Detail of Contract awarded upto January, 2012 Project

Detail of Contract awarded upto January, 2012
Project Planning & Development Department
4.
PP&D/RVNL/ KURBOLANGIR/2010
21.08.10
21.09.10
M/S Feedback
Ventures Pvt. Ltd.
Bankability study of
electrification of
Nallapadu-Guntakal
section
RVNL/PP&D/Babk
ability/NallapaduGuntakal/RE/10
11/06/2010
Project Consultancy
services for
development of PPP
model in Railway
projects.
PP&D/RFP/BOT/
CONSULT/2009/P
t. II dated:
25.03.2010
Bankability study
for Khurda RoadBolangir New Line
project.
PP&D/RVNL/
KURBOLANGIR/2010
04/10/2010
M/s
Pricewaterhouse
Coopers Pvt. Ltd
13,18,085/-
RVNL/PP&D/Bank
ability/BuramaraChakulia/10
30/04/2010
Tendered
cost (Rs.)
9,91,514/-
Bankability study of
Buramara-Chakulia
New Line with
upgradation of
Rupsa-Buramara BG
Line on SER.
Estimated
cost of
work (Rs.)
15,00,000/-
Contractor’s
Name
M/s. RITES Ltd.
M/S Deloitte
Touche
Tohmatsu India
Pvt. Ltd.
15,00,000/-
PP&D/RFP/BOT/CO
NSULT/2009/Pt. II
09/04/10
Contract No. &
date (LOA)
9,65,125/-
3.
RVNL/PP&D/Bankabil
ity/Nallapadu Guntakal/RE/10
Description of
work/study
15,00,000/-
2
RVNL/PP&D/Bankabil
ity/Buramara Chakulia/10
Date of
opening
(Tender)
25/03/10
30,93,293/-
1
Tender No.
15,00,000/-
Sr.
No.
Scheduled
completion date
3 months from the
date of
submission of
Bank Guarantee
(14/05/2010)
Physical
Progress
( upto 31.01.12)
Final Report
sent to Railway
Board on
16.08.11 for
acceptance.
15/08/2010
(extended)
3 months from the
date of
submission of
Bank Guarantee
(25/06/2010)
Final Report
sent to Railway
Board on
04.08.11 for
acceptance.
25/09/2010
(extended)
26 weeks from
the date of
acceptance of
LOA(25/03/2010)
25/09/2010
(extended)
10 weeks from
the date of
acceptance of
CV(15/10/2010)
25/01/2011)
Final Report
sent to Railway
Board on
21.09.11 for
acceptance.
Final Report
sent to Railway
Board on
02.02.11 for
acceptance.
9.
PP&D/RVNL/MCLANLDA/Bank/2010
PP&D/RVNL/ADI UDZ/Bank/2010
N.A.
Study
done in
house.
N.A.
Study
done in
house.
PP&D/FT/HUK/20
10 dated
08.02.2011
Bankability study
for MacherlaNalgonda New Line
project in South
Central Railway.
PP&D/RVNL /
MCLA – NLDA /
BANKA / 2010
dated
21.02.11
Bankability study
for Ahmedabad Udaipur Gauge
Conversion project
in Western Railway.
N.A.
Traffic Study to
Sh.Sanjeeva
SHivesh ( ex
IRAS), CEO, Smart
Wave Consulting
Pvt. Ltd., 410/CA,
Shushant Lok, Cblock, Sec.-43,
Gurgaon.
N.A.
Study done in
house.
12,89,340/-
14,50,100/1,95,000/-
Feasibility Study for
Development of
Freight Terminal at
Holambi Kalan on
Northern Railway.
Traffic Study to
Shri H.S.Duggal,
Rtd.COM, Indian
Railways,C/2/21,
Goyal Inter City,
Block-C, Drive in
Road, Thaltej,
Ahemedabad-54
M/S Deloitte
Touche
Tohmatsu India
Pvt. Ltd.
8,76,885/-
21.01.11
PP&D/RVNL/DHD
-INDB/Bank/2010
dated 24.12.2010
1,75,000/-
PP&D/FT/HUK/2010
Study
done in
house.
Bankability study
for Dahod-Indore
New Line project in
Western Railway.
M/s
Pricewaterhouse
Coopers Pvt. Ltd.
-------
N.A.
PP&D/RVNL/ HXSBC/2010
24/09/2010
8 weeks from the
date of
acceptance of
CV(06/10/2010)
2/12/2010
Final Report
sent to Railway
Board on
30.12.11 for
acceptance.
6 weeks from LAO
(24.12.10) for
Traffic Study
which is out
sourced.
Final report is
under
examination by
RVNL Finance.
16 weeks from
the date of
acceptance of
CV(18/02/2011)
Draft Final
report is under
examination.
10/06/2011)
4 weeks from LOA
(21.02.11) for
Traffic Study
which is out
sourced.
Revised Final
report is under
examination by
RVNL Finance.
20.03.2011
N.A.
------
8.
PP&D/RVNL/DHDINDB/Bank/2010
Bankability study
for CuddapahBangalore New Line
project.
5,00,000/-
7.
23.08.10
------
6.
PP&D/RVNL/ HXSBC/2010
------
5.
Study done in
house and
Completed,
Report sent to
Rly. Board on
31.12.2010.
13.
No.
RVNL/PP&D/RFP/PN
U-SIOB/2011
04/01/11
16.01.12
Bankability study of
Rayadurg-Tumkur
New line in South
Western Railway
No. PP&D/RVNL/
RDG-TK
/BANK/2010
Dated: 19/04/2011
M/s Deloitte
Touche Tohmatsu
India Pvt. Ltd.
No.
RVNL/PP&D/RFP/
PNU-SIOB/2011
Dated: 23.01.2012
M/s. Feedback
Infrastructure
Services Pvt.Ltd.
12,28,179.47
M/s
ARKITECHNO
Consultants (India)
Pvt. Ltd
9,71,168.00
No.
PP&D/RVNL/DWR
BGM/BANK/Tende
r/2010
Dated: 04/04/2011
15,00,000.00
Bankability study of
Dharwad –
Belgaum New line
in South Western
Railway
Bankability study of
Palanpur-Samkhyali
doubling project in
WR.
M/s Deloitte
Touche
Tohmatsu India
Pvt. Ltd.
14,89,000.00
No.
PP&D/RVNL/BJPSDB/BANK/2010
Dated: 08/03/2011
12,28,179.47
No. PP&D/RVNL/
RDG-TK / BANK/2010
27/12/10
Bankability study of
Bijapur Shahabad New line
in South Western
Railway
7,49,000.00
12.
No.
PP&D/RVNL/DWR BGM/BANK/ 2010
20/12/10
14,89,000.00
11.
No. PP&D/RVNL/BJP
-SDB/BANK/2010
7,00,000.00
10.
(3 months from
LOA dated
08.03.2011)
06/06/2011
(3 months from
LOA dated
04.04.2011)
03/07/2011
(3 months from
LOA dated
19.04.2011)
18.07.2011
(6 weeks from the
date after
acceptance of
CVs of key
professionals.
CVs accepted on
30.01.2012)
09.03. 2012
Final Report
sent to Railway
Board on
30.12.11 for
acceptance.
Final Report
sent to Railway
Board on
30.12.11 for
acceptance.
Final Report
sent to Railway
Board on
30.12.11 for
acceptance.
Detail of Contract awarded upto February, 2012
Project Planning & Development Department
4.
PP&D/RVNL/ KURBOLANGIR/2010
21.08.10
21.09.10
M/S Feedback
Ventures Pvt. Ltd.
Bankability study of
electrification of
Nallapadu-Guntakal
section
RVNL/PP&D/Babk
ability/NallapaduGuntakal/RE/10
11/06/2010
Project Consultancy
services for
development of PPP
model in Railway
projects.
PP&D/RFP/BOT/
CONSULT/2009/P
t. II dated:
25.03.2010
Bankability study
for Khurda RoadBolangir New Line
project.
PP&D/RVNL/
KURBOLANGIR/2010
04/10/2010
M/s
Pricewaterhouse
Coopers Pvt. Ltd
13,18,085/-
RVNL/PP&D/Bank
ability/BuramaraChakulia/10
30/04/2010
Tendered
cost (Rs.)
9,91,514/-
Bankability study of
Buramara-Chakulia
New Line with
upgradation of
Rupsa-Buramara BG
Line on SER.
Estimated
cost of
work (Rs.)
15,00,000/-
Contractor’s
Name
M/s. RITES Ltd.
M/S Deloitte
Touche
Tohmatsu India
Pvt. Ltd.
15,00,000/-
PP&D/RFP/BOT/CO
NSULT/2009/Pt. II
09/04/10
Contract No. &
date (LOA)
9,65,125/-
3.
RVNL/PP&D/Bankabil
ity/Nallapadu Guntakal/RE/10
Description of
work/study
15,00,000/-
2
RVNL/PP&D/Bankabil
ity/Buramara Chakulia/10
Date of
opening
(Tender)
25/03/10
30,93,293/-
1
Tender No.
15,00,000/-
Sr.
No.
Scheduled
completion date
3 months from the
date of
submission of
Bank Guarantee
(14/05/2010)
Physical
Progress
( upto 29.02.12)
Final Report
sent to Railway
Board on
16.08.11 for
acceptance.
