00,000.00 Bankability study of Dharwad – Belgaum New line in South Western Railway Bankability study of Palanpur-Samkhyali doubling project in WR. M/s Deloitte Touche Tohmatsu India Pvt. Ltd. 14,89,000.00 No. PP&D/RVNL/BJPSDB/BANK/2010 Dated: 08/03/2011 12,28,179.47 No. PP&D/RVNL/ RDG-TK / BANK/2010 27/12/10 Bankability study of Bijapur Shahabad New line in South Western Railway 7,49,000.00 12. No. PP&D/RVNL/DWR BGM/BANK/ 2010 20/12/10 14,89,000.00 11. No. PP&D/RVNL/BJP -SDB/BANK/2010 7,00,000.00 10. (3 months from LOA dated 08.03.2011) 06/06/2011 (3 months from LOA dated 04.04.2011) 03/07/2011 (3 months from LOA dated 19.04.2011) 18.07.2011 (6 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 30.01.2012) 09.03. 2012 Final Report sent to Railway Board on 30.12.11 for acceptance. Final Report sent to Railway Board on 30.12.11 for acceptance. Final Report sent to Railway Board on 30.12.11 for acceptance. Detail of Contract awarded upto February, 2012 Project Planning & Development Department 4. PP&D/RVNL/ KURBOLANGIR/2010 21.08.10 21.09.10 M/S Feedback Ventures Pvt. Ltd. Bankability study of electrification of Nallapadu-Guntakal section RVNL/PP&D/Babk ability/NallapaduGuntakal/RE/10 11/06/2010 Project Consultancy services for development of PPP model in Railway projects. PP&D/RFP/BOT/ CONSULT/2009/P t. II dated: 25.03.2010 Bankability study for Khurda RoadBolangir New Line project. PP&D/RVNL/ KURBOLANGIR/2010 04/10/2010 M/s Pricewaterhouse Coopers Pvt. Ltd 13,18,085/- RVNL/PP&D/Bank ability/BuramaraChakulia/10 30/04/2010 Tendered cost (Rs.) 9,91,514/- Bankability study of Buramara-Chakulia New Line with upgradation of Rupsa-Buramara BG Line on SER. Estimated cost of work (Rs.) 15,00,000/- Contractor’s Name M/s. RITES Ltd. M/S Deloitte Touche Tohmatsu India Pvt. Ltd. 15,00,000/- PP&D/RFP/BOT/CO NSULT/2009/Pt. II 09/04/10 Contract No. & date (LOA) 9,65,125/- 3. RVNL/PP&D/Bankabil ity/Nallapadu Guntakal/RE/10 Description of work/study 15,00,000/- 2 RVNL/PP&D/Bankabil ity/Buramara Chakulia/10 Date of opening (Tender) 25/03/10 30,93,293/- 1 Tender No. 15,00,000/- Sr. No. Scheduled completion date 3 months from the date of submission of Bank Guarantee (14/05/2010) Physical Progress ( upto 29.02.12) Final Report sent to Railway Board on 16.08.11 for acceptance. 15/08/2010 (extended) 3 months from the date of submission of Bank Guarantee (25/06/2010) Final Report sent to Railway Board on 04.08.11 for acceptance. 25/09/2010 (extended) 26 weeks from the date of acceptance of LOA(25/03/2010) 25/09/2010 (extended) 10 weeks from the date of acceptance of CV(15/10/2010) 25/01/2011) Final Report sent to Railway Board on 21.09.11 for acceptance. Final Report sent to Railway Board on 02.02.11 for acceptance. 9. PP&D/RVNL/MCLANLDA/Bank/2010 PP&D/RVNL/ADI UDZ/Bank/2010 N.A. Study done in house. N.A. Study done in house. PP&D/FT/HUK/20 10 dated 08.02.2011 Bankability study for MacherlaNalgonda New Line project in South Central Railway. PP&D/RVNL / MCLA – NLDA / BANKA / 2010 dated 21.02.11 Bankability study for Ahmedabad Udaipur Gauge Conversion project in Western Railway. N.A. Traffic Study to Sh.Sanjeeva SHivesh ( ex IRAS), CEO, Smart Wave Consulting Pvt. Ltd., 410/CA, Shushant Lok, Cblock, Sec.-43, Gurgaon. N.A. Study done in house. 12,89,340/- 14,50,100/1,95,000/- Feasibility Study for Development of Freight Terminal at Holambi Kalan on Northern Railway. Traffic Study to Shri H.S.Duggal, Rtd.COM, Indian Railways,C/2/21, Goyal Inter City, Block-C, Drive in Road, Thaltej, Ahemedabad-54 M/S Deloitte Touche Tohmatsu India Pvt. Ltd. 8,76,885/- 21.01.11 PP&D/RVNL/DHD -INDB/Bank/2010 dated 24.12.2010 1,75,000/- PP&D/FT/HUK/2010 Study done in house. Bankability study for Dahod-Indore New Line project in Western Railway. M/s Pricewaterhouse Coopers Pvt. Ltd. ------- N.A. PP&D/RVNL/ HXSBC/2010 24/09/2010 8 weeks from the date of acceptance of CV(06/10/2010) 2/12/2010 Final Report sent to Railway Board on 30.12.11 for acceptance. 6 weeks from LAO (24.12.10) for Traffic Study which is out sourced. Final report is under examination by RVNL Finance. 16 weeks from the date of acceptance of CV(18/02/2011) Draft Final report is under examination. 10/06/2011) 4 weeks from LOA (21.02.11) for Traffic Study which is out sourced. Revised Final report is under examination by RVNL Finance. 20.03.2011 N.A. ------ 8. PP&D/RVNL/DHDINDB/Bank/2010 Bankability study for CuddapahBangalore New Line project. 5,00,000/- 7. 23.08.10 ------ 6. PP&D/RVNL/ HXSBC/2010 ------ 5. Study done in house and Completed, Report sent to Rly. Board on 31.12.2010. 13. No. RVNL/PP&D/RFP/PN U-SIOB/2011 04/01/11 16.01.12 Bankability study of Rayadurg-Tumkur New line in South Western Railway No. PP&D/RVNL/ RDG-TK /BANK/2010 Dated: 19/04/2011 M/s Deloitte Touche Tohmatsu India Pvt. Ltd. No. RVNL/PP&D/RFP/ PNU-SIOB/2011 Dated: 23.01.2012 M/s. Feedback Infrastructure Services Pvt. Ltd. 12,28,179.47 M/s ARKITECHNO Consultants (India) Pvt. Ltd 9,71,168.00 No. PP&D/RVNL/DWR BGM/BANK/Tende r/2010 Dated: 04/04/2011 15,00,000.00 Bankability study of Dharwad – Belgaum New line in South Western Railway Bankability study of Palanpur-Samkhyali doubling project in WR. M/s Deloitte Touche Tohmatsu India Pvt. Ltd. 14,89,000.00 No. PP&D/RVNL/BJPSDB/BANK/2010 Dated: 08/03/2011 12,28,179.47 No. PP&D/RVNL/ RDG-TK / BANK/2010 27/12/10 Bankability study of Bijapur Shahabad New line in South Western Railway 7,49,000.00 12. No. PP&D/RVNL/DWR BGM/BANK/ 2010 20/12/10 14,89,000.00 11. No. PP&D/RVNL/BJP -SDB/BANK/2010 7,00,000.00 10. (3 months from LOA dated 08.03.2011) 06/06/2011 (3 months from LOA dated 04.04.2011) 03/07/2011 (3 months from LOA dated 19.04.2011) 18.07.2011 (6 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 30.01.2012) 09.03. 2012 Final Report sent to Railway Board on 30.12.11 for acceptance. Final Report sent to Railway Board on 30.12.11 for acceptance. Final Report sent to Railway Board on 30.12.11 for acceptance. Draft report submitted on 29.02.2012. Final report is under preparation. Detail of Contract awarded upto March, 2012 Project Planning & Development Department 4. PP&D/RVNL/ KURBOLANGIR/2010 21.08.10 21.09.10 M/S Feedback Ventures Pvt. Ltd. Bankability study of electrification of Nallapadu-Guntakal section RVNL/PP&D/Babk ability/NallapaduGuntakal/RE/10 11/06/2010 Project Consultancy services for development of PPP model in Railway projects. PP&D/RFP/BOT/ CONSULT/2009/P t. II dated: 25.03.2010 Bankability study for Khurda RoadBolangir New Line project. PP&D/RVNL/ KURBOLANGIR/2010 04/10/2010 M/s Pricewaterhouse Coopers Pvt. Ltd 13,18,085/- RVNL/PP&D/Bank ability/BuramaraChakulia/10 30/04/2010 Tendered cost (Rs.) 9,91,514/- Bankability study of Buramara-Chakulia New Line with upgradation of Rupsa-Buramara BG Line on SER. Estimated cost of work (Rs.) 15,00,000/- Contractor’s Name M/s. RITES Ltd. M/S Deloitte Touche Tohmatsu India Pvt. Ltd. 15,00,000/- PP&D/RFP/BOT/CO NSULT/2009/Pt. II 09/04/10 Contract No. & date (LOA) 9,65,125/- 3. RVNL/PP&D/Bankabil ity/Nallapadu Guntakal/RE/10 Description of work/study 15,00,000/- 2 RVNL/PP&D/Bankabil ity/Buramara Chakulia/10 Date of opening (Tender) 25/03/10 30,93,293/- 1 Tender No. 15,00,000/- Sr. No. Scheduled completion date 3 months from the date of submission of Bank Guarantee (14/05/2010) Physical Progress ( upto 31.03.12) Completed 15/08/2010 (extended) 3 months from the date of submission of Bank Guarantee (25/06/2010) Completed 25/09/2010 (extended) 26 weeks from the date of acceptance of LOA(25/03/2010) Completed 25/09/2010 (extended) 10 weeks from the date of acceptance of CV(15/10/2010) 25/01/2011) Completed 8. PP&D/RVNL/MCLANLDA/Bank/2010 21.01.11 N.A. Study done in house. 9. PP&D/RVNL/ADI UDZ/Bank/2010 N.A. Study done in house. PP&D/FT/HUK/20 10 dated 08.02.2011 Bankability study for MacherlaNalgonda New Line project in South Central Railway. PP&D/RVNL / MCLA – NLDA / BANKA / 2010 dated 21.02.11 Bankability study for Ahmedabad Udaipur Gauge Conversion project in Western Railway. N.A. Traffic Study to Sh.Sanjeeva SHivesh ( ex IRAS), CEO, Smart Wave Consulting Pvt. Ltd., 410/CA, Shushant Lok, Cblock, Sec.-43, Gurgaon. N.A. Study done in house. 12,89,340/- 14,50,100/1,95,000/- Feasibility Study for Development of Freight Terminal at Holambi Kalan on Northern Railway. Traffic Study to Shri H.S.Duggal, Rtd.COM, Indian Railways,C/2/21, Goyal Inter City, Block-C, Drive in Road, Thaltej, Ahemedabad-54 M/S Deloitte Touche Tohmatsu India Pvt. Ltd. 8,76,885/- PP&D/FT/HUK/2010 PP&D/RVNL/DHD -INDB/Bank/2010 dated 24.12.2010 1,75,000/- 7. Bankability study for Dahod-Indore New Line project in Western Railway. M/s Pricewaterhouse Coopers Pvt. Ltd. 8 weeks from the date of acceptance of CV(06/10/2010) Completed 2/12/2010 6 weeks from LAO (24.12.10) for Traffic Study which is out sourced. Final report is under examination by RVNL Finance since 07.02.2012. 