15/08/2010
(extended)
3 months from the
date of
submission of
Bank Guarantee
(25/06/2010)
Final Report
sent to Railway
Board on
04.08.11 for
acceptance.
25/09/2010
(extended)
26 weeks from
the date of
acceptance of
LOA(25/03/2010)
25/09/2010
(extended)
10 weeks from
the date of
acceptance of
CV(15/10/2010)
25/01/2011)
Final Report
sent to Railway
Board on
21.09.11 for
acceptance.
Final Report
sent to Railway
Board on
02.02.11 for
acceptance.
9.
PP&D/RVNL/MCLANLDA/Bank/2010
PP&D/RVNL/ADI UDZ/Bank/2010
N.A.
Study
done in
house.
N.A.
Study
done in
house.
PP&D/FT/HUK/20
10 dated
08.02.2011
Bankability study
for MacherlaNalgonda New Line
project in South
Central Railway.
PP&D/RVNL /
MCLA – NLDA /
BANKA / 2010
dated
21.02.11
Bankability study
for Ahmedabad Udaipur Gauge
Conversion project
in Western Railway.
N.A.
Traffic Study to
Sh.Sanjeeva
SHivesh ( ex
IRAS), CEO, Smart
Wave Consulting
Pvt. Ltd., 410/CA,
Shushant Lok, Cblock, Sec.-43,
Gurgaon.
N.A.
Study done in
house.
12,89,340/-
14,50,100/1,95,000/-
Feasibility Study for
Development of
Freight Terminal at
Holambi Kalan on
Northern Railway.
Traffic Study to
Shri H.S.Duggal,
Rtd.COM, Indian
Railways,C/2/21,
Goyal Inter City,
Block-C, Drive in
Road, Thaltej,
Ahemedabad-54
M/S Deloitte
Touche
Tohmatsu India
Pvt. Ltd.
8,76,885/-
21.01.11
PP&D/RVNL/DHD
-INDB/Bank/2010
dated 24.12.2010
1,75,000/-
PP&D/FT/HUK/2010
Study
done in
house.
Bankability study
for Dahod-Indore
New Line project in
Western Railway.
M/s
Pricewaterhouse
Coopers Pvt. Ltd.
-------
N.A.
PP&D/RVNL/ HXSBC/2010
24/09/2010
8 weeks from the
date of
acceptance of
CV(06/10/2010)
2/12/2010
Final Report
sent to Railway
Board on
30.12.11 for
acceptance.
6 weeks from LAO
(24.12.10) for
Traffic Study
which is out
sourced.
Final report is
under
examination by
RVNL Finance.
16 weeks from
the date of
acceptance of
CV(18/02/2011)
Draft Final
report is under
examination.
10/06/2011)
4 weeks from LOA
(21.02.11) for
Traffic Study
which is out
sourced.
Revised Final
report is under
examination by
RVNL Finance.
20.03.2011
N.A.
------
8.
PP&D/RVNL/DHDINDB/Bank/2010
Bankability study
for CuddapahBangalore New Line
project.
5,00,000/-
7.
23.08.10
------
6.
PP&D/RVNL/ HXSBC/2010
------
5.
Study done in
house and
Completed,
Report sent to
Rly. Board on
31.12.2010.
13.
No.
RVNL/PP&D/RFP/PN
U-SIOB/2011
04/01/11
16.01.12
Bankability study of
Rayadurg-Tumkur
New line in South
Western Railway
No. PP&D/RVNL/
RDG-TK
/BANK/2010
Dated: 19/04/2011
M/s Deloitte
Touche Tohmatsu
India Pvt. Ltd.
No.
RVNL/PP&D/RFP/
PNU-SIOB/2011
Dated: 23.01.2012
M/s. Feedback
Infrastructure
Services Pvt. Ltd.
12,28,179.47
M/s
ARKITECHNO
Consultants (India)
Pvt. Ltd
9,71,168.00
No.
PP&D/RVNL/DWR
BGM/BANK/Tende
r/2010
Dated: 04/04/2011
15,00,000.00
Bankability study of
Dharwad –
Belgaum New line
in South Western
Railway
Bankability study of
Palanpur-Samkhyali
doubling project in
WR.
M/s Deloitte
Touche
Tohmatsu India
Pvt. Ltd.
14,89,000.00
No.
PP&D/RVNL/BJPSDB/BANK/2010
Dated: 08/03/2011
12,28,179.47
No. PP&D/RVNL/
RDG-TK / BANK/2010
27/12/10
Bankability study of
Bijapur Shahabad New line
in South Western
Railway
7,49,000.00
12.
No.
PP&D/RVNL/DWR BGM/BANK/ 2010
20/12/10
14,89,000.00
11.
No. PP&D/RVNL/BJP
-SDB/BANK/2010
7,00,000.00
10.
(3 months from
LOA dated
08.03.2011)
06/06/2011
(3 months from
LOA dated
04.04.2011)
03/07/2011
(3 months from
LOA dated
19.04.2011)
18.07.2011
(6 weeks from the
date after
acceptance of
CVs of key
professionals.
CVs accepted on
30.01.2012)
09.03. 2012
Final Report
sent to Railway
Board on
30.12.11 for
acceptance.
Final Report
sent to Railway
Board on
30.12.11 for
acceptance.
Final Report
sent to Railway
Board on
30.12.11 for
acceptance.
Draft report
submitted on
29.02.2012.
Final report is
under
preparation.
Detail of Contract awarded upto March, 2012
Project Planning & Development Department
4.
PP&D/RVNL/ KURBOLANGIR/2010
21.08.10
21.09.10
M/S Feedback
Ventures Pvt. Ltd.
Bankability study of
electrification of
Nallapadu-Guntakal
section
RVNL/PP&D/Babk
ability/NallapaduGuntakal/RE/10
11/06/2010
Project Consultancy
services for
development of PPP
model in Railway
projects.
PP&D/RFP/BOT/
CONSULT/2009/P
t. II dated:
25.03.2010
Bankability study
for Khurda RoadBolangir New Line
project.
PP&D/RVNL/
KURBOLANGIR/2010
04/10/2010
M/s
Pricewaterhouse
Coopers Pvt. Ltd
13,18,085/-
RVNL/PP&D/Bank
ability/BuramaraChakulia/10
30/04/2010
Tendered
cost (Rs.)
9,91,514/-
Bankability study of
Buramara-Chakulia
New Line with
upgradation of
Rupsa-Buramara BG
Line on SER.
Estimated
cost of
work (Rs.)
15,00,000/-
Contractor’s
Name
M/s. RITES Ltd.
M/S Deloitte
Touche
Tohmatsu India
Pvt. Ltd.
15,00,000/-
PP&D/RFP/BOT/CO
NSULT/2009/Pt. II
09/04/10
Contract No. &
date (LOA)
9,65,125/-
3.
RVNL/PP&D/Bankabil
ity/Nallapadu Guntakal/RE/10
Description of
work/study
15,00,000/-
2
RVNL/PP&D/Bankabil
ity/Buramara Chakulia/10
Date of
opening
(Tender)
25/03/10
30,93,293/-
1
Tender No.
15,00,000/-
Sr.
No.
Scheduled
completion date
3 months from the
date of
submission of
Bank Guarantee
(14/05/2010)
Physical
Progress
( upto 31.03.12)
Completed
15/08/2010
(extended)
3 months from the
date of
submission of
Bank Guarantee
(25/06/2010)
Completed
25/09/2010
(extended)
26 weeks from
the date of
acceptance of
LOA(25/03/2010)
Completed
25/09/2010
(extended)
10 weeks from
the date of
acceptance of
CV(15/10/2010)
25/01/2011)
Completed
8.
PP&D/RVNL/MCLANLDA/Bank/2010
21.01.11
N.A.
Study
done in
house.
9.
PP&D/RVNL/ADI UDZ/Bank/2010
N.A.
Study
done in
house.
PP&D/FT/HUK/20
10 dated
08.02.2011
Bankability study
for MacherlaNalgonda New Line
project in South
Central Railway.
PP&D/RVNL /
MCLA – NLDA /
BANKA / 2010
dated
21.02.11
Bankability study
for Ahmedabad Udaipur Gauge
Conversion project
in Western Railway.
N.A.
Traffic Study to
Sh.Sanjeeva
SHivesh ( ex
IRAS), CEO, Smart
Wave Consulting
Pvt. Ltd., 410/CA,
Shushant Lok, Cblock, Sec.-43,
Gurgaon.
N.A.
Study done in
house.
12,89,340/-
14,50,100/1,95,000/-
Feasibility Study for
Development of
Freight Terminal at
Holambi Kalan on
Northern Railway.
Traffic Study to
Shri H.S.Duggal,
Rtd.COM, Indian
Railways,C/2/21,
Goyal Inter City,
Block-C, Drive in
Road, Thaltej,
Ahemedabad-54
M/S Deloitte
Touche
Tohmatsu India
Pvt. Ltd.
8,76,885/-
PP&D/FT/HUK/2010
PP&D/RVNL/DHD
-INDB/Bank/2010
dated 24.12.2010
1,75,000/-
7.
Bankability study
for Dahod-Indore
New Line project in
Western Railway.
M/s
Pricewaterhouse
Coopers Pvt. Ltd.
8 weeks from the
date of
acceptance of
CV(06/10/2010)
Completed
2/12/2010
6 weeks from LAO
(24.12.10) for
Traffic Study
which is out
sourced.
Final report is
under
examination by
RVNL Finance
since
07.02.2012.
16 weeks from
the date of
acceptance of
CV(18/02/2011)
Draft Final
report is under
examination.
10/06/2011)
4 weeks from LOA
(21.02.11) for
Traffic Study
which is out
sourced.
Revised Final
report is under
examination by
RVNL Finance
since
22.12.2011.
20.03.2011
N.A.
------
Study
done in
house.
PP&D/RVNL/ HXSBC/2010
24/09/2010
-------
N.A.
Bankability study
for CuddapahBangalore New Line
project.
5,00,000/-
PP&D/RVNL/DHDINDB/Bank/2010
23.08.10
------
6.
PP&D/RVNL/ HXSBC/2010
------
5.
Completed
No.
RVNL/PP&D/RFP/PN
U-SIOB/2011
16.01.12
Bankability study of
Palanpur-Samkhyali
doubling project in
WR.
No.
PP&D/RVNL/DWR
BGM/BANK/Tende
r/2010
Dated: 04/04/2011
M/s
ARKITECHNO
Consultants (India)
Pvt. Ltd
No. PP&D/RVNL/
RDG-TK
/BANK/2010
Dated: 19/04/2011
M/s Deloitte
Touche Tohmatsu
India Pvt. Ltd.
No.
RVNL/PP&D/RFP/
PNU-SIOB/2011
Dated: 23.01.2012
M/s. Feedback
Infrastructure
Services Pvt. Ltd.
12,28,179.47
15,00,000.00
Completed
(3 months from
LOA dated
08.03.2011)
06/06/2011
Completed
9,71,168.00
Bankability study of
Rayadurg-Tumkur
New line in South
Western Railway
M/s Deloitte
Touche
Tohmatsu India
Pvt. Ltd.
12,28,179.47
04/01/11
Bankability study of
Dharwad –
Belgaum New line
in South Western
Railway
No.
PP&D/RVNL/BJPSDB/BANK/2010
Dated: 08/03/2011
7,49,000.00
13.
No. PP&D/RVNL/
RDG-TK / BANK/2010
27/12/10
Bankability study of
Bijapur Shahabad New line
in South Western
Railway
14,89,000.00
12.
No.
PP&D/RVNL/DWR BGM/BANK/ 2010
20/12/10
14,89,000.00
11.
No. PP&D/RVNL/BJP
-SDB/BANK/2010
7,00,000.00
10.
(3 months from
LOA dated
04.04.2011)
03/07/2011
Completed
(3 months from
LOA dated
19.04.2011)
18.07.2011
(6 weeks from the
date after
acceptance of
CVs of key
professionals.
CVs accepted on
30.01.2012)
09.03. 2012
Final report
submitted on
23.03.2012 is
under
examination by
Kutch Railway
Company Ltd.
(KRC).
Detail of Contract awarded upto MAY, 2012
Project Planning & Development Department
PP&D/RVNL/MCLANLDA/Bank/2010
N.A.
Study
done in
house.
13.
No.
RVNL/PP&D/RFP/PN
U-SIOB/2011
16.01.12
Feasibility Study for
Development of
Freight Terminal at
Holambi Kalan on
Northern Railway.
PP&D/FT/HUK/20
10 dated
08.02.2011
Traffic Study to
Shri H.S.Duggal,
Rtd.COM, Indian
Railways,C/2/21,
Goyal Inter City,
Block-C, Drive in
Road, Thaltej,
Ahemedabad-54
M/S Deloitte
Touche
Tohmatsu India
Pvt. Ltd.
Bankability study
for MacherlaNalgonda New Line
project in South
Central Railway.
PP&D/RVNL /
MCLA – NLDA /
BANKA / 2010
dated
21.02.11
Bankability study of
Palanpur-Samkhyali
doubling project in
WR.
No.
RVNL/PP&D/RFP/
PNU-SIOB/2011
Dated: 23.01.2012
Traffic Study to
Sh.Sanjeeva
SHivesh ( ex
IRAS), CEO, Smart
Wave Consulting
Pvt. Ltd., 410/CA,
Shushant Lok, Cblock, Sec.-43,
Gurgaon.
M/s. Feedback
Infrastructure
Services Pvt. Ltd.
1,95,000/-
PP&D/RVNL/DHD
-INDB/Bank/2010
dated 24.12.2010
Tendered
cost (Rs.)
8,76,885/-
21.01.11
Bankability study
for Dahod-Indore
New Line project in
Western Railway.
Estimated
cost of
work (Rs.)
1,75,000/-
3.
PP&D/FT/HUK/2010
Contractor’s
Name
7,49,000.00
2.
Contract No. &
date (LOA)
-------
Study
done in
house.
Description of
work/study
5,00,000/-
PP&D/RVNL/DHDINDB/Bank/2010
Date of
opening
(Tender)
N.A.
------
1.
Tender No.
7,00,000.00
Sr.
No.
Scheduled
completion date
6 weeks from LAO
(24.12.10) for
Traffic Study
which is out
sourced.
16 weeks from
the date of
acceptance of
CV(18/02/2011)
Physical
Progress
( upto 31.05.12)
Final report is
under
examination by
RVNL Finance
since
07.02.2012.
Draft Final
report is under
examination.
10/06/2011)
4 weeks from LOA
(21.02.11) for
Traffic Study
which is out
sourced.
Revised Final
report is under
examination by
RVNL Finance
since
22.12.2011.
20.03.2011
(6 weeks from the
date after
acceptance of
CVs of key
professionals.
CVs accepted on
30.01.2012)
09.03. 2012
Final report
approved by
RVNL BOD on
19.05.12 and
being sent to
Rly. Bd. For
acceptance.
Detail of Contract awarded upto JUNE, 2012
Project Planning & Development Department
PP&D/RVNL/MCLANLDA/Bank/2010
N.A.
Study
done in
house.
13.
No.
RVNL/PP&D/RFP/PN
U-SIOB/2011
16.01.12
Feasibility Study for Development of Freight Terminal at Holambi Kalan on Northern Railway. PP&D/FT/HUK/20
10 dated
08.02.2011
Traffic Study to Shri H.S.Duggal, Rtd.COM, Indian Railways,C/2/21, Goyal Inter City, Block‐C, Drive in Road, Thaltej, Ahemedabad‐54 M/S Deloitte Touche Tohmatsu India Pvt. Ltd. Bankability study for Macherla‐
Nalgonda New Line project in South Central Railway. PP&D/RVNL /
MCLA – NLDA /
BANKA / 2010
dated
21.02.11
Bankability study of
Palanpur-Samkhyali
doubling project in
WR.
No.
RVNL/PP&D/RFP/
PNU-SIOB/2011
Dated: 23.01.2012
Traffic Study to Sh.Sanjeeva SHivesh ( ex IRAS), CEO, Smart Wave Consulting Pvt. Ltd., 410/CA, Shushant Lok, C‐
block, Sec.‐43, Gurgaon. M/s. Feedback
Infrastructure
Services Pvt. Ltd.
1,95,000/-
PP&D/RVNL/DHD
-INDB/Bank/2010
dated 24.12.2010
Tendered
cost (Rs.)
8,76,885/-
21.01.11
Bankability study for Dahod‐Indore New Line project in Western Railway. Estimated
cost of
work (Rs.)
1,75,000/-
3.
PP&D/FT/HUK/2010
Contractor’s
Name
7,49,000.00
2.
Contract No. &
date (LOA)
-------
Study
done in
house.
Description of
work/study
5,00,000/-
PP&D/RVNL/DHDINDB/Bank/2010
Date of
opening
(Tender)
N.A.
------
1.
Tender No.
7,00,000.00
Sr.
No.
Scheduled
completion date
6 weeks from LAO
(24.12.10) for
Traffic Study
which is out
sourced.
16 weeks from
the date of
acceptance of
CV(18/02/2011)
Final report is
under
examination.
10/06/2011)
4 weeks from LOA
(21.02.11) for
Traffic Study
which is out
sourced.
Final report is
being placed
before RVNL
BOD for
approval.
20.03.2011
(6 weeks from the
date after
acceptance of
CVs of key
professionals.
CVs accepted on
30.01.2012)
09.03. 2012
Physical
Progress
( upto 30.06.12)
Final report is
being placed
before RVNL
BOD for
approval.
Final Report
sent to Railway
Board on
26.06.12 for
acceptance.
Detail of Contract awarded upto AUGUST, 2012
Project Planning & Development Department
3.
PP&D/FT/HUK/2010
PP&D/RVNL/MCLANLDA/Bank/2010
21.01.11
N.A.
Study
done in
house.
Bankability study
for Dahod-Indore
New Line project
in Western
Railway.
PP&D/RVNL/DH
DINDB/Bank/2010
dated
24.12.2010
Feasibility Study
for Development
of Freight
Terminal at
Holambi Kalan on
Northern Railway.
PP&D/FT/HUK/2
010 dated
08.02.2011
Traffic Study to
Shri H.S.Duggal,
Rtd.COM,
Indian
Railways,C/2/2
1, Goyal Inter
City, Block-C,
Drive in Road,
Thaltej,
Ahemedabad54
M/S Deloitte
Touche
Tohmatsu India
Pvt. Ltd.