16 weeks from the date of acceptance of CV(18/02/2011) Draft Final report is under examination. 10/06/2011) 4 weeks from LOA (21.02.11) for Traffic Study which is out sourced. Revised Final report is under examination by RVNL Finance since 22.12.2011. 20.03.2011 N.A. ------ Study done in house. PP&D/RVNL/ HXSBC/2010 24/09/2010 ------- N.A. Bankability study for CuddapahBangalore New Line project. 5,00,000/- PP&D/RVNL/DHDINDB/Bank/2010 23.08.10 ------ 6. PP&D/RVNL/ HXSBC/2010 ------ 5. Completed No. RVNL/PP&D/RFP/PN U-SIOB/2011 16.01.12 Bankability study of Palanpur-Samkhyali doubling project in WR. No. PP&D/RVNL/DWR BGM/BANK/Tende r/2010 Dated: 04/04/2011 M/s ARKITECHNO Consultants (India) Pvt. Ltd No. PP&D/RVNL/ RDG-TK /BANK/2010 Dated: 19/04/2011 M/s Deloitte Touche Tohmatsu India Pvt. Ltd. No. RVNL/PP&D/RFP/ PNU-SIOB/2011 Dated: 23.01.2012 M/s. Feedback Infrastructure Services Pvt. Ltd. 12,28,179.47 15,00,000.00 Completed (3 months from LOA dated 08.03.2011) 06/06/2011 Completed 9,71,168.00 Bankability study of Rayadurg-Tumkur New line in South Western Railway M/s Deloitte Touche Tohmatsu India Pvt. Ltd. 12,28,179.47 04/01/11 Bankability study of Dharwad – Belgaum New line in South Western Railway No. PP&D/RVNL/BJPSDB/BANK/2010 Dated: 08/03/2011 7,49,000.00 13. No. PP&D/RVNL/ RDG-TK / BANK/2010 27/12/10 Bankability study of Bijapur Shahabad New line in South Western Railway 14,89,000.00 12. No. PP&D/RVNL/DWR BGM/BANK/ 2010 20/12/10 14,89,000.00 11. No. PP&D/RVNL/BJP -SDB/BANK/2010 7,00,000.00 10. (3 months from LOA dated 04.04.2011) 03/07/2011 Completed (3 months from LOA dated 19.04.2011) 18.07.2011 (6 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 30.01.2012) 09.03. 2012 Final report submitted on 23.03.2012 is under examination by Kutch Railway Company Ltd. (KRC). Detail of Contract awarded upto MAY, 2012 Project Planning & Development Department PP&D/RVNL/MCLANLDA/Bank/2010 N.A. Study done in house. 13. No. RVNL/PP&D/RFP/PN U-SIOB/2011 16.01.12 Feasibility Study for Development of Freight Terminal at Holambi Kalan on Northern Railway. PP&D/FT/HUK/20 10 dated 08.02.2011 Traffic Study to Shri H.S.Duggal, Rtd.COM, Indian Railways,C/2/21, Goyal Inter City, Block-C, Drive in Road, Thaltej, Ahemedabad-54 M/S Deloitte Touche Tohmatsu India Pvt. Ltd. Bankability study for MacherlaNalgonda New Line project in South Central Railway. PP&D/RVNL / MCLA – NLDA / BANKA / 2010 dated 21.02.11 Bankability study of Palanpur-Samkhyali doubling project in WR. No. RVNL/PP&D/RFP/ PNU-SIOB/2011 Dated: 23.01.2012 Traffic Study to Sh.Sanjeeva SHivesh ( ex IRAS), CEO, Smart Wave Consulting Pvt. Ltd., 410/CA, Shushant Lok, Cblock, Sec.-43, Gurgaon. M/s. Feedback Infrastructure Services Pvt. Ltd. 1,95,000/- PP&D/RVNL/DHD -INDB/Bank/2010 dated 24.12.2010 Tendered cost (Rs.) 8,76,885/- 21.01.11 Bankability study for Dahod-Indore New Line project in Western Railway. Estimated cost of work (Rs.) 1,75,000/- 3. PP&D/FT/HUK/2010 Contractor’s Name 7,49,000.00 2. Contract No. & date (LOA) ------- Study done in house. Description of work/study 5,00,000/- PP&D/RVNL/DHDINDB/Bank/2010 Date of opening (Tender) N.A. ------ 1. Tender No. 7,00,000.00 Sr. No. Scheduled completion date 6 weeks from LAO (24.12.10) for Traffic Study which is out sourced. 16 weeks from the date of acceptance of CV(18/02/2011) Physical Progress ( upto 31.05.12) Final report is under examination by RVNL Finance since 07.02.2012. Draft Final report is under examination. 10/06/2011) 4 weeks from LOA (21.02.11) for Traffic Study which is out sourced. Revised Final report is under examination by RVNL Finance since 22.12.2011. 20.03.2011 (6 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 30.01.2012) 09.03. 2012 Final report approved by RVNL BOD on 19.05.12 and being sent to Rly. Bd. For acceptance. Detail of Contract awarded upto JUNE, 2012 Project Planning & Development Department PP&D/RVNL/MCLANLDA/Bank/2010 N.A. Study done in house. 13. No. RVNL/PP&D/RFP/PN U-SIOB/2011 16.01.12 Feasibility Study for Development of Freight Terminal at Holambi Kalan on Northern Railway. PP&D/FT/HUK/20 10 dated 08.02.2011 Traffic Study to Shri H.S.Duggal, Rtd.COM, Indian Railways,C/2/21, Goyal Inter City, Block‐C, Drive in Road, Thaltej, Ahemedabad‐54 M/S Deloitte Touche Tohmatsu India Pvt. Ltd. Bankability study for Macherla‐ Nalgonda New Line project in South Central Railway. PP&D/RVNL / MCLA – NLDA / BANKA / 2010 dated 21.02.11 Bankability study of Palanpur-Samkhyali doubling project in WR. No. RVNL/PP&D/RFP/ PNU-SIOB/2011 Dated: 23.01.2012 Traffic Study to Sh.Sanjeeva SHivesh ( ex IRAS), CEO, Smart Wave Consulting Pvt. Ltd., 410/CA, Shushant Lok, C‐ block, Sec.‐43, Gurgaon. M/s. Feedback Infrastructure Services Pvt. Ltd. 1,95,000/- PP&D/RVNL/DHD -INDB/Bank/2010 dated 24.12.2010 Tendered cost (Rs.) 8,76,885/- 21.01.11 Bankability study for Dahod‐Indore New Line project in Western Railway. Estimated cost of work (Rs.) 1,75,000/- 3. PP&D/FT/HUK/2010 Contractor’s Name 7,49,000.00 2. Contract No. & date (LOA) ------- Study done in house. Description of work/study 5,00,000/- PP&D/RVNL/DHDINDB/Bank/2010 Date of opening (Tender) N.A. ------ 1. Tender No. 7,00,000.00 Sr. No. Scheduled completion date 6 weeks from LAO (24.12.10) for Traffic Study which is out sourced. 16 weeks from the date of acceptance of CV(18/02/2011) Final report is under examination. 10/06/2011) 4 weeks from LOA (21.02.11) for Traffic Study which is out sourced. Final report is being placed before RVNL BOD for approval. 20.03.2011 (6 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 30.01.2012) 09.03. 2012 Physical Progress ( upto 30.06.12) Final report is being placed before RVNL BOD for approval. Final Report sent to Railway Board on 26.06.12 for acceptance. Detail of Contract awarded upto AUGUST, 2012 Project Planning & Development Department 3. PP&D/FT/HUK/2010 PP&D/RVNL/MCLANLDA/Bank/2010 21.01.11 N.A. Study done in house. Bankability study for Dahod-Indore New Line project in Western Railway. PP&D/RVNL/DH DINDB/Bank/2010 dated 24.12.2010 Feasibility Study for Development of Freight Terminal at Holambi Kalan on Northern Railway. PP&D/FT/HUK/2 010 dated 08.02.2011 Traffic Study to Shri H.S.Duggal, Rtd.COM, Indian Railways,C/2/2 1, Goyal Inter City, Block-C, Drive in Road, Thaltej, Ahemedabad54 M/S Deloitte Touche Tohmatsu India Pvt. Ltd. Bankability study for MacherlaNalgonda New Line project in South Central Railway. PP&D/RVNL / MCLA – NLDA / BANKA / 2010 dated 21.02.11 Traffic Study to Sh.Sanjeeva SHivesh ( ex IRAS), CEO, Smart Wave Consulting Pvt. Ltd., 410/CA, Shushant Lok, C-block, Sec.43, Gurgaon. Estimated cost of work (Rs.) Tendered cost (Rs.) 1,95,000/- Contractor’s Name 8,76,885/- 2. Contract No. & date (LOA) 1,75,000/- Study done in house. Description of work/study ------- PP&D/RVNL/DHDINDB/Bank/2010 Date of opening (Tender) N.A. 5,00,000/- 1. Tender No. ------ Sr. No. Scheduled completion date 6 weeks from LAO (24.12.10) for Traffic Study which is out sourced. 16 weeks from the date of acceptance of CV(18/02/2011) Physical Progress ( upto 31.08.12) Final report is being placed before RVNL BOD for approval. Final report is under examination. 10/06/2011) 4 weeks from LOA (21.02.11) for Traffic Study which is out sourced. 20.03.2011 Final report is being placed before RVNL BOD for approval. RVNL/PP&D/RF P/PNUSIOB/2011 Dated: 23.01.2012 24.07.2012 Bankability study PP&D/RVNL/SIOB -GIMB/Bank/2012 Dated: 21.08.2012 of Samkhyali – Gandhidham 3rd Line project in WR. M/s. Feedback Infrastructure Services Pvt. Ltd. M/s. Feedback Infrastructure Services Pvt. Ltd. 7,49,000.00 PP&D/RVNL/SIOBGIMB/Bank/2012 Bankability study of PalanpurSamkhyali doubling project in WR. 11,89,892.00 5. 16.01.12 7,00,000.00 RVNL/PP&D/RFP/PN U-SIOB/2011 15,20,000.00 4. (6 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 30.01.2012) 09.03. 2012 (16 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 31.08.2012) 24.12. 2012 Completed Study is under process. Detail of Contract awarded upto SEPTEMBER, 2012 Project Planning & Development Department 2. 3. PP&D/FT/HUK/2010 PP&D/RVNL/MCLANLDA/Bank/2010 Bankability study for MacherlaNalgonda New Line project in South Central Railway. PP&D/RVNL / MCLA – NLDA / BANKA / 2010 dated 21.02.11 24.07.2012 Bankability study PP&D/RVNL/SIOB -GIMB/Bank/2012 Dated: 21.08.2012 Traffic Study to Sh.Sanjeeva SHivesh ( ex IRAS), CEO, Smart Wave Consulting Pvt. Ltd., 410/CA, Shushant Lok, C-block, Sec.