Bankability study
for MacherlaNalgonda New
Line project in
South Central
Railway.
PP&D/RVNL /
MCLA – NLDA /
BANKA / 2010
dated
21.02.11
Traffic Study to
Sh.Sanjeeva
SHivesh ( ex
IRAS), CEO,
Smart Wave
Consulting Pvt.
Ltd., 410/CA,
Shushant Lok,
C-block, Sec.43, Gurgaon.
Estimated
cost of
work (Rs.)
Tendered
cost (Rs.)
1,95,000/-
Contractor’s
Name
8,76,885/-
2.
Contract No. &
date (LOA)
1,75,000/-
Study
done in
house.
Description of
work/study
-------
PP&D/RVNL/DHDINDB/Bank/2010
Date of
opening
(Tender)
N.A.
5,00,000/-
1.
Tender No.
------
Sr.
No.
Scheduled
completion date
6 weeks from LAO
(24.12.10) for
Traffic Study
which is out
sourced.
16 weeks from
the date of
acceptance of
CV(18/02/2011)
Physical
Progress
( upto 31.08.12)
Final report is
being placed
before RVNL
BOD for
approval.
Final report is
under
examination.
10/06/2011)
4 weeks from LOA
(21.02.11) for
Traffic Study
which is out
sourced.
20.03.2011
Final report is
being placed
before RVNL
BOD for
approval.
RVNL/PP&D/RF
P/PNUSIOB/2011
Dated: 23.01.2012
24.07.2012 Bankability study
PP&D/RVNL/SIOB
-GIMB/Bank/2012
Dated: 21.08.2012
of Samkhyali –
Gandhidham 3rd
Line project in
WR.
M/s. Feedback
Infrastructure
Services Pvt.
Ltd.
M/s. Feedback
Infrastructure
Services Pvt.
Ltd.
7,49,000.00
PP&D/RVNL/SIOBGIMB/Bank/2012
Bankability study
of PalanpurSamkhyali
doubling project
in WR.
11,89,892.00
5.
16.01.12
7,00,000.00
RVNL/PP&D/RFP/PN
U-SIOB/2011
15,20,000.00
4.
(6 weeks from the
date after
acceptance of
CVs of key
professionals.
CVs accepted on
30.01.2012)
09.03. 2012
(16 weeks from
the date after
acceptance of
CVs of key
professionals.
CVs accepted on
31.08.2012)
24.12. 2012
Completed
Study is under
process.
Detail of Contract awarded upto SEPTEMBER, 2012
Project Planning & Development Department
2.
3.
PP&D/FT/HUK/2010
PP&D/RVNL/MCLANLDA/Bank/2010
Bankability study
for MacherlaNalgonda New
Line project in
South Central
Railway.
PP&D/RVNL /
MCLA – NLDA /
BANKA / 2010
dated
21.02.11
24.07.2012 Bankability study
PP&D/RVNL/SIOB
-GIMB/Bank/2012
Dated: 21.08.2012
Traffic Study to
Sh.Sanjeeva SHivesh (
ex IRAS), CEO, Smart
Wave Consulting Pvt.
Ltd., 410/CA, Shushant
Lok, C-block, Sec.-43,
Gurgaon.
M/s. Feedback
Infrastructure Services
Pvt. Ltd.
PP&D/RVNL/REW
AS/2012/Tender
Dated: 03.09.2012
M/s GRANT
THRONTON
ADVISORY Pvt. Ltd.
21.01.11
N.A.
Study
done in
house.
4.
6.
PP&D/RVNL/SIOBGIMB/Bank/2012
of Samkhyali –
Gandhidham 3rd
Line project in
WR.
PP&D/RVNL/REWAS/ 13.08.2012 Bankability study
2012/Tender
of Rewas Port
1,95,000/-
PP&D/FT/HUK/2
010 dated
08.02.2011
Study
done in
house.
8,76,885/-
Feasibility Study
for Development
of Freight
Terminal at
Holambi Kalan on
Northern Railway.
Traffic Study to Shri
H.S.Duggal, Rtd.COM,
Indian
Railways,C/2/21, Goyal
Inter City, Block-C,
Drive in Road, Thaltej,
Ahemedabad-54
M/S Deloitte Touche
Tohmatsu India Pvt.
Ltd.
1,75,000/-
PP&D/RVNL/DH
DINDB/Bank/2010
dated
24.12.2010
Tendered
cost (Rs.)
Scheduled
completion date
6 weeks from LAO
(24.12.10) for
Traffic Study
which is out
sourced.
16 weeks from
the date of
acceptance of
CV(18/02/2011)
Physical
Progress
( upto 30.09.12)
Final report has
been placed
before RVNL
BOD for
approval.
Completed.
10/06/2011)
4 weeks from LOA
(21.02.11) for
Traffic Study
which is out
sourced.
Final report has
been placed
before RVNL
BOD for
approval.
20.03.2011
11,89,892.00
Bankability study
for Dahod-Indore
New Line project
in Western
Railway.
Estimated
cost of
work (Rs.)
(16 weeks from
the date after
acceptance of
CVs of key
professionals.
CVs accepted on
31.08.2012)
7,80,902.00
Contractor’s Name
-------
Contract No. &
date (LOA)
5,00,000/-
Description of
work/study
------
PP&D/RVNL/DHDINDB/Bank/2010
Date of
opening
(Tender)
N.A.
15,20,000.00
1.
Tender No.
15,00,000.00
Sr.
No.
24.12. 2012
(10 weeks from
the date after
acceptance of
CVs of key
professionals.
CVs accepted on
10.09.2012)
19.11. 2012
Study is under
progress.
Study is under
progress.
Detail of Contract awarded upto OCTOBER, 2012
Project Planning & Development Department
Bankability study
for Dahod-Indore
New Line project
in Western
Railway.
PP&D/RVNL/DH
DINDB/Bank/2010
dated
24.12.2010
Bankability study
for MacherlaNalgonda New
Line project in
South Central
Railway.
PP&D/RVNL /
MCLA – NLDA /
BANKA / 2010
dated
21.02.11
24.07.2012 Bankability study
PP&D/RVNL/SIOB
-GIMB/Bank/2012
Dated: 21.08.2012
Traffic Study to
Shri H.S.Duggal,
Rtd.COM,
Indian
Railways,C/2/2
1, Goyal Inter
City, Block-C,
Drive in Road,
Thaltej,
Ahemedabad54
Traffic Study to
Sh.Sanjeeva
SHivesh ( ex
IRAS), CEO,
Smart Wave
Consulting Pvt.
Ltd., 410/CA,
Shushant Lok,
C-block, Sec.43, Gurgaon.
M/s. Feedback
Infrastructure
Services Pvt.
Ltd.
Study
done in
house.
3.
PP&D/RVNL/MCLANLDA/Bank/2010
N.A.
Study
done in
house.
4.
PP&D/RVNL/SIOBGIMB/Bank/2012
of Samkhyali –
Gandhidham 3rd
Line project in
WR.
Estimated
cost of
work (Rs.)
Tendered
cost (Rs.)
1,95,000/-
Contractor’s
Name
1,75,000/-
Contract No. &
date (LOA)
11,89,892.00
Description of
work/study
-------
PP&D/RVNL/DHDINDB/Bank/2010
Date of
opening
(Tender)
N.A.
------
1.
Tender No.
15,20,000.00
Sr.
No.
Scheduled
completion date
6 weeks from LAO
(24.12.10) for
Traffic Study
which is out
sourced.
Physical
Progress
( upto 31.10.12)
Final report has
been approved
by RVNL BOD
for being sent to
Railway Board.
4 weeks from LOA
(21.02.11) for
Traffic Study
which is out
sourced.
Final report has
been approved
by RVNL BOD
for being sent to
Railway Board.
20.03.2011
(16 weeks from
the date after
acceptance of
CVs of key
professionals.
CVs accepted on
31.08.2012)
24.12. 2012
Study is under
progress.
PP&D/RVNL/REW
AS/2012/Tender
Dated: 03.09.2012
M/s GRANT
THRONTON
ADVISORY
Pvt. Ltd.
7,80,902.00
PP&D/RVNL/REWAS/ 13.08.2012 Bankability study
2012/Tender
of Rewas Port
15,00,000.00
6.
(10 weeks from
the date after
acceptance of
CVs of key
professionals.
CVs accepted on
10.09.2012)
19.11. 2012
Traffic study
report received
on 29.10.2012
and same is
under
examination.
Detail of Contract awarded upto NOVEMBER, 2012
Project Planning & Development Department
Bankability study
for Dahod-Indore
New Line project
in Western
Railway.
PP&D/RVNL/DH
DINDB/Bank/2010
dated
24.12.2010
Bankability study
for MacherlaNalgonda New
Line project in
South Central
Railway.
PP&D/RVNL /
MCLA – NLDA /
BANKA / 2010
dated
21.02.11
24.07.2012 Bankability study
PP&D/RVNL/SIOB
-GIMB/Bank/2012
Dated: 21.08.2012
Traffic Study to
Shri H.S.Duggal,
Rtd.COM,
Indian
Railways,C/2/2
1, Goyal Inter
City, Block-C,
Drive in Road,
Thaltej,
Ahemedabad54
Traffic Study to
Sh.Sanjeeva
SHivesh ( ex
IRAS), CEO,
Smart Wave
Consulting Pvt.
Ltd., 410/CA,
Shushant Lok,
C-block, Sec.43, Gurgaon.
M/s. Feedback
Infrastructure
Services Pvt.
Ltd.
Study
done in
house.
3.
PP&D/RVNL/MCLANLDA/Bank/2010
N.A.
Study
done in
house.
4.
PP&D/RVNL/SIOBGIMB/Bank/2012
of Samkhyali –
Gandhidham 3rd
Line project in
WR.
Estimated
cost of
work (Rs.)
Tendered
cost (Rs.)
1,95,000/-
Contractor’s
Name
1,75,000/-
Contract No. &
date (LOA)
11,89,892.00
Description of
work/study
-------
PP&D/RVNL/DHDINDB/Bank/2010
Date of
opening
(Tender)
N.A.
------
1.
Tender No.
15,20,000.00
Sr.
No.
Scheduled
completion date
6 weeks from LAO
(24.12.10) for
Traffic Study
which is out
sourced.
Physical
Progress
( upto 30.11.12)
Final Report
sent to Railway
Board on
05.11.12 for
acceptance.
4 weeks from LOA
(21.02.11) for
Traffic Study
which is out
sourced.
Final Report
sent to Railway
Board on
05.11.12 for
acceptance.
20.03.2011
(16 weeks from
the date after
acceptance of
CVs of key
professionals.
CVs accepted on
31.08.2012)
24.12. 2012
Draft report for
traffic study
received on
29.11.2012 and
same is under
examination.
16.11.2012 Bankability Study
of Dighi Port
NewLline
Not Yet Awarded
Not Yet Awarded
7,80,902.00
PP&D/RVNL/Dighi
Port/2008/Pt.VI
M/s GRANT
THRONTON
ADVISORY
Pvt. Ltd.
(10 weeks from
the date after
acceptance of
CVs of key
professionals.
CVs accepted on
10.09.2012)
19.11. 2012
Bid under
evaluation
-----------
7.
PP&D/RVNL/REW
AS/2012/Tender
Dated: 03.09.2012
15,00,000.00
PP&D/RVNL/REWAS/ 13.08.2012 Bankability study
2012/Tender
of Rewas Port
12,00,000.00
6.
Traffic study
report received
on 29.10.2012
and same is
under
examination.
Bid under
evaluation
Detail of Contract awarded upto DECEMBER, 2012
Project Planning & Development Department
Bankability study for Dahod‐Indore New Line project in Western Railway. PP&D/RVNL/DH
DINDB/Bank/2010
dated
24.12.2010
Bankability study for Macherla‐
Nalgonda New Line project in South Central Railway. PP&D/RVNL /
MCLA – NLDA /
BANKA / 2010
dated
21.02.11
24.07.2012 Bankability study
PP&D/RVNL/SIOB
-GIMB/Bank/2012
Dated: 21.08.2012
Traffic Study to Shri H.S.Duggal, Rtd.COM, Indian Railways,C/2/2
1, Goyal Inter City, Block‐C, Drive in Road, Thaltej, Ahemedabad‐
54 Traffic Study to Sh.Sanjeeva SHivesh ( ex IRAS), CEO, Smart Wave Consulting Pvt. Ltd., 410/CA, Shushant Lok, C‐block, Sec.‐
43, Gurgaon. M/s. Feedback
Infrastructure
Services Pvt.
Ltd.
Study
done in
house.
3.
PP&D/RVNL/MCLANLDA/Bank/2010
N.A.
Study
done in
house.
4.
PP&D/RVNL/SIOBGIMB/Bank/2012
of Samkhyali –
Gandhidham 3rd
Line project in
WR.
Estimated
cost of
work (Rs.)
Tendered
cost (Rs.)
1,95,000/-
Contractor’s
Name
1,75,000/-
Contract No. &
date (LOA)
11,89,892.00
Description of
work/study
-------
PP&D/RVNL/DHDINDB/Bank/2010
Date of
opening
(Tender)
N.A.
------
1.
Tender No.
15,20,000.00
Sr.
No.
Scheduled
completion date
6 weeks from LAO
(24.12.10) for
Traffic Study
which is out
sourced.
4 weeks from LOA
(21.02.11) for
Traffic Study
which is out
sourced.
Physical
Progress
( upto 31.12.12)
Completed.
Completed.
20.03.2011
(16 weeks from
the date after
acceptance of
CVs of key
professionals.
CVs accepted on
31.08.2012)
24.12. 2012
Draft report for
traffic study
received on
29.11.2012 and
same is under
examination.
PP&D/RVNL/Dighi
Port/2008/Pt.VI
16.11.2012 Bankability Study
PP&D/RVNL/Dighi
Port/2008/Pt.VI
Dated: 19.12.2012
of Dighi Port
NewLline
M/s Feedback Infrastructure Services P.Ltd
7,80,902.00
7.
M/s GRANT
THRONTON
ADVISORY
Pvt. Ltd.
8,93,262.00
PP&D/RVNL/REW
AS/2012/Tender
Dated: 03.09.2012
15,00,000.00
PP&D/RVNL/REWAS/ 13.08.2012 Bankability study
2012/Tender
of Rewas Port
12,00,000.00
6.
(10 weeks from
the date after
acceptance of
CVs of key
professionals.
CVs accepted on
10.09.2012)
19.11. 2012
CVs under
acceptance
Revised Traffic
study report
received on
18.12.2012 and
same is under
examination.
CVs under
acceptance
Detail of Contract awarded upto JANUARY, 2013
Project Planning & Development Department
M/s. Feedback
Infrastructure
Services Pvt.
Ltd.
2.
PP&D/RVNL/REWAS/ 13.08.2012 Bankability study
2012/Tender
of Rewas Port
PP&D/RVNL/REW
AS/2012/Tender
Dated: 03.09.2012
M/s GRANT
THRONTON
ADVISORY
Pvt. Ltd.
3.
PP&D/RVNL/Dighi
Port/2008/Pt.VI
16.11.2012 Bankability Study
PP&D/RVNL/Dighi
Port/2008/Pt.VI
Dated: 19.12.2012
M/s Feedback
Infrastructure
Services P.Ltd
of Dighi Port
NewLline
Tendered
cost (Rs.)
Scheduled
completion date
11,89,892.00
PP&D/RVNL/SIOB
-GIMB/Bank/2012
Dated: 21.08.2012
Estimated
cost of
work (Rs.)
(16 weeks from
the date after
acceptance of
CVs of key
professionals.
CVs accepted on
31.08.2012)
7,80,902.00
Contractor’s
Name
24.12. 2012
(10 weeks from
the date after
acceptance of
CVs of key
professionals.
CVs accepted on
10.09.2012)
8,93,262.00
of Samkhyali –
Gandhidham 3rd
Line project in
WR.
Contract No. &
date (LOA)
15,20,000.00
PP&D/RVNL/SIOBGIMB/Bank/2012
Date of
Description of
opening
work/study
(Tender)
24.07.2012 Bankability study
15,00,000.00
1.
Tender No.
12,00,000.00
Sr.
No.
19.11. 2012
(12 weeks from
the date after
acceptance of
CVs of key
professionals.
CVs accepted on
07.01.2013)
01.04. 2013
Physical
Progress
( upto 31.01.13)
Draft report for
traffic study
received on
29.11.2012.
Revised Draft
Final report is
under
preparation by
the Consultant.
Revised Traffic
study report
received on
18.12.2012.
Revised Draft
Final report is
under
preparation by
the Consultant.
Inception
Report
submitted on
20.01.2013
27.12.2012 Consultancy
Services to
Develop various
Model Agrements
of new Policy on
Participative
models in rail
connectivity and
capacity
augmentation
projects.
RVNL/PP&D/Mode
l/Agreement/2012
Dated 03.01.2013
M/s HSA
Advocates (
Hemant Sahai
Associates)
Kick – off
meeting held on
15.01.2013
37,50,000.00
RVNL/PP&D/Model/A
greement/2012
40,00,000.00
4.
N.A.
Detail of Contract awarded upto FEBRUARY, 2013
Project Planning & Development Department
M/s. Feedback
Infrastructure
Services Pvt.
Ltd.
2.
PP&D/RVNL/REWAS/ 13.08.2012 Bankability study
2012/Tender
of Rewas Port
PP&D/RVNL/REW
AS/2012/Tender
Dated: 03.09.2012
M/s GRANT
THRONTON
ADVISORY
Pvt. Ltd.
3.
PP&D/RVNL/Dighi
Port/2008/Pt.VI
16.11.2012 Bankability Study
PP&D/RVNL/Dighi
Port/2008/Pt.VI
Dated: 19.12.2012
M/s Feedback
Infrastructure
Services P.Ltd
of Dighi Port
NewLline
Tendered
cost (Rs.)
Scheduled
completion date
11,89,892.00
PP&D/RVNL/SIOB
-GIMB/Bank/2012
Dated: 21.08.2012
Estimated
cost of
work (Rs.)
(16 weeks from
the date after
acceptance of
CVs of key
professionals.
CVs accepted on
31.08.2012)
7,80,902.00
Contractor’s
Name
24.12. 2012
(10 weeks from
the date after
acceptance of
CVs of key
professionals.
CVs accepted on
10.09.2012)
8,93,262.00
of Samkhyali –
Gandhidham 3rd
Line project in
WR.