-43, Gurgaon. M/s. Feedback Infrastructure Services Pvt. Ltd. PP&D/RVNL/REW AS/2012/Tender Dated: 03.09.2012 M/s GRANT THRONTON ADVISORY Pvt. Ltd. 21.01.11 N.A. Study done in house. 4. 6. PP&D/RVNL/SIOBGIMB/Bank/2012 of Samkhyali – Gandhidham 3rd Line project in WR. PP&D/RVNL/REWAS/ 13.08.2012 Bankability study 2012/Tender of Rewas Port 1,95,000/- PP&D/FT/HUK/2 010 dated 08.02.2011 Study done in house. 8,76,885/- Feasibility Study for Development of Freight Terminal at Holambi Kalan on Northern Railway. Traffic Study to Shri H.S.Duggal, Rtd.COM, Indian Railways,C/2/21, Goyal Inter City, Block-C, Drive in Road, Thaltej, Ahemedabad-54 M/S Deloitte Touche Tohmatsu India Pvt. Ltd. 1,75,000/- PP&D/RVNL/DH DINDB/Bank/2010 dated 24.12.2010 Tendered cost (Rs.) Scheduled completion date 6 weeks from LAO (24.12.10) for Traffic Study which is out sourced. 16 weeks from the date of acceptance of CV(18/02/2011) Physical Progress ( upto 30.09.12) Final report has been placed before RVNL BOD for approval. Completed. 10/06/2011) 4 weeks from LOA (21.02.11) for Traffic Study which is out sourced. Final report has been placed before RVNL BOD for approval. 20.03.2011 11,89,892.00 Bankability study for Dahod-Indore New Line project in Western Railway. Estimated cost of work (Rs.) (16 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 31.08.2012) 7,80,902.00 Contractor’s Name ------- Contract No. & date (LOA) 5,00,000/- Description of work/study ------ PP&D/RVNL/DHDINDB/Bank/2010 Date of opening (Tender) N.A. 15,20,000.00 1. Tender No. 15,00,000.00 Sr. No. 24.12. 2012 (10 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 10.09.2012) 19.11. 2012 Study is under progress. Study is under progress. Detail of Contract awarded upto OCTOBER, 2012 Project Planning & Development Department Bankability study for Dahod-Indore New Line project in Western Railway. PP&D/RVNL/DH DINDB/Bank/2010 dated 24.12.2010 Bankability study for MacherlaNalgonda New Line project in South Central Railway. PP&D/RVNL / MCLA – NLDA / BANKA / 2010 dated 21.02.11 24.07.2012 Bankability study PP&D/RVNL/SIOB -GIMB/Bank/2012 Dated: 21.08.2012 Traffic Study to Shri H.S.Duggal, Rtd.COM, Indian Railways,C/2/2 1, Goyal Inter City, Block-C, Drive in Road, Thaltej, Ahemedabad54 Traffic Study to Sh.Sanjeeva SHivesh ( ex IRAS), CEO, Smart Wave Consulting Pvt. Ltd., 410/CA, Shushant Lok, C-block, Sec.43, Gurgaon. M/s. Feedback Infrastructure Services Pvt. Ltd. Study done in house. 3. PP&D/RVNL/MCLANLDA/Bank/2010 N.A. Study done in house. 4. PP&D/RVNL/SIOBGIMB/Bank/2012 of Samkhyali – Gandhidham 3rd Line project in WR. Estimated cost of work (Rs.) Tendered cost (Rs.) 1,95,000/- Contractor’s Name 1,75,000/- Contract No. & date (LOA) 11,89,892.00 Description of work/study ------- PP&D/RVNL/DHDINDB/Bank/2010 Date of opening (Tender) N.A. ------ 1. Tender No. 15,20,000.00 Sr. No. Scheduled completion date 6 weeks from LAO (24.12.10) for Traffic Study which is out sourced. Physical Progress ( upto 31.10.12) Final report has been approved by RVNL BOD for being sent to Railway Board. 4 weeks from LOA (21.02.11) for Traffic Study which is out sourced. Final report has been approved by RVNL BOD for being sent to Railway Board. 20.03.2011 (16 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 31.08.2012) 24.12. 2012 Study is under progress. PP&D/RVNL/REW AS/2012/Tender Dated: 03.09.2012 M/s GRANT THRONTON ADVISORY Pvt. Ltd. 7,80,902.00 PP&D/RVNL/REWAS/ 13.08.2012 Bankability study 2012/Tender of Rewas Port 15,00,000.00 6. (10 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 10.09.2012) 19.11. 2012 Traffic study report received on 29.10.2012 and same is under examination. Detail of Contract awarded upto NOVEMBER, 2012 Project Planning & Development Department Bankability study for Dahod-Indore New Line project in Western Railway. PP&D/RVNL/DH DINDB/Bank/2010 dated 24.12.2010 Bankability study for MacherlaNalgonda New Line project in South Central Railway. PP&D/RVNL / MCLA – NLDA / BANKA / 2010 dated 21.02.11 24.07.2012 Bankability study PP&D/RVNL/SIOB -GIMB/Bank/2012 Dated: 21.08.2012 Traffic Study to Shri H.S.Duggal, Rtd.COM, Indian Railways,C/2/2 1, Goyal Inter City, Block-C, Drive in Road, Thaltej, Ahemedabad54 Traffic Study to Sh.Sanjeeva SHivesh ( ex IRAS), CEO, Smart Wave Consulting Pvt. Ltd., 410/CA, Shushant Lok, C-block, Sec.43, Gurgaon. M/s. Feedback Infrastructure Services Pvt. Ltd. Study done in house. 3. PP&D/RVNL/MCLANLDA/Bank/2010 N.A. Study done in house. 4. PP&D/RVNL/SIOBGIMB/Bank/2012 of Samkhyali – Gandhidham 3rd Line project in WR. Estimated cost of work (Rs.) Tendered cost (Rs.) 1,95,000/- Contractor’s Name 1,75,000/- Contract No. & date (LOA) 11,89,892.00 Description of work/study ------- PP&D/RVNL/DHDINDB/Bank/2010 Date of opening (Tender) N.A. ------ 1. Tender No. 15,20,000.00 Sr. No. Scheduled completion date 6 weeks from LAO (24.12.10) for Traffic Study which is out sourced. Physical Progress ( upto 30.11.12) Final Report sent to Railway Board on 05.11.12 for acceptance. 4 weeks from LOA (21.02.11) for Traffic Study which is out sourced. Final Report sent to Railway Board on 05.11.12 for acceptance. 20.03.2011 (16 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 31.08.2012) 24.12. 2012 Draft report for traffic study received on 29.11.2012 and same is under examination. 16.11.2012 Bankability Study of Dighi Port NewLline Not Yet Awarded Not Yet Awarded 7,80,902.00 PP&D/RVNL/Dighi Port/2008/Pt.VI M/s GRANT THRONTON ADVISORY Pvt. Ltd. (10 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 10.09.2012) 19.11. 2012 Bid under evaluation ----------- 7. PP&D/RVNL/REW AS/2012/Tender Dated: 03.09.2012 15,00,000.00 PP&D/RVNL/REWAS/ 13.08.2012 Bankability study 2012/Tender of Rewas Port 12,00,000.00 6. Traffic study report received on 29.10.2012 and same is under examination. Bid under evaluation Detail of Contract awarded upto DECEMBER, 2012 Project Planning & Development Department Bankability study for Dahod‐Indore New Line project in Western Railway. PP&D/RVNL/DH DINDB/Bank/2010 dated 24.12.2010 Bankability study for Macherla‐ Nalgonda New Line project in South Central Railway. PP&D/RVNL / MCLA – NLDA / BANKA / 2010 dated 21.02.11 24.07.2012 Bankability study PP&D/RVNL/SIOB -GIMB/Bank/2012 Dated: 21.08.2012 Traffic Study to Shri H.S.Duggal, Rtd.COM, Indian Railways,C/2/2 1, Goyal Inter City, Block‐C, Drive in Road, Thaltej, Ahemedabad‐ 54 Traffic Study to Sh.Sanjeeva SHivesh ( ex IRAS), CEO, Smart Wave Consulting Pvt. Ltd., 410/CA, Shushant Lok, C‐block, Sec.‐ 43, Gurgaon. M/s. Feedback Infrastructure Services Pvt. Ltd. Study done in house. 3. PP&D/RVNL/MCLANLDA/Bank/2010 N.A. Study done in house. 4. PP&D/RVNL/SIOBGIMB/Bank/2012 of Samkhyali – Gandhidham 3rd Line project in WR. Estimated cost of work (Rs.) Tendered cost (Rs.) 1,95,000/- Contractor’s Name 1,75,000/- Contract No. & date (LOA) 11,89,892.00 Description of work/study ------- PP&D/RVNL/DHDINDB/Bank/2010 Date of opening (Tender) N.A. ------ 1. Tender No. 15,20,000.00 Sr. No. Scheduled completion date 6 weeks from LAO (24.12.10) for Traffic Study which is out sourced. 4 weeks from LOA (21.02.11) for Traffic Study which is out sourced. Physical Progress ( upto 31.12.12) Completed. Completed. 20.03.2011 (16 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 31.08.2012) 24.12. 2012 Draft report for traffic study received on 29.11.2012 and same is under examination. PP&D/RVNL/Dighi Port/2008/Pt.VI 16.11.2012 Bankability Study PP&D/RVNL/Dighi Port/2008/Pt.VI Dated: 19.12.2012 of Dighi Port NewLline M/s Feedback Infrastructure Services P.Ltd 7,80,902.00 7. M/s GRANT THRONTON ADVISORY Pvt. Ltd. 8,93,262.00 PP&D/RVNL/REW AS/2012/Tender Dated: 03.09.2012 15,00,000.00 PP&D/RVNL/REWAS/ 13.08.2012 Bankability study 2012/Tender of Rewas Port 12,00,000.00 6. (10 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 10.09.2012) 19.11. 2012 CVs under acceptance Revised Traffic study report received on 18.12.2012 and same is under examination. CVs under acceptance Detail of Contract awarded upto JANUARY, 2013 Project Planning & Development Department M/s. Feedback Infrastructure Services Pvt. Ltd. 2. PP&D/RVNL/REWAS/ 13.08.2012 Bankability study 2012/Tender of Rewas Port PP&D/RVNL/REW AS/2012/Tender Dated: 03.09.2012 M/s GRANT THRONTON ADVISORY Pvt. Ltd. 3. PP&D/RVNL/Dighi Port/2008/Pt.VI 16.11.2012 Bankability Study PP&D/RVNL/Dighi Port/2008/Pt.VI Dated: 19.12.2012 M/s Feedback Infrastructure Services P.Ltd of Dighi Port NewLline Tendered cost (Rs.) Scheduled completion date 11,89,892.00 PP&D/RVNL/SIOB -GIMB/Bank/2012 Dated: 21.08.2012 Estimated cost of work (Rs.) (16 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 31.08.2012) 7,80,902.00 Contractor’s Name 24.12. 