Contract No. &
date (LOA)
15,20,000.00
PP&D/RVNL/SIOBGIMB/Bank/2012
Date of
Description of
opening
work/study
(Tender)
24.07.2012 Bankability study
15,00,000.00
1.
Tender No.
12,00,000.00
Sr.
No.
19.11. 2012
(12 weeks from
the date after
acceptance of
CVs of key
professionals.
CVs accepted on
07.01.2013)
01.04. 2013
Physical
Progress
( upto 28.02.13)
Draft report for
traffic study
received on
29.11.2012.
Revised Draft
Final report is
under
preparation by
the Consultant.
Revised Traffic
study report
received on
18.12.2012.
Revised Draft
Final report is
under
preparation by
the Consultant.
Inception
Report
submitted on
20.01.2013
RVNL/PP&D/Mode
l/Agreement/2012
Dated 03.01.2013
PP&D/RVNL/ANGLSKND/Bank/tender/
2013
Dated 08.02.2013
M/s HSA
Advocates (
Hemant Sahai
Associates)
M/s. Feedback
Infrastructure
Services Pvt.
Ltd.
37,50,000.00
Services to
Develop various
Participative
Model
Agreements of
new Policy in Rail
connectivity and
capacity
augmentation
projects.
PP&D/RVNL/ANGL- 29.01.2013 Bankability Study
of Angul –
SKND/Bank/2012
Sukinda Road
New Line
40,00,000.00
27.12.2012 Consultancy
13,47,196.00
5.
RVNL/PP&D/Model/A
greement/2012
12,0,000.00
4.
N.A.
(16 weeks from
the date after
acceptance of
CVs of key
professionals.
CVs accepted on
07.01.2013)
01.04. 2013
Initial draft has
been
01.02.2013
submitted and
presentation
given/discussio
n held on
27.02.2013.
Kick – off
meeting held on
05.03.2013
Detail of Contract awarded upto MARCH, 2013
Project Planning & Development Department
3.
PP&D/RVNL/Dighi
Port/2008/Pt.VI
16.11.2012 Bankability Study
of Dighi Port
NewLline
M/s. Feedback
Infrastructure
Services Pvt.
Ltd.
PP&D/RVNL/REW
AS/2012/Tender
Dated: 03.09.2012
M/s GRANT
THRONTON
ADVISORY
Pvt. Ltd.
PP&D/RVNL/Dighi
Port/2008/Pt.VI
Dated: 19.12.2012
M/s Feedback
Infrastructure
Services P.Ltd
Tendered
cost (Rs.)
11,89,892.00
PP&D/RVNL/SIOB
-GIMB/Bank/2012
Dated: 21.08.2012
Estimated
cost of
work (Rs.)
7,80,902.00
PP&D/RVNL/REWAS/ 13.08.2012 Bankability study
2012/Tender
of Rewas Port
Contractor’s
Name
15,20,000.00
of Samkhyali –
Gandhidham 3rd
Line project in
WR.
Contract No. &
date (LOA)
8,93,262.00
2.
PP&D/RVNL/SIOBGIMB/Bank/2012
Date of
Description of
opening
work/study
(Tender)
24.07.2012 Bankability study
15,00,000.00
1.
Tender No.
12,00,000.00
Sr.
No.
Scheduled
completion date
(16 weeks from
the date after
acceptance of
CVs of key
professionals.
CVs accepted on
31.08.2012)
24.12. 2012
(10 weeks from
the date after
acceptance of
CVs of key
professionals.
CVs accepted on
10.09.2012)
19.11. 2012
(12 weeks from
the date after
acceptance of
CVs of key
professionals.
CVs accepted on
07.01.2013)
01.04. 2013
Physical
Progress
( upto 31.03.13)
Draft report for
traffic study
received on
29.11.2012.
Revised Draft
Final report is
under
preparation by
the Consultant.
Revised Traffic
study report
received on
18.12.2012.
Traffic Report
finalized on
18.03.2013.
Revised Draft
Final report is
under
preparation by
the Consultant.
Inception Report
submitted on
20.01.2013
RVNL/PP&D/Mode
l/Agreement/2012
Dated 03.01.2013
PP&D/RVNL/ANGLSKND/Bank/tender/
2013
Dated 08.02.2013
M/s HSA
Advocates (
Hemant Sahai
Associates)
M/s. Feedback
Infrastructure
Services Pvt.
Ltd.
37,50,000.00
Services to
Develop various
Participative
Model
Agreements of
new Policy in Rail
connectivity and
capacity
augmentation
projects.
PP&D/RVNL/ANGL- 29.01.2013 Bankability Study
of Angul –
SKND/Bank/2012
Sukinda Road
New Line
40,00,000.00
27.12.2012 Consultancy
13,47,196.00
5.
RVNL/PP&D/Model/A
greement/2012
12,0,000.00
4.
N.A.
(16 weeks from
the date after
acceptance of
CVs of key
professionals.
CVs accepted on
07.01.2013)
01.04. 2013
Initial draft has
been submitted
on 01.02.2013
and presentation
given/discussion
held on
27.02.2013.
Modified draft
MCA sent to
Railway Board
on 18.03.2013
for approval.
Kick – off
meeting held on
05.03.2013.
First Draft Report
submitted on
20.03.2013.
Detail of Contract awarded upto APRIL, 2013
Project Planning & Development Department
M/s. Feedback
Infrastructure
Services Pvt.
Ltd.
2.
PP&D/RVNL/REWAS/ 13.08.2012 Bankability study
2012/Tender
of Rewas Port
PP&D/RVNL/REW
AS/2012/Tender
Dated: 03.09.2012
M/s GRANT
THRONTON
ADVISORY
Pvt. Ltd.
3.
PP&D/RVNL/Dighi
Port/2008/Pt.VI
16.11.2012 Bankability Study
PP&D/RVNL/Dighi
Port/2008/Pt.VI
Dated: 19.12.2012
M/s Feedback
Infrastructure
Services P.Ltd
of Dighi Port
NewLline
Tendered
cost (Rs.)
Scheduled
completion date
11,89,892.00
PP&D/RVNL/SIOB
-GIMB/Bank/2012
Dated: 21.08.2012
Estimated
cost of
work (Rs.)
(16 weeks from
the date after
acceptance of
CVs of key
professionals.
CVs accepted on
31.08.2012)
7,80,902.00
Contractor’s
Name
24.12. 2012
(10 weeks from
the date after
acceptance of
CVs of key
professionals.
CVs accepted on
10.09.2012)
8,93,262.00
of Samkhyali –
Gandhidham 3rd
Line project in
WR.
Contract No. &
date (LOA)
15,20,000.00
PP&D/RVNL/SIOBGIMB/Bank/2012
Date of
Description of
opening
work/study
(Tender)
24.07.2012 Bankability study
15,00,000.00
1.
Tender No.
12,00,000.00
Sr.
No.
19.11. 2012
(12 weeks from
the date after
acceptance of
CVs of key
professionals.
CVs accepted on
07.01.2013)
01.04. 2013
Physical
Progress
( upto 30.04.13)
Revised Draft
report submitted
on 05.04.2013
and same is
under
examination.
Revised Traffic
Report report
submitted on
17.04.2013.
Revised Draft
Final report is
under
preparation by
the Consultant.
Draft report
submitted on
17.04.2013 and
same is under
examination.
PP&D/RVNL/ANGL- 29.01.2013 Bankability Study
of Angul –
SKND/Bank/2012
Sukinda Road
New Line
RVNL/PP&D/Mode
l/Agreement/2012
Dated 03.01.2013
PP&D/RVNL/ANGLSKND/Bank/tender/
2013
Dated 08.02.2013
M/s HSA
Advocates (
Hemant Sahai
Associates)
M/s. Feedback
Infrastructure
Services Pvt.
Ltd.
37,50,000.00
Services to
Develop various
Participative
Model
Agreements of
new Policy in Rail
connectivity and
capacity
augmentation
projects.
40,00,000.00
27.12.2012 Consultancy
13,47,196.00
5.
RVNL/PP&D/Model/A
greement/2012
12,0,000.00
4.
N.A.
(16 weeks from
the date after
acceptance of
CVs of key
professionals.
CVs accepted on
07.01.2013)
01.04. 2013
Further modified
draft MCA for
NGR Model sent
to Railway Board
on 18.03.2013
for approval.
The modified
draft of NGR
Model circulated
for internal
approval of
RVNL ON
22.04.2013.
First Draft Report
submitted on
05.04.2013.
Traffic Report is
under
preparation.
Detail of Contract awarded upto MAY, 2013
Project Planning & Development Department
M/s. Feedback
Infrastructure
Services Pvt.
Ltd.
2.
PP&D/RVNL/REWAS/ 13.08.2012 Bankability study
2012/Tender
of Rewas Port
PP&D/RVNL/REW
AS/2012/Tender
Dated: 03.09.2012
M/s GRANT
THRONTON
ADVISORY
Pvt. Ltd.
3.
PP&D/RVNL/Dighi
Port/2008/Pt.VI
16.11.2012 Bankability Study
PP&D/RVNL/Dighi
Port/2008/Pt.VI
Dated: 19.12.2012
M/s Feedback
Infrastructure
Services P.Ltd
of Dighi Port
NewLline
Tendered
cost (Rs.)
Scheduled
completion date
11,89,892.00
PP&D/RVNL/SIOB
-GIMB/Bank/2012
Dated: 21.08.2012
Estimated
cost of
work (Rs.)
(16 weeks from
the date after
acceptance of
CVs of key
professionals.
CVs accepted on
31.08.2012)
7,80,902.00
Contractor’s
Name
24.12. 2012
(10 weeks from
the date after
acceptance of
CVs of key
professionals.
CVs accepted on
10.09.2012)
8,93,262.00
of Samkhyali –
Gandhidham 3rd
Line project in
WR.
Contract No. &
date (LOA)
15,20,000.00
PP&D/RVNL/SIOBGIMB/Bank/2012
Date of
Description of
opening
work/study
(Tender)
24.07.2012 Bankability study
15,00,000.00
1.
Tender No.
12,00,000.00
Sr.
No.
19.11. 2012
(12 weeks from
the date after
acceptance of
CVs of key
professionals.
CVs accepted on
07.01.2013)
01.04. 2013
Physical
Progress
( upto 31.05.13)
Revised Draft
report submitted
on 05.04.2013
and same is
under
examination.
Revised Draft
Final report
submitted on
17.05.2013,
Revised report
resubmitted on
30.05.2013 is
under
examination.
Final report
submitted on
21.05.2013.
Same examined,
comments sent
for incorporation.
Final report
submitted on
28.05.2013 after
incorporation of
comments, same
is under
examination.
RVNL/PP&D/Mode
l/Agreement/2012
Dated 03.01.2013
PP&D/RVNL/ANGLSKND/Bank/tender/
2013
Dated 08.02.2013
M/s HSA
Advocates (
Hemant Sahai
Associates)
M/s. Feedback
Infrastructure
Services Pvt.
Ltd.
37,50,000.00
Services to
Develop various
Participative
Model
Agreements of
new Policy in Rail
connectivity and
capacity
augmentation
projects.
PP&D/RVNL/ANGL- 29.01.2013 Bankability Study
of Angul –
SKND/Bank/2012
Sukinda Road
New Line
40,00,000.00
27.12.2012 Consultancy
13,47,196.00
5.
RVNL/PP&D/Model/A
greement/2012
12,0,000.00
4.
N.A.
(16 weeks from
the date after
acceptance of
CVs of key
professionals.
CVs accepted on
07.01.2013)
01.04. 2013
Model for NGR
and JV for
Concession and
O&M Agreement
of Group “A” at
Stage –I sent to
Railway Board
on 18.03.2013
and 09.05.2013
respectively for
approval.
First Draft Report
submitted on
05.04.2013.
Traffic Report is
under
preparation.
DDetail of Contract awarded upto JUNE, 2013
Project Planning & Development Department
3.
PP&D/RVNL/Dighi
Port/2008/Pt.VI
16.11.2012 Bankability Study
of Dighi Port
NewLline
M/s. Feedback
Infrastructure
Services Pvt.
Ltd.
PP&D/RVNL/REW
AS/2012/Tender
Dated: 03.09.2012
M/s GRANT
THRONTON
ADVISORY
Pvt. Ltd.
PP&D/RVNL/Dighi
Port/2008/Pt.VI
Dated: 19.12.2012
M/s Feedback
Infrastructure
Services P.Ltd
Tendered
cost (Rs.)
11,89,892.00
PP&D/RVNL/SIOB
-GIMB/Bank/2012
Dated: 21.08.2012
Estimated
cost of
work (Rs.)
7,80,902.00
PP&D/RVNL/REWAS/ 13.08.2012 Bankability study
2012/Tender
of Rewas Port
Contractor’s
Name
15,20,000.00
of Samkhyali –
Gandhidham 3rd
Line project in
WR.
Contract No. &
date (LOA)
Scheduled
completion date
(16 weeks from
the date after
acceptance of
CVs of key
professionals.
CVs accepted on
31.08.2012)
24.12. 2012
(10 weeks from
the date after
acceptance of
CVs of key
professionals.
CVs accepted on
10.09.2012)
19.11. 2012
8,93,262.00
2.
PP&D/RVNL/SIOBGIMB/Bank/2012
Date of
Description of
opening
work/study
(Tender)
24.07.2012 Bankability study
15,00,000.00
1.
Tender No.
12,00,000.00
Sr.
No.
(12 weeks from
the date after
acceptance of
CVs of key
professionals.
CVs accepted on
07.01.2013)
01.04. 2013
Physical
Progress
( upto 30.06.13)
Revised Draft
report submitted
on 05.04.2013
and same was
examined. The
consultant is to
submitted Draft
Final Report.
Revised Draft
Final report
submitted on
17.05.2013,
Revised report
resubmitted on
30.05.2013 was
examined. The
consultant is to
submitted Final
Report.
Revised Final
Report-II
submitted on
17.06.2013,
same was
examined. The
consultant is to
submitted Final
Report.
RVNL/PP&D/Mode
l/Agreement/2012
Dated 03.01.2013
PP&D/RVNL/ANGLSKND/Bank/tender/
2013
Dated 08.02.2013
M/s HSA
Advocates (
Hemant Sahai
Associates)
M/s. Feedback
Infrastructure
Services Pvt.
Ltd.
37,50,000.00
Services to
Develop various
Participative
Model
Agreements of
new Policy in Rail
connectivity and
capacity
augmentation
projects.
PP&D/RVNL/ANGL- 29.01.2013 Bankability Study
of Angul –
SKND/Bank/2012
Sukinda Road
New Line
40,00,000.00
27.12.2012 Consultancy
13,47,196.00
5.
RVNL/PP&D/Model/A
greement/2012
12,0,000.00
4.
N.A.
(16 weeks from
the date after
acceptance of
CVs of key
professionals.
CVs accepted on
07.01.2013)
01.04. 2013
Preliminary draft
of DFCMO
Model & DBFMT
Model sent to
Railway Board
on 31.05.2013
and preliminary
draft UFA Model
sent to Railway
Board on
10.06.2013 for
approval.
Revised Draft
Final Report
submitted on
24.06.2013 was
examined. The
consultant is to
submitted Draft
Final Report.
Detail of Contract awarded upto JULY, 2013
Project Planning & Development Department
3.
PP&D/RVNL/Dighi
Port/2008/Pt.VI
16.11.2012 Bankability Study
of Dighi Port
NewLline
M/s. Feedback
Infrastructure
Services Pvt.
Ltd.
PP&D/RVNL/REW
AS/2012/Tender
Dated: 03.09.2012
M/s GRANT
THRONTON
ADVISORY
Pvt. Ltd.
PP&D/RVNL/Dighi
Port/2008/Pt.VI
Dated: 19.12.2012
M/s Feedback
Infrastructure
Services P.Ltd
Tendered
cost (Rs.)
11,89,892.00
PP&D/RVNL/SIOB
-GIMB/Bank/2012
Dated: 21.08.2012
Estimated
cost of
work (Rs.)
7,80,902.00
PP&D/RVNL/REWAS/ 13.08.2012 Bankability study
2012/Tender
of Rewas Port
Contractor’s
Name
15,20,000.00
of Samkhyali –
Gandhidham 3rd
Line project in
WR.
Contract No. &
date (LOA)
8,93,262.00
2.
PP&D/RVNL/SIOBGIMB/Bank/2012
Date of
Description of
opening
work/study
(Tender)
24.07.2012 Bankability study
15,00,000.00
1.
Tender No.
12,00,000.00
Sr.
No.
Scheduled
completion date
(16 weeks from
the date after
acceptance of
CVs of key
professionals.
CVs accepted on
31.08.2012)
24.12. 2012
(10 weeks from
the date after
acceptance of
CVs of key
professionals.
CVs accepted on
10.09.2012)
19.11. 2012
(12 weeks from
the date after
acceptance of
CVs of key
professionals.
CVs accepted on
07.01.2013)
01.04. 2013
Physical
Progress
( upto 31.07.13)
Revised Draft
report submitted
on 05.04.2013
and same was
examined. The
consultant is to
submitted Draft
Final Report.
Revised Draft
Final report
submitted on
17.05.2013,
Revised report
resubmitted on
30.05.2013 was
examined. The
consultant
submitted Final
Report which is
under process.
Revised Final
Report-II
submitted on
17.06.2013,
same was
examined. The
consultant
submitted Final
Report which is
under process.
RVNL/PP&D/Mode
l/Agreement/2012
Dated 03.01.2013
PP&D/RVNL/ANGLSKND/Bank/tender/
2013
Dated 08.02.2013
M/s HSA
Advocates (
Hemant Sahai
Associates)
M/s. Feedback
Infrastructure
Services Pvt.
Ltd.
37,50,000.00
Services to
Develop various
Participative
Model
Agreements of
new Policy in Rail
connectivity and
capacity
augmentation
projects.
PP&D/RVNL/ANGL- 29.01.2013 Bankability Study
of Angul –
SKND/Bank/2012
Sukinda Road
New Line
40,00,000.00
27.12.2012 Consultancy
13,47,196.00
5.
RVNL/PP&D/Model/A
greement/2012
12,0,000.00
4.
N.A.
(16 weeks from
the date after
acceptance of
CVs of key
professionals.
CVs accepted on
07.01.2013)
01.04. 2013
Preliminary draft
of DFCMO
Model & DBFMT
Model sent to
Railway Board
on 31.05.2013
and preliminary
draft UFA Model
sent to Railway
Board on
10.06.2013 for
approval.