2012 (10 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 10.09.2012) 8,93,262.00 of Samkhyali – Gandhidham 3rd Line project in WR. Contract No. & date (LOA) 15,20,000.00 PP&D/RVNL/SIOBGIMB/Bank/2012 Date of Description of opening work/study (Tender) 24.07.2012 Bankability study 15,00,000.00 1. Tender No. 12,00,000.00 Sr. No. 19.11. 2012 (12 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 07.01.2013) 01.04. 2013 Physical Progress ( upto 31.01.13) Draft report for traffic study received on 29.11.2012. Revised Draft Final report is under preparation by the Consultant. Revised Traffic study report received on 18.12.2012. Revised Draft Final report is under preparation by the Consultant. Inception Report submitted on 20.01.2013 27.12.2012 Consultancy Services to Develop various Model Agrements of new Policy on Participative models in rail connectivity and capacity augmentation projects. RVNL/PP&D/Mode l/Agreement/2012 Dated 03.01.2013 M/s HSA Advocates ( Hemant Sahai Associates) Kick – off meeting held on 15.01.2013 37,50,000.00 RVNL/PP&D/Model/A greement/2012 40,00,000.00 4. N.A. Detail of Contract awarded upto FEBRUARY, 2013 Project Planning & Development Department M/s. Feedback Infrastructure Services Pvt. Ltd. 2. PP&D/RVNL/REWAS/ 13.08.2012 Bankability study 2012/Tender of Rewas Port PP&D/RVNL/REW AS/2012/Tender Dated: 03.09.2012 M/s GRANT THRONTON ADVISORY Pvt. Ltd. 3. PP&D/RVNL/Dighi Port/2008/Pt.VI 16.11.2012 Bankability Study PP&D/RVNL/Dighi Port/2008/Pt.VI Dated: 19.12.2012 M/s Feedback Infrastructure Services P.Ltd of Dighi Port NewLline Tendered cost (Rs.) Scheduled completion date 11,89,892.00 PP&D/RVNL/SIOB -GIMB/Bank/2012 Dated: 21.08.2012 Estimated cost of work (Rs.) (16 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 31.08.2012) 7,80,902.00 Contractor’s Name 24.12. 2012 (10 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 10.09.2012) 8,93,262.00 of Samkhyali – Gandhidham 3rd Line project in WR. Contract No. & date (LOA) 15,20,000.00 PP&D/RVNL/SIOBGIMB/Bank/2012 Date of Description of opening work/study (Tender) 24.07.2012 Bankability study 15,00,000.00 1. Tender No. 12,00,000.00 Sr. No. 19.11. 2012 (12 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 07.01.2013) 01.04. 2013 Physical Progress ( upto 28.02.13) Draft report for traffic study received on 29.11.2012. Revised Draft Final report is under preparation by the Consultant. Revised Traffic study report received on 18.12.2012. Revised Draft Final report is under preparation by the Consultant. Inception Report submitted on 20.01.2013 RVNL/PP&D/Mode l/Agreement/2012 Dated 03.01.2013 PP&D/RVNL/ANGLSKND/Bank/tender/ 2013 Dated 08.02.2013 M/s HSA Advocates ( Hemant Sahai Associates) M/s. Feedback Infrastructure Services Pvt. Ltd. 37,50,000.00 Services to Develop various Participative Model Agreements of new Policy in Rail connectivity and capacity augmentation projects. PP&D/RVNL/ANGL- 29.01.2013 Bankability Study of Angul – SKND/Bank/2012 Sukinda Road New Line 40,00,000.00 27.12.2012 Consultancy 13,47,196.00 5. RVNL/PP&D/Model/A greement/2012 12,0,000.00 4. N.A. (16 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 07.01.2013) 01.04. 2013 Initial draft has been 01.02.2013 submitted and presentation given/discussio n held on 27.02.2013. Kick – off meeting held on 05.03.2013 Detail of Contract awarded upto MARCH, 2013 Project Planning & Development Department 3. PP&D/RVNL/Dighi Port/2008/Pt.VI 16.11.2012 Bankability Study of Dighi Port NewLline M/s. Feedback Infrastructure Services Pvt. Ltd. PP&D/RVNL/REW AS/2012/Tender Dated: 03.09.2012 M/s GRANT THRONTON ADVISORY Pvt. Ltd. PP&D/RVNL/Dighi Port/2008/Pt.VI Dated: 19.12.2012 M/s Feedback Infrastructure Services P.Ltd Tendered cost (Rs.) 11,89,892.00 PP&D/RVNL/SIOB -GIMB/Bank/2012 Dated: 21.08.2012 Estimated cost of work (Rs.) 7,80,902.00 PP&D/RVNL/REWAS/ 13.08.2012 Bankability study 2012/Tender of Rewas Port Contractor’s Name 15,20,000.00 of Samkhyali – Gandhidham 3rd Line project in WR. Contract No. & date (LOA) 8,93,262.00 2. PP&D/RVNL/SIOBGIMB/Bank/2012 Date of Description of opening work/study (Tender) 24.07.2012 Bankability study 15,00,000.00 1. Tender No. 12,00,000.00 Sr. No. Scheduled completion date (16 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 31.08.2012) 24.12. 2012 (10 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 10.09.2012) 19.11. 2012 (12 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 07.01.2013) 01.04. 2013 Physical Progress ( upto 31.03.13) Draft report for traffic study received on 29.11.2012. Revised Draft Final report is under preparation by the Consultant. Revised Traffic study report received on 18.12.2012. Traffic Report finalized on 18.03.2013. Revised Draft Final report is under preparation by the Consultant. Inception Report submitted on 20.01.2013 RVNL/PP&D/Mode l/Agreement/2012 Dated 03.01.2013 PP&D/RVNL/ANGLSKND/Bank/tender/ 2013 Dated 08.02.2013 M/s HSA Advocates ( Hemant Sahai Associates) M/s. Feedback Infrastructure Services Pvt. Ltd. 37,50,000.00 Services to Develop various Participative Model Agreements of new Policy in Rail connectivity and capacity augmentation projects. PP&D/RVNL/ANGL- 29.01.2013 Bankability Study of Angul – SKND/Bank/2012 Sukinda Road New Line 40,00,000.00 27.12.2012 Consultancy 13,47,196.00 5. RVNL/PP&D/Model/A greement/2012 12,0,000.00 4. N.A. (16 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 07.01.2013) 01.04. 2013 Initial draft has been submitted on 01.02.2013 and presentation given/discussion held on 27.02.2013. Modified draft MCA sent to Railway Board on 18.03.2013 for approval. Kick – off meeting held on 05.03.2013. First Draft Report submitted on 20.03.2013. Detail of Contract awarded upto APRIL, 2013 Project Planning & Development Department M/s. Feedback Infrastructure Services Pvt. Ltd. 2. PP&D/RVNL/REWAS/ 13.08.2012 Bankability study 2012/Tender of Rewas Port PP&D/RVNL/REW AS/2012/Tender Dated: 03.09.2012 M/s GRANT THRONTON ADVISORY Pvt. Ltd. 3. PP&D/RVNL/Dighi Port/2008/Pt.VI 16.11.2012 Bankability Study PP&D/RVNL/Dighi Port/2008/Pt.VI Dated: 19.12.2012 M/s Feedback Infrastructure Services P.Ltd of Dighi Port NewLline Tendered cost (Rs.) Scheduled completion date 11,89,892.00 PP&D/RVNL/SIOB -GIMB/Bank/2012 Dated: 21.08.2012 Estimated cost of work (Rs.) (16 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 31.08.2012) 7,80,902.00 Contractor’s Name 24.12. 2012 (10 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 10.09.2012) 8,93,262.00 of Samkhyali – Gandhidham 3rd Line project in WR. Contract No. & date (LOA) 15,20,000.00 PP&D/RVNL/SIOBGIMB/Bank/2012 Date of Description of opening work/study (Tender) 24.07.2012 Bankability study 15,00,000.00 1. Tender No. 12,00,000.00 Sr. No. 19.11. 2012 (12 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 07.01.2013) 01.04. 2013 Physical Progress ( upto 30.04.13) Revised Draft report submitted on 05.04.2013 and same is under examination. Revised Traffic Report report submitted on 17.04.2013. Revised Draft Final report is under preparation by the Consultant. Draft report submitted on 17.04.2013 and same is under examination. PP&D/RVNL/ANGL- 29.01.2013 Bankability Study of Angul – SKND/Bank/2012 Sukinda Road New Line RVNL/PP&D/Mode l/Agreement/2012 Dated 03.01.2013 PP&D/RVNL/ANGLSKND/Bank/tender/ 2013 Dated 08.02.2013 M/s HSA Advocates ( Hemant Sahai Associates) M/s. Feedback Infrastructure Services Pvt. Ltd. 37,50,000.00 Services to Develop various Participative Model Agreements of new Policy in Rail connectivity and capacity augmentation projects. 40,00,000.00 27.12.2012 Consultancy 13,47,196.00 5. RVNL/PP&D/Model/A greement/2012 12,0,000.00 4. N.A. (16 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 07.01.2013) 01.04. 2013 Further modified draft MCA for NGR Model sent to Railway Board on 18.03.2013 for approval. The modified draft of NGR Model circulated for internal approval of RVNL ON 22.04.2013. First Draft Report submitted on 05.04.2013. Traffic Report is under preparation. Detail of Contract awarded upto MAY, 2013 Project Planning & Development Department M/s. Feedback Infrastructure Services Pvt. Ltd. 2. PP&D/RVNL/REWAS/ 13.08.2012 Bankability study 2012/Tender of Rewas Port PP&D/RVNL/REW AS/2012/Tender Dated: 03.09.2012 M/s GRANT THRONTON ADVISORY Pvt. Ltd. 3. PP&D/RVNL/Dighi Port/2008/Pt.VI 16.11.2012 Bankability Study PP&D/RVNL/Dighi Port/2008/Pt.VI Dated: 19.12.2012 M/s Feedback Infrastructure Services P.Ltd of Dighi Port NewLline Tendered cost (Rs.) Scheduled completion date 11,89,892.00 PP&D/RVNL/SIOB -GIMB/Bank/2012 Dated: 21.08.2012 Estimated cost of work (Rs.) (16 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 31.08.2012) 7,80,902.00 Contractor’s Name 24.12. 2012 (10 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 10.09.2012) 8,93,262.00 of Samkhyali – Gandhidham 3rd Line project in WR. Contract No. & date (LOA) 15,20,000.00 PP&D/RVNL/SIOBGIMB/Bank/2012 Date of Description of opening work/study (Tender) 24.07.2012 Bankability study 15,00,000.00 1. Tender No. 12,00,000.00 Sr. No. 19.11. 2012 (12 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 07.01.2013) 01.04. 2013 Physical Progress ( upto 31.05.13) Revised Draft report submitted on 05.04.2013 and same is under examination. Revised Draft Final report submitted on 17.05.2013, Revised report resubmitted on 30.05.2013 is under examination. Final report submitted on 21.05.2013. Same examined, comments sent for incorporation. Final report submitted on 28.05.2013 after incorporation of comments, same is under examination. RVNL/PP&D/Mode l/Agreement/2012 Dated 03.01.2013 PP&D/RVNL/ANGLSKND/Bank/tender/ 2013 Dated 08.02.2013 M/s HSA Advocates ( Hemant Sahai Associates) M/s. Feedback Infrastructure Services Pvt. Ltd. 37,50,000.00 Services to Develop various Participative Model Agreements of new Policy in Rail connectivity and capacity augmentation projects. PP&D/RVNL/ANGL- 29.01.2013 Bankability Study of Angul – SKND/Bank/2012 Sukinda Road New Line 40,00,000.00 27.12.2012 Consultancy 13,47,196.00 5. RVNL/PP&D/Model/A greement/2012 12,0,000.00 4. N.A. (16 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 07.01.2013) 01.04. 2013 Model for NGR and JV for Concession and O&M Agreement of Group “A” at Stage –I sent to Railway Board on 18.03.2013 and 09.05.2013 respectively for approval. First Draft Report submitted on 05.04.2013. Traffic Report is under preparation. DDetail of Contract awarded upto JUNE, 2013 Project Planning & Development Department 3. PP&D/RVNL/Dighi Port/2008/Pt.VI 16.11.2012 Bankability Study of Dighi Port NewLline M/s. Feedback Infrastructure Services Pvt. Ltd. PP&D/RVNL/REW AS/2012/Tender Dated: 03.09.2012 M/s GRANT THRONTON ADVISORY Pvt. Ltd. PP&D/RVNL/Dighi Port/2008/Pt.VI Dated: 19.12.2012 M/s Feedback Infrastructure Services P.Ltd Tendered cost (Rs.) 11,89,892.00 PP&D/RVNL/SIOB -GIMB/Bank/2012 Dated: 21.08.2012 Estimated cost of work (Rs.) 7,80,902.00 PP&D/RVNL/REWAS/ 13.08.2012 Bankability study 2012/Tender of Rewas Port Contractor’s Name 15,20,000.00 of Samkhyali – Gandhidham 3rd Line project in WR. Contract No. & date (LOA) Scheduled completion date (16 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 31.08.2012) 24.12. 2012 (10 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 10.09.2012) 19.11. 2012 8,93,262.00 2. PP&D/RVNL/SIOBGIMB/Bank/2012 Date of Description of opening work/study (Tender) 24.07.2012 Bankability study 15,00,000.00 1. Tender No. 12,00,000.00 Sr. No. (12 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 07.01.2013) 01.04. 2013 Physical Progress ( upto 30.06.13) Revised Draft report submitted on 05.04.2013 and same was examined. The consultant is to submitted Draft Final Report. Revised Draft Final report submitted on 17.05.2013, Revised report resubmitted on 30.05.2013 was examined. The consultant is to submitted Final Report. Revised Final Report-II submitted on 17.06.2013, same was examined. The consultant is to submitted Final Report. RVNL/PP&D/Mode l/Agreement/2012 Dated 03.01.2013 PP&D/RVNL/ANGLSKND/Bank/tender/ 2013 Dated 08.02.2013 M/s HSA Advocates ( Hemant Sahai Associates) M/s. Feedback Infrastructure Services Pvt. Ltd. 37,50,000.00 Services to Develop various Participative Model Agreements of new Policy in Rail connectivity and capacity augmentation projects. PP&D/RVNL/ANGL- 29.01.2013 Bankability Study of Angul – SKND/Bank/2012 Sukinda Road New Line 40,00,000.00 27.12.2012 Consultancy 13,47,196.00 5. RVNL/PP&D/Model/A greement/2012 12,0,000.00 4. N.A. (16 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 07.01.2013) 01.04. 2013 Preliminary draft of DFCMO Model & DBFMT Model sent to Railway Board on 31.05.2013 and preliminary draft UFA Model sent to Railway Board on 10.06.2013 for approval. Revised Draft Final Report submitted on 24.06.2013 was examined. The consultant is to submitted Draft Final Report. Detail of Contract awarded upto JULY, 2013 Project Planning & Development Department 3. PP&D/RVNL/Dighi Port/2008/Pt.VI 16.11.2012 Bankability Study of Dighi Port NewLline M/s. Feedback Infrastructure Services Pvt. Ltd. PP&D/RVNL/REW AS/2012/Tender Dated: 03.09.2012 M/s GRANT THRONTON ADVISORY Pvt. Ltd. PP&D/RVNL/Dighi Port/2008/Pt.VI Dated: 19.12.2012 M/s Feedback Infrastructure Services P.Ltd Tendered cost (Rs.) 11,89,892.00 PP&D/RVNL/SIOB -GIMB/Bank/2012 Dated: 21.08.2012 Estimated cost of work (Rs.) 7,80,902.00 PP&D/RVNL/REWAS/ 13.08.2012 Bankability study 2012/Tender of Rewas Port Contractor’s Name 15,20,000.00 of Samkhyali – Gandhidham 3rd Line project in WR. Contract No. & date (LOA) 8,93,262.00 2. PP&D/RVNL/SIOBGIMB/Bank/2012 Date of Description of opening work/study (Tender) 24.07.2012 Bankability study 15,00,000.00 1. Tender No. 12,00,000.00 Sr. No. Scheduled completion date (16 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 31.08.2012) 24.12. 2012 (10 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 10.09.2012) 19.11. 2012 (12 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 07.01.2013) 01.04. 2013 Physical Progress ( upto 31.07.13) Revised Draft report submitted on 05.04.2013 and same was examined. The consultant is to submitted Draft Final Report. Revised Draft Final report submitted on 17.05.2013, Revised report resubmitted on 30.05.2013 was examined. The consultant submitted Final Report which is under process. Revised Final Report-II submitted on 17.06.2013, same was examined. The consultant submitted Final Report which is under process. RVNL/PP&D/Mode l/Agreement/2012 Dated 03.01.2013 PP&D/RVNL/ANGLSKND/Bank/tender/ 2013 Dated 08.02.2013 M/s HSA Advocates ( Hemant Sahai Associates) M/s. Feedback Infrastructure Services Pvt. Ltd. 37,50,000.00 Services to Develop various Participative Model Agreements of new Policy in Rail connectivity and capacity augmentation projects. PP&D/RVNL/ANGL- 29.01.2013 Bankability Study of Angul – SKND/Bank/2012 Sukinda Road New Line 40,00,000.00 27.12.2012 Consultancy 13,47,196.00 5. RVNL/PP&D/Model/A greement/2012 12,0,000.00 4. N.A. (16 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 07.01.2013) 01.04. 2013 Preliminary draft of DFCMO Model & DBFMT Model sent to Railway Board on 31.05.2013 and preliminary draft UFA Model sent to Railway Board on 10.06.2013 for approval. Revised Draft Final Report submitted on 24.06.2013 was examined. The consultant submitted Draft Final Report, which is under examination. Detail of Contract awarded upto AUGUST, 2013 Project Planning & Development Department M/s. Feedback Infrastructure Services Pvt. Ltd. 2. PP&D/RVNL/REWAS/ 13.08.2012 Bankability study 2012/Tender of Rewas Port PP&D/RVNL/REW AS/2012/Tender Dated: 03.09.2012 M/s GRANT THRONTON ADVISORY Pvt. Ltd. 3. PP&D/RVNL/Dighi Port/2008/Pt.VI 16.11.2012 Bankability Study PP&D/RVNL/Dighi Port/2008/Pt.VI Dated: 19.12.2012 M/s Feedback Infrastructure Services P.Ltd of Dighi Port NewLline Tendered cost (Rs.) Scheduled completion date 11,89,892.00 PP&D/RVNL/SIOB -GIMB/Bank/2012 Dated: 21.08.2012 Estimated cost of work (Rs.) (16 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 31.08.2012) 7,80,902.00 Contractor’s Name 24.12. 2012 (10 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 10.09.2012) 8,93,262.00 of Samkhyali – Gandhidham 3rd Line project in WR. Contract No. & date (LOA) 15,20,000.00 PP&D/RVNL/SIOBGIMB/Bank/2012 Date of Description of opening work/study (Tender) 24.07.2012 Bankability study 15,00,000.00 1. Tender No. 12,00,000.00 Sr. No. 19.11. 2012 (12 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 07.01.2013) 01.04. 2013 Physical Progress ( upto 31.08.13) Revised Draft report submitted on 05.04.2013 and same was examined. The consultant is to submit Draft Final Report. Final report is being placed before RVNL BOD for approval. Final report is being placed before RVNL BOD for approval. RVNL/PP&D/Mode l/Agreement/2012 Dated 03.01.2013 PP&D/RVNL/ANGLSKND/Bank/tender/ 2013 Dated 08.02.2013 M/s HSA Advocates ( Hemant Sahai Associates) M/s. Feedback Infrastructure Services Pvt. Ltd. 37,50,000.00 Services to Develop various Participative Model Agreements of new Policy in Rail connectivity and capacity augmentation projects. PP&D/RVNL/ANGL- 29.01.2013 Bankability Study of Angul – SKND/Bank/2012 Sukinda Road New Line 40,00,000.00 27.12.2012 Consultancy 13,47,196.00 5. RVNL/PP&D/Model/A greement/2012 12,0,000.00 4. N.A. (16 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 07.01.2013) 01.04. 2013 Preliminary draft of DFCMO Model & DBFMT Model sent to Railway Board on 31.05.2013 and preliminary draft UFA Model sent to Railway Board on 10.06.2013 for approval. Presentation made by the Consultant on Revised Final report on 21.08.2013 in the BOD of ASRL. Detail of Contract awarded upto SEPTEMBER, 2013 Project Planning & Development Department M/s. Feedback Infrastructure Services Pvt. Ltd. PP&D/RVNL/REWAS/ 13.08.2012 Bankability study 2012/Tender of Rewas Port PP&D/RVNL/REW AS/2012/Tender Dated: 03.09.2012 M/s GRANT THRONTON ADVISORY Pvt. Ltd. 16.11.2012 Bankability Study PP&D/RVNL/Dighi Port/2008/Pt.VI Dated: 19.12.2012 M/s Feedback Infrastructure Services P.Ltd PP&D/RVNL/SIOBGIMB/Bank/2012 2. 3. PP&D/RVNL/Dighi Port/2008/Pt.VI of Samkhyali – Gandhidham 3rd Line project in WR. of Dighi Port NewLline Tendered cost (Rs.) Scheduled completion date Physical Progress ( upto 30.09.13) Revised Draft report submitted on 05.04.2013 and same was examined. The consultant is to submit Draft Final Report. 11,89,892.00 PP&D/RVNL/SIOB -GIMB/Bank/2012 Dated: 21.08.2012 1. Estimated cost of work (Rs.) (16 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 31.08.2012) 7,80,902.00 Contractor’s Name 24.12. 2012 (10 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 10.09.2012) After approval of BOD/RVNL on 18.09.2013, Final Report sent to Railway Board on 23.09.13 for acceptance. 8,93,262.00 Contract No. & date (LOA) 15,20,000.00 Date of Description of opening work/study (Tender) 24.07.2012 Bankability study 15,00,000.00 Tender No. 12,00,000.00 Sr. No. 19.11. 2012 (12 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 07.01.2013) After approval of BOD/RVNL on 18.09.2013, Final Report sent to Railway Board on 23.09.13 for acceptance 01.04. 2013 PP&D/RVNL/ANGLSKND/Bank/tender/ 2013 Dated 08.02.2013 PP&D/RVNL/Tender /NandgaonUmroli/2013 Dated 17.09.2013 M/s. Feedback Infrastructure Services Pvt. Ltd. M/s Deloitte Touche Tohmatsu India Pvt.Ltd. 37,50,000.00 Dated 03.01.2013 M/s HSA Advocates ( Hemant Sahai Associates) N.A. 13,47,196.00 PP&D/RVNL/Ten der/NandgaonUmroli/2013 06.08.2013 Bankability Study of Umroli Station to Nandgaon Port new line project in Western Railway. RVNL/PP&D/Mode l/Agreement/2012 40,00,000.00 Services to Develop various Participative Model Agreements of new Policy in Rail connectivity and capacity augmentation projects. PP&D/RVNL/ANGL- 29.01.2013 Bankability Study of Angul – SKND/Bank/2012 Sukinda Road New Line (16 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 07.01.2013) 12,92,140/- 6. 27.12.2012 Consultancy 12,0,000.00 5. RVNL/PP&D/Model/A greement/2012 12,68,544/- 4. 01.04. 2013 16 weeks from acceptance of CVs of key professionals. CVs not yet accepted. Preliminary draft of DFCMO Model & DBFMT Model sent to Railway Board on 31.05.2013 and preliminary draft UFA Model sent to Railway Board on 10.06.2013 for approval. Completed CVs of key professionals are under evaluation as on 30.09.2013 Detail of Contract awarded upto OCTOBER, 2013 Project Planning & Development Department PP&D/RVNL/REWAS/ 13.08.2012 Bankability 2012/Tender study of Rewas Port 3. PP&D/RVNL/Dighi Port/2008/Pt.VI 16.11.2012 Bankability Study of Dighi Port NewLline PP&D/RVNL/SIOBGIMB/Bank/2012 Dated: 21.08.2012 M/s. Feedback Infrastructure Services Pvt. Ltd. PP&D/RVNL/REWA S/2012/Tender Dated: 03.09.2012 M/s GRANT THRONTON ADVISORY Pvt. Ltd. PP&D/RVNL/Dighi Port/2008/Pt.VI Dated: 19.12.2012 M/s Feedback Infrastructur e Services P.Ltd Estimated cost of work (Rs.) Tendere d cost (Rs.) 11,89,892.00 study of Samkhyali – Gandhidham 3rd Line project in WR. Contractor’s Name Scheduled completion date (16 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 31.08.2012) 24.12. 2012 7,80,902.00 24.07.2012 Bankability Contract No. & date (LOA) 15,20,000.00 Description of work/study (10 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 10.09.2012) 8,93,262.00 2. PP&D/RVNL/SIOBGIMB/Bank/2012 Date of opening (Tender) 15,00,000.00 1. Tender No. 12,00,000.00 Sr. No. 19.11. 2012 (12 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 07.01.2013) 01.04. 2013 Physical Progress ( upto 31.10.13) Revised Draft report submitted on 05.04.2013 and same was examined. The consultant is to submit Draft Final Report. Completed Completed PP&D/RVNL/Ten der/NandgaonUmroli/2013 06.08.2013 Bankability Study of Umroli Station to Nandgaon Port new line project in Western Railway. RVNL/PP&D/Model/ Agreement/2012 Dated 03.01.2013 PP&D/RVNL/Tender/N andgaon-Umroli/2013 Dated 17.09.2013 M/s HSA Advocates ( Hemant Sahai Associates) M/s Deloitte Touche Tohmatsu India Pvt.Ltd. 37,50,000.00 Services to Develop various Participative Model Agreements of new Policy in Rail connectivity and capacity augmentation projects. 40,00,000.00 27.12.2012 Consultancy 12,92,140/- 5. RVNL/PP&D/Model/A greement/2012 12,68,544/- 4. N.A. 16 weeks from acceptance of CVs of key professionals. CVs not yet accepted. Preliminary draft of DFCMO Model & DBFMT Model sent to Railway Board on 31.05.2013 and preliminary draft UFA Model sent to Railway Board on 10.06.2013 for approval. Inception Report submitted on 17.10.2013. Detail of Contract awarded upto NOVEMBER, 2013 1. Tender No. Date of opening (Tender) Description of work/study PP&D/RVNL/SIOBGIMB/Bank/2012 24.07.2012 Bankability RVNL/PP&D/Model/A greement/2012 27.12.2012 Consultancy study of Samkhyali – Gandhidham 3rd Line project in WR. Contract No. & date (LOA) Contractor’s Name PP&D/RVNL/SIOBGIMB/Bank/2012 Dated: 21.08.2012 M/s. Feedback Infrastructure Services Pvt. Ltd. RVNL/PP&D/Model/ Agreement/2012 M/s HSA Advocates ( Hemant Sahai Associates) Estimated cost of work (Rs.) 15,20,000.00 Sr. No. Tendere d cost (Rs.) Scheduled completion date 11,89,892.00 Project Planning & Development Department (16 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 31.08.2012) Physical Progress ( upto 30.11.13) Revised Draft Final Report submitted on 11.11.2013 and same is under examination. 06.08.20 13 Bankability Study of Umroli Station to Nandgaon Port new line project in Western Railway. PP&D/RVNL/Tender/N andgaon-Umroli/2013 Dated 17.09.2013 M/s Deloitte Touche Tohmatsu India Pvt.Ltd. 37,50,000.00 12,92,140/- PP&D/RVNL/Ten der/NandgaonUmroli/2013 Dated 03.01.2013 12,68,544/- 3. Services to Develop various Participative Model Agreements of new Policy in Rail connectivity and capacity augmentation projects. 40,00,000.00 24.12. 2012 2. N.A. (16 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 08.10.2013) 26.01. 2014 Final NGR, JV , DBFOT, draft DBFMT and Annuity Model submitted to Railway Board. Inception Report submitted on 17.10.2013. Detail of Contract awarded upto DECEMBER, 2013 1. Tender No. Date of opening (Tender) Description of work/study PP&D/RVNL/SIOBGIMB/Bank/2012 24.07.2012 Bankability RVNL/PP&D/Model/A greement/2012 27.12.2012 Consultancy study of Samkhyali – Gandhidham 3rd Line project in WR. Contract No. & date (LOA) Contractor’s Name PP&D/RVNL/SIOBGIMB/Bank/2012 Dated: 21.08.2012 M/s. Feedback Infrastructure Services Pvt. Ltd. RVNL/PP&D/Model/ Agreement/2012 M/s HSA Advocates ( Hemant Sahai Associates) Estimated cost of work (Rs.) 15,20,000.00 Sr. No. Tendere d cost (Rs.) Scheduled completion date 11,89,892.00 Project Planning & Development Department (16 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 31.08.2012) Physical Progress ( upto 31.12.13) Completed 06.08.2013 Bankability Study of Umroli Station to Nandgaon Port new line project in Western Railway. PP&D/RVNL/Tender/N andgaon-Umroli/2013 Dated 17.09.2013 M/s Deloitte Touche Tohmatsu India Pvt.Ltd. 37,50,000.00 12,92,140/- PP&D/RVNL/Ten der/NandgaonUmroli/2013 Dated 03.01.2013 12,68,544/- 3. Services to Develop various Participative Model Agreements of new Policy in Rail connectivity and capacity augmentation projects. 40,00,000.00 24.12. 2012 2. N.A. (16 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 08.10.2013) 26.01. 2014 Final draft for NGR, JV, DBFOT and initial draft for DBFMT and Annuity Model submitted to Railway Board. Draft Interim Report submitted on 09.12.2013. Detail of Contract awarded upto JANUARY, 2014 2. 3. PP&D/RVNL/Ten der/NandgaonUmroli/2013 Services to Develop various Participative Model Agreements of new Policy in Rail connectivity and capacity augmentation projects. 06.08.2013 Bankability Study of Umroli Station to Nandgaon Port new line project in Western Railway. Contractor’s Name RVNL/PP&D/Model/ Agreement/2012 M/s HSA Advocates ( Hemant Sahai Associates) Dated 03.01.2013 PP&D/RVNL/Tender/N andgaon-Umroli/2013 M/s Deloitte Touche Tohmatsu India Pvt.Ltd. Dated 17.09.2013 PP&D/RVNL/Bina - 06.11.2013 Bankability PP&D/RVNL/Bina - M/s Balaji Study of Bina – Kota/Tender/2013. Kota/Tender/2013 Railroad Kota doubling in West Central railway. Dated: 28.01.2014 Systems Ltd. ( BARSYL) Estimated cost of work (Rs.) Tendere d cost (Rs.) Scheduled completion date 37,50,000.00 27.12.2012 Consultancy Contract No. & date (LOA) N.A. 12,92,140/- RVNL/PP&D/Model/A greement/2012 Description of work/study 13,89,000/- 1. Date of opening (Tender) 12,68,544/- Tender No. 14,19,412/- Sr. No. 40,00,000.00 Project Planning & Development Department (16 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 08.10.2013) 26.01. 2014 (10 weeks from the date of LOA on 28.01.2014) 09.03. 2014 Physical Progress ( upto 31.01.14) Final draft for NGR, JV, DBFOT and initial draft for DBFMT and Annuity Model submitted to Railway Board. Draft Interim Report submitted on 09.12.2013. Final Estimate awaited from CPM/Mumbai . PP&D/RVNL /Rewari – Manheru /RFP/2013 Dated: 28.01.2014 PP&D/RVNL / Rewar – Manheru / RFP/2013 Dated: 31.01.2014 M/s Balaji Railroad Systems Ltd. ( BARSYL) M/s Balaji Railroad Systems Ltd. ( BARSYL) 13,89,000/- PP&D/RVNL/HBJ ET/Tender/2013. 14,19,412/- 08.11.2013 Bankability Study of Habibganj – rd Itarsi 3 line (Excluding Budni to Barkhera section) in West Central Railway. 08.11.2013 Bankability Study of Rewari to Manheru doubling in North Western Railway. 13,89,000/- 5. PP&D/RVNL/HBJ ET/Tender/2013. 14,19,412/- 4. (10 weeks from the date of LOA on 28.01.2014) 09.03. 2014 (10 weeks from the date of LOA on 28.01.2014) 09.03. 2014 Detail of Contract awarded upto FEBRUARY, 2014 2. 3. PP&D/RVNL/Ten der/NandgaonUmroli/2013 Services to Develop various Participative Model Agreements of new Policy in Rail connectivity and capacity augmentation projects. 06.08.2013 Bankability Study of Umroli Station to Nandgaon Port new line project in Western Railway. Contractor’s Name RVNL/PP&D/Model/ Agreement/2012 M/s HSA Advocates ( Hemant Sahai Associates) Dated 03.01.2013 PP&D/RVNL/Tender/N andgaon-Umroli/2013 M/s Deloitte Touche Tohmatsu India Pvt.Ltd. Dated 17.09.2013 PP&D/RVNL/Bina - 06.11.2013 Bankability PP&D/RVNL/Bina - M/s Balaji Study of Bina – Kota/Tender/2013. Kota/Tender/2013 Railroad Kota doubling in West Central railway. Dated: 28.01.2014 Systems Ltd. ( BARSYL) Estimated cost of work (Rs.) Tendere d cost (Rs.) Scheduled completion date 37,50,000.00 27.12.2012 Consultancy Contract No. & date (LOA) N.A. 12,92,140/- RVNL/PP&D/Model/A greement/2012 Description of work/study 13,89,000/- 1. Date of opening (Tender) 12,68,544/- Tender No. 14,19,412/- Sr. No. 40,00,000.00 Project Planning & Development Department (16 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 08.10.2013) 26.01. 2014 (10 weeks from the date of LOA on 28.01.2014) 09.04. 2014 Physical Progress ( upto 28.02.14) Final draft for NGR, JV, DBFOT and initial draft for DBFMT and Annuity Model submitted to Railway Board. Draft Interim Report submitted on 09.12.2013. Final Estimate awaited from CPM/Mumbai . Inception Report submitted on 20.02.2014. 8. Dated: 06.02.2014 Dated: 06.02.2014 PP&D/RVNL /TMZ - 07.11.2013 Bankability PP&D/RVNL /TMZ Study of Tamluk BYSA /RFP/2013 - BYSA /RFP/2013 to Basulaya Sutahata doubling in South Eastern Railway. M/s Balaji Railroad Systems Ltd. ( BARSYL) Dated: 06.02.2014 Systems Ltd. ( BARSYL) M/s Diloitte Touche Tohmatsu Pvt. Ltd. 13,89,000/13,89,000/14,80,000/- PP&D/RVNL /GOI - M/s Balaji Railroad MOU /RFP/2013 Dated: 31.01.2014 14,19,412/- 06.11.2013 Bankability Study of Goilkera to rd Manoharpur 3 in South Eastern Railway. M/s Balaji Railroad Systems Ltd. ( BARSYL) 14,19,412/- PP&D/RVNL /RANI - kESHAVGANJ / RFP/2013 PP&D/RVNL / Rewar – Manheru / RFP/2013 15,20,000/- PP&D/RVNL /GOI MOU /RFP/2013 07.11.2013 Bankability Study of Rani to keshavganj doubling in North Western Railway. Dated: 28.01.2014 M/s Balaji Railroad Systems Ltd. ( BARSYL) 14,95,792/- 7. PP&D/RVNL /RANI - kESHAVGANJ / RFP/2013 PP&D/RVNL/HBJ ET/Tender/2013. 14,19,412/ 6. PP&D/RVNL /Rewari – Manheru /RFP/2013 08.11.2013 Bankability Study of Habibganj – rd Itarsi 3 line (Excluding Budni to Barkhera section) in West Central Railway. 08.11.2013 Bankability Study of Rewari to Manheru doubling in North Western Railway. 14,19,412/ 5. PP&D/RVNL/HBJ ET/Tender/2013. 14,19,412/ 4. (10 weeks from the date of LOA on 28.01.2014) Inception Report submitted on 20.02.2014. 09.04. 2014 (10 weeks from the date of LOA on 31.01.2014) Inception Report submitted on 20.02.2014. 12.04. 2014 (10 weeks from the date of LOA on 06.02.2014) Inception Report submitted on 20.02.2014. 17.04. 2014 (10 weeks from the date of LOA on 06.02.2014) Inception Report submitted on 10.03.2014. 17.04. 2014 (10 weeks from the date of LOA on 06.02.2014) 17.04. 2014 Inception Report submitted on 19.02.2014. PP&D/RVNL /Tiruvallur Arakkonam / RFP/2013 11.11.2013 Bankability Study of Tiruvallur to th Arakkonam 4 line in Southern Railway. PP&D/RVNL /Tiruvallur Arakkonam / RFP/2013 M/s Balaji Railroad Systems Ltd. ( BARSYL) Dated: 07.02.2014 Dated: 07.02.2014 M/s Balaji Railroad Systems Ltd. ( BARSYL) 12,45,000/- PP&D/RVNL /Guntur - Tenali /RFP/2013 14,19,412/ 11.11.2013 Bankability Study of Guntur to Tenali doubling with RE in South Central Railway. 12,45,000/- 10. PP&D/RVNL /Guntur - Tenali /RFP/2013 14,19,412/ 9. (10 weeks from the date of LOA on 07.02.2014) Inception Report submitted on 20.02.2014. 18.04. 2014 (10 weeks from the date of LOA on 07.02.2014) 18.04. 2014 Inception Report submitted on 20.02.2014. Detail of Contract awarded upto March, 2014 2. 3. PP&D/RVNL/Ten der/NandgaonUmroli/2013 Services to Develop various Participative Model Agreements of new Policy in Rail connectivity and capacity augmentation projects. 06.08.2013 Bankability Study of Umroli Station to Nandgaon Port new line project in Western Railway. Contractor’s Name RVNL/PP&D/Model/ Agreement/2012 M/s HSA Advocates ( Hemant Sahai Associates) Dated 03.01.2013 PP&D/RVNL/Tender/N andgaon-Umroli/2013 M/s Deloitte Touche Tohmatsu India Pvt.Ltd. Dated 17.09.2013 PP&D/RVNL/Bina - 06.11.2013 Bankability PP&D/RVNL/Bina - M/s Balaji Study of Bina – Kota/Tender/2013. Kota/Tender/2013 Railroad Kota doubling in West Central railway. Dated: 28.01.2014 Systems Ltd. ( BARSYL) Estimated cost of work (Rs.) Tendere d cost (Rs.) Scheduled completion date 37,50,000.00 27.12.2012 Consultancy Contract No. & date (LOA) N.A. 12,92,140/- RVNL/PP&D/Model/A greement/2012 Description of work/study 13,89,000/- 1. Date of opening (Tender) 12,68,544/- Tender No. 14,19,412/- Sr. No. 40,00,000.00 Project Planning & Development Department (16 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 08.10.2013) 26.01. 2014 (10 weeks from the date of LOA on 28.01.2014) 09.04. 2014 Physical Progress ( upto 31.03.14) Final draft for NGR, JV, DBFOT and initial draft for DBFMT and Annuity Model submitted to Railway Board. Draft Interim Report submitted on 09.12.2013. Final Estimate awaited from CPM/Mumbai . Inception Report submitted on 20.02.2014. 8. Dated: 06.02.2014 Dated: 06.02.2014 PP&D/RVNL /TMZ - 07.11.2013 Bankability PP&D/RVNL /TMZ Study of Tamluk BYSA /RFP/2013 - BYSA /RFP/2013 to Basulaya Sutahata doubling in South Eastern Railway. M/s Balaji Railroad Systems Ltd. ( BARSYL) Dated: 06.02.2014 Systems Ltd. ( BARSYL) M/s Diloitte Touche Tohmatsu Pvt. Ltd. 13,89,000/13,89,000/14,80,000/- PP&D/RVNL /GOI - M/s Balaji Railroad MOU /RFP/2013 Dated: 31.01.2014 14,19,412/- 06.11.2013 Bankability Study of Goilkera to rd Manoharpur 3 in South Eastern Railway. M/s Balaji Railroad Systems Ltd. ( BARSYL) 14,19,412/- PP&D/RVNL /RANI - kESHAVGANJ / RFP/2013 PP&D/RVNL / Rewar – Manheru / RFP/2013 15,20,000/- PP&D/RVNL /GOI MOU /RFP/2013 07.11.2013 Bankability Study of Rani to keshavganj doubling in North Western Railway. Dated: 28.01.2014 M/s Balaji Railroad Systems Ltd. ( BARSYL) 14,95,792/- 7. PP&D/RVNL /RANI - kESHAVGANJ / RFP/2013 PP&D/RVNL/HBJ ET/Tender/2013. 14,19,412/ 6. PP&D/RVNL /Rewari – Manheru /RFP/2013 08.11.2013 Bankability Study of Habibganj – rd Itarsi 3 line (Excluding Budni to Barkhera section) in West Central Railway. 08.11.2013 Bankability Study of Rewari to Manheru doubling in North Western Railway. 14,19,412/ 5. PP&D/RVNL/HBJ ET/Tender/2013. 14,19,412/ 4. (10 weeks from the date of LOA on 28.01.2014) Inception Report submitted on 20.02.2014. 09.04. 2014 (10 weeks from the date of LOA on 31.01.2014) Inception Report submitted on 20.02.2014. 12.04. 2014 (10 weeks from the date of LOA on 06.02.2014) Inception Report submitted on 20.02.2014. 17.04. 2014 (10 weeks from the date of LOA on 06.02.2014) Inception Report submitted on 10.03.2014. 17.04. 2014 (10 weeks from the date of LOA on 06.02.2014) 17.04. 2014 Draft Final Report submitted on 19.03.2014. PP&D/RVNL /Tiruvallur Arakkonam / RFP/2013 11.11.2013 Bankability Study of Tiruvallur to th Arakkonam 4 line in Southern Railway. PP&D/RVNL /Tiruvallur Arakkonam / RFP/2013 M/s Balaji Railroad Systems Ltd. ( BARSYL) Dated: 07.02.2014 Dated: 07.02.2014 M/s Balaji Railroad Systems Ltd. ( BARSYL) 12,45,000/- PP&D/RVNL /Guntur - Tenali /RFP/2013 14,19,412/ 11.11.2013 Bankability Study of Guntur to Tenali doubling with RE in South Central Railway. 12,45,000/- 10. PP&D/RVNL /Guntur - Tenali /RFP/2013 14,19,412/ 9. (10 weeks from the date of LOA on 07.02.2014) Inception Report submitted on 20.02.2014. 18.04. 2014 (10 weeks from the date of LOA on 07.02.2014) 18.04. 2014 Inception Report submitted on 20.02.2014. Detail of Contract awarded upto April, 2014 Project Planning & Development Department 3. PP&D/RVNL/Ten der/NandgaonUmroli/2013 06.08.2013 Bankability Study of Umroli Station to Nandgaon Port new line project in Western Railway. RVNL/PP&D/Model/ Agreement/2012 M/s HSA Advocates ( Hemant Sahai Associates) Dated 03.01.2013 PP&D/RVNL/Tender/N andgaon-Umroli/2013 M/s Deloitte Touche Tohmatsu India Pvt.Ltd. Dated 17.09.2013 PP&D/RVNL/Bina - 06.11.2013 Bankability PP&D/RVNL/Bina - M/s Balaji Study of Bina – Kota/Tender/2013. Kota/Tender/2013 Railroad Kota doubling in West Central railway. Dated: 28.01.2014 Systems Ltd. ( BARSYL) Estimated cost of work (Rs.) Tendere d cost (Rs.) 37,50,000.00 Services to Develop various Participative Model Agreements of new Policy in Rail connectivity and capacity augmentation projects. Contractor’s Name 12,92,140/- 2. 27.12.2012 Consultancy Contract No. & date (LOA) 13,89,000/- RVNL/PP&D/Model/A greement/2012 Description of work/study 40,00,000.00 1. Date of opening (Tender) 12,68,544/- Tender No. 14,19,412/- Sr. No. Scheduled completion date N.A. (16 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 08.10.2013) 26.01. 2014 (10 weeks from the date of LOA on 28.01.2014) 09.04. 2014 Physical Progress ( upto 30.04.14) Final Report for NGR, JV, DBFOT submitted to Railway Board on 23.10.2013 and Final report for DBFMT and Annuity Model submitted to Railway Board on 28.05.2013 by HSA. Draft Report submitted on 11.04.2014. Report under examination. Inception Report submitted on 20.02.2014. 8. Dated: 06.02.2014 Dated: 06.02.2014 PP&D/RVNL /TMZ - 07.11.2013 Bankability PP&D/RVNL /TMZ Study of Tamluk BYSA /RFP/2013 - BYSA /RFP/2013 to Basulaya Sutahata doubling in South Eastern Railway. M/s Balaji Railroad Systems Ltd. ( BARSYL) Dated: 06.02.2014 Systems Ltd. ( BARSYL) M/s Diloitte Touche Tohmatsu Pvt. Ltd. 13,89,000/13,89,000/14,80,000/- PP&D/RVNL /GOI - M/s Balaji Railroad MOU /RFP/2013 Dated: 31.01.2014 14,19,412/- 06.11.2013 Bankability Study of Goilkera to rd Manoharpur 3 in South Eastern Railway. M/s Balaji Railroad Systems Ltd. ( BARSYL) 14,19,412/- PP&D/RVNL /RANI - kESHAVGANJ / RFP/2013 PP&D/RVNL / Rewar – Manheru / RFP/2013 15,20,000/- PP&D/RVNL /GOI MOU /RFP/2013 07.11.2013 Bankability Study of Rani to keshavganj doubling in North Western Railway. Dated: 28.01.2014 M/s Balaji Railroad Systems Ltd. ( BARSYL) 14,95,792/- 7. PP&D/RVNL /RANI - kESHAVGANJ / RFP/2013 PP&D/RVNL/HBJ ET/Tender/2013. 14,19,412/- 6. PP&D/RVNL /Rewari – Manheru /RFP/2013 08.11.2013 Bankability Study of Habibganj – rd Itarsi 3 line (Excluding Budni to Barkhera section) in West Central Railway. 08.11.2013 Bankability Study of Rewari to Manheru doubling in North Western Railway. 14,19,412/- 5. PP&D/RVNL/HBJ ET/Tender/2013. 14,19,412/- 4. (10 weeks from the date of LOA on 28.01.2014) Inception Report submitted on 20.02.2014. 09.04. 2014 (10 weeks from the date of LOA on 31.01.2014) Inception Report submitted on 20.02.2014. 12.04. 2014 (10 weeks from the date of LOA on 06.02.2014) Inception Report submitted on 20.02.2014. 17.04. 2014 (10 weeks from the date of LOA on 06.02.2014) Inception Report submitted on 10.03.2014. 17.04. 2014 (10 weeks from the date of LOA on 06.02.2014) 17.04. 2014 Final Report submitted on 19.04.2014. Report under examination. PP&D/RVNL /Tiruvallur Arakkonam / RFP/2013 11.11.2013 Bankability Study of Tiruvallur to th Arakkonam 4 line in Southern Railway. PP&D/RVNL /Tiruvallur Arakkonam / RFP/2013 M/s Balaji Railroad Systems Ltd. ( BARSYL) Dated: 07.02.2014 Dated: 07.02.2014 M/s Balaji Railroad Systems Ltd. ( BARSYL) 12,45,000/- PP&D/RVNL /Guntur - Tenali /RFP/2013 14,19,412/- 11.11.2013 Bankability Study of Guntur to Tenali doubling with RE in South Central Railway. 12,45,000/- 10. PP&D/RVNL /Guntur - Tenali /RFP/2013 14,19,412/- 9. (10 weeks from the date of LOA on 07.02.2014) Inception Report submitted on 20.02.2014. 18.04. 2014 (10 weeks from the date of LOA on 07.02.2014) 18.04. 2014 Inception Report submitted on 20.02.2014. Detail of Contract awarded upto May, 2014 Project Planning & Development Department 3. PP&D/RVNL/Ten der/NandgaonUmroli/2013 06.08.2013 Bankability Study of Umroli Station to Nandgaon Port new line project in Western Railway. RVNL/PP&D/Model/ Agreement/2012 M/s HSA Advocates ( Hemant Sahai Associates) Dated 03.01.2013 PP&D/RVNL/Tender/N andgaon-Umroli/2013 M/s Deloitte Touche Tohmatsu India Pvt.Ltd. Dated 17.09.2013 PP&D/RVNL/Bina - 06.11.2013 Bankability PP&D/RVNL/Bina - M/s Balaji Study of Bina – Kota/Tender/2013. Kota/Tender/2013 Railroad Kota doubling in West Central railway. Dated: 28.01.2014 Systems Ltd. ( BARSYL) Estimated cost of work (Rs.) Tendere d cost (Rs.) 37,50,000.00 Services to Develop various Participative Model Agreements of new Policy in Rail connectivity and capacity augmentation projects. Contractor’s Name 12,92,140/- 2. 27.12.2012 Consultancy Contract No. & date (LOA) 13,89,000/- RVNL/PP&D/Model/A greement/2012 Description of work/study 40,00,000.00 1. Date of opening (Tender) 12,68,544/- Tender No. 14,19,412/- Sr. No. Scheduled completion date N.A. (16 weeks from the date after acceptance of CVs of key professionals. CVs accepted on 08.10.2013) 26.01. 2014 (10 weeks from the date of LOA on 28.01.2014) 09.04. 2014 Physical Progress ( upto 31.05.14) Final Report for NGR, JV, DBFOT submitted to Railway Board on 23.10.2013 and Final report for DBFMT and Annuity Model submitted to Railway Board on 28.05.2013 by HSA. Draft Report submitted on 11.04.2014. Cost of the project is yet to be finalized. Inception Report submitted on 20.02.2014. 8. Dated: 06.02.2014 Dated: 06.02.2014 PP&D/RVNL /TMZ - 07.11.2013 Bankability PP&D/RVNL /TMZ Study of Tamluk BYSA /RFP/2013 - BYSA /RFP/2013 to Basulaya Sutahata doubling in South Eastern Railway. M/s Balaji Railroad Systems Ltd. ( BARSYL) Dated: 06.02.2014 Systems Ltd. ( BARSYL) M/s Diloitte Touche Tohmatsu Pvt. Ltd. 13,89,000/13,89,000/14,80,000/- PP&D/RVNL /GOI - M/s Balaji Railroad MOU /RFP/2013 Dated: 31.01.2014 14,19,412/- 06.11.2013 Bankability Study of Goilkera to rd Manoharpur 3 in South Eastern Railway. M/s Balaji Railroad Systems Ltd. ( BARSYL) 14,19,412/- PP&D/RVNL /RANI - kESHAVGANJ / RFP/2013 PP&D/RVNL / Rewar – Manheru / RFP/2013 15,20,000/- PP&D/RVNL /GOI MOU /RFP/2013 07.11.2013 Bankability Study of Rani to keshavganj doubling in North Western Railway. Dated: 28.01.2014 M/s Balaji Railroad Systems Ltd. ( BARSYL) 14,95,792/- 7. PP&D/RVNL /RANI - kESHAVGANJ / RFP/2013 PP&D/RVNL/HBJ ET/Tender/2013. 14,19,412/- 6. PP&D/RVNL /Rewari – Manheru /RFP/2013 08.11.2013 Bankability Study of Habibganj – rd Itarsi 3 line (Excluding Budni to Barkhera section) in West Central Railway. 08.11.2013 Bankability Study of Rewari to Manheru doubling in North Western Railway. 14,19,412/- 5. PP&D/RVNL/HBJ ET/Tender/2013. 14,19,412/- 4. (10 weeks from the date of LOA on 28.01.2014) Inception Report submitted on 20.02.2014. 09.04. 2014 (10 weeks from the date of LOA on 31.01.2014) Draft Final Report submitted on 19.05.2014. 12.04. 2014 (10 weeks from the date of LOA on 06.02.2014) Inception Report submitted on 20.02.2014. 17.04. 2014 (10 weeks from the date of LOA on 06.02.2014) Inception Report submitted on 10.03.2014. 17.04. 2014 (10 weeks from the date of LOA on 06.02.2014) 17.04. 2014 Final Report submitted on 19.04.2014. Report under examination. PP&D/RVNL /Tiruvallur Arakkonam / RFP/2013 11.11.2013 Bankability Study of Tiruvallur to th Arakkonam 4 line in Southern Railway. PP&D/RVNL /Tiruvallur Arakkonam / RFP/2013 M/s Balaji Railroad Systems Ltd. ( BARSYL) Dated: 07.02.2014 Dated: 07.02.2014 M/s Balaji Railroad Systems Ltd. ( BARSYL) 12,45,000/- PP&D/RVNL /Guntur - Tenali /RFP/2013 14,19,412/- 11.11.2013 Bankability Study of Guntur to Tenali doubling with RE in South Central Railway. 12,45,000/- 10. PP&D/RVNL /Guntur - Tenali /RFP/2013 14,19,412/- 9. (10 weeks from the date of LOA on 07.02.2014) Inception Report submitted on 20.02.2014. 18.04. 2014 (10 weeks from the date of LOA on 07.02.2014) 18.04. 2014 Inception Report submitted on 20.02.2014.
© Copyright 2024 ExpyDoc