Revised Draft
Final Report
submitted on
24.06.2013 was
examined. The
consultant
submitted Draft
Final Report,
which is under
examination.
Detail of Contract awarded upto AUGUST, 2013
Project Planning & Development Department
M/s. Feedback
Infrastructure
Services Pvt.
Ltd.
2.
PP&D/RVNL/REWAS/ 13.08.2012 Bankability study
2012/Tender
of Rewas Port
PP&D/RVNL/REW
AS/2012/Tender
Dated: 03.09.2012
M/s GRANT
THRONTON
ADVISORY
Pvt. Ltd.
3.
PP&D/RVNL/Dighi
Port/2008/Pt.VI
16.11.2012 Bankability Study
PP&D/RVNL/Dighi
Port/2008/Pt.VI
Dated: 19.12.2012
M/s Feedback
Infrastructure
Services P.Ltd
of Dighi Port
NewLline
Tendered
cost (Rs.)
Scheduled
completion date
11,89,892.00
PP&D/RVNL/SIOB
-GIMB/Bank/2012
Dated: 21.08.2012
Estimated
cost of
work (Rs.)
(16 weeks from
the date after
acceptance of
CVs of key
professionals.
CVs accepted on
31.08.2012)
7,80,902.00
Contractor’s
Name
24.12. 2012
(10 weeks from
the date after
acceptance of
CVs of key
professionals.
CVs accepted on
10.09.2012)
8,93,262.00
of Samkhyali –
Gandhidham 3rd
Line project in
WR.
Contract No. &
date (LOA)
15,20,000.00
PP&D/RVNL/SIOBGIMB/Bank/2012
Date of
Description of
opening
work/study
(Tender)
24.07.2012 Bankability study
15,00,000.00
1.
Tender No.
12,00,000.00
Sr.
No.
19.11. 2012
(12 weeks from
the date after
acceptance of
CVs of key
professionals.
CVs accepted on
07.01.2013)
01.04. 2013
Physical
Progress
( upto 31.08.13)
Revised Draft
report submitted
on 05.04.2013
and same was
examined. The
consultant is to
submit Draft
Final Report.
Final report is
being placed
before RVNL
BOD for
approval.
Final report is
being placed
before RVNL
BOD for
approval.
RVNL/PP&D/Mode
l/Agreement/2012
Dated 03.01.2013
PP&D/RVNL/ANGLSKND/Bank/tender/
2013
Dated 08.02.2013
M/s HSA
Advocates (
Hemant Sahai
Associates)
M/s. Feedback
Infrastructure
Services Pvt.
Ltd.
37,50,000.00
Services to
Develop various
Participative
Model
Agreements of
new Policy in Rail
connectivity and
capacity
augmentation
projects.
PP&D/RVNL/ANGL- 29.01.2013 Bankability Study
of Angul –
SKND/Bank/2012
Sukinda Road
New Line
40,00,000.00
27.12.2012 Consultancy
13,47,196.00
5.
RVNL/PP&D/Model/A
greement/2012
12,0,000.00
4.
N.A.
(16 weeks from
the date after
acceptance of
CVs of key
professionals.
CVs accepted on
07.01.2013)
01.04. 2013
Preliminary draft
of DFCMO
Model & DBFMT
Model sent to
Railway Board
on 31.05.2013
and preliminary
draft UFA Model
sent to Railway
Board on
10.06.2013 for
approval.
Presentation
made by the
Consultant on
Revised Final
report on
21.08.2013 in
the BOD of
ASRL.
Detail of Contract awarded upto SEPTEMBER, 2013
Project Planning & Development Department
M/s. Feedback
Infrastructure
Services Pvt.
Ltd.
PP&D/RVNL/REWAS/ 13.08.2012 Bankability study
2012/Tender
of Rewas Port
PP&D/RVNL/REW
AS/2012/Tender
Dated: 03.09.2012
M/s GRANT
THRONTON
ADVISORY
Pvt. Ltd.
16.11.2012 Bankability Study
PP&D/RVNL/Dighi
Port/2008/Pt.VI
Dated: 19.12.2012
M/s Feedback
Infrastructure
Services P.Ltd
PP&D/RVNL/SIOBGIMB/Bank/2012
2.
3.
PP&D/RVNL/Dighi
Port/2008/Pt.VI
of Samkhyali –
Gandhidham 3rd
Line project in
WR.
of Dighi Port
NewLline
Tendered
cost (Rs.)
Scheduled
completion date
Physical
Progress
( upto 30.09.13)
Revised Draft
report submitted
on 05.04.2013
and same was
examined. The
consultant is to
submit Draft
Final Report.
11,89,892.00
PP&D/RVNL/SIOB
-GIMB/Bank/2012
Dated: 21.08.2012
1.
Estimated
cost of
work (Rs.)
(16 weeks from
the date after
acceptance of
CVs of key
professionals.
CVs accepted on
31.08.2012)
7,80,902.00
Contractor’s
Name
24.12. 2012
(10 weeks from
the date after
acceptance of
CVs of key
professionals.
CVs accepted on
10.09.2012)
After approval of
BOD/RVNL on
18.09.2013,
Final Report sent
to Railway Board
on 23.09.13 for
acceptance.
8,93,262.00
Contract No. &
date (LOA)
15,20,000.00
Date of
Description of
opening
work/study
(Tender)
24.07.2012 Bankability study
15,00,000.00
Tender No.
12,00,000.00
Sr.
No.
19.11. 2012
(12 weeks from
the date after
acceptance of
CVs of key
professionals.
CVs accepted on
07.01.2013)
After approval of
BOD/RVNL on
18.09.2013,
Final Report sent
to Railway Board
on 23.09.13 for
acceptance
01.04. 2013
PP&D/RVNL/ANGLSKND/Bank/tender/
2013
Dated 08.02.2013
PP&D/RVNL/Tender
/NandgaonUmroli/2013
Dated 17.09.2013
M/s. Feedback
Infrastructure
Services Pvt.
Ltd.
M/s Deloitte
Touche
Tohmatsu India
Pvt.Ltd.
37,50,000.00
Dated 03.01.2013
M/s HSA
Advocates (
Hemant Sahai
Associates)
N.A.
13,47,196.00
PP&D/RVNL/Ten
der/NandgaonUmroli/2013
06.08.2013 Bankability Study of
Umroli Station to
Nandgaon Port new
line
project
in
Western Railway.
RVNL/PP&D/Mode
l/Agreement/2012
40,00,000.00
Services to
Develop various
Participative
Model
Agreements of
new Policy in Rail
connectivity and
capacity
augmentation
projects.
PP&D/RVNL/ANGL- 29.01.2013 Bankability Study
of Angul –
SKND/Bank/2012
Sukinda Road
New Line
(16 weeks from
the date after
acceptance of
CVs of key
professionals.
CVs accepted on
07.01.2013)
12,92,140/-
6.
27.12.2012 Consultancy
12,0,000.00
5.
RVNL/PP&D/Model/A
greement/2012
12,68,544/-
4.
01.04. 2013
16 weeks from
acceptance of CVs
of key
professionals.
CVs not yet
accepted.
Preliminary draft
of DFCMO
Model & DBFMT
Model sent to
Railway Board
on 31.05.2013
and preliminary
draft UFA Model
sent to Railway
Board on
10.06.2013 for
approval.
Completed
CVs of key
professionals are
under evaluation
as on
30.09.2013
Detail of Contract awarded upto OCTOBER, 2013
Project Planning & Development Department
PP&D/RVNL/REWAS/ 13.08.2012 Bankability
2012/Tender
study of
Rewas Port
3.
PP&D/RVNL/Dighi
Port/2008/Pt.VI
16.11.2012 Bankability
Study of
Dighi Port
NewLline
PP&D/RVNL/SIOBGIMB/Bank/2012
Dated: 21.08.2012
M/s.
Feedback
Infrastructure
Services Pvt.
Ltd.
PP&D/RVNL/REWA
S/2012/Tender
Dated: 03.09.2012
M/s GRANT
THRONTON
ADVISORY
Pvt. Ltd.
PP&D/RVNL/Dighi
Port/2008/Pt.VI
Dated: 19.12.2012
M/s
Feedback
Infrastructur
e Services
P.Ltd
Estimated
cost of
work
(Rs.)
Tendere
d cost
(Rs.)
11,89,892.00
study of
Samkhyali –
Gandhidham
3rd Line project
in WR.
Contractor’s
Name
Scheduled
completion
date
(16 weeks from
the date after
acceptance of
CVs of key
professionals.
CVs accepted
on 31.08.2012)
24.12. 2012
7,80,902.00
24.07.2012 Bankability
Contract No. &
date (LOA)
15,20,000.00
Description of
work/study
(10 weeks from
the date after
acceptance of
CVs of key
professionals.
CVs accepted
on 10.09.2012)
8,93,262.00
2.
PP&D/RVNL/SIOBGIMB/Bank/2012
Date of
opening
(Tender)
15,00,000.00
1.
Tender No.
12,00,000.00
Sr.
No.
19.11. 2012
(12 weeks from
the date after
acceptance of
CVs of key
professionals.
CVs accepted
on 07.01.2013)
01.04. 2013
Physical
Progress
( upto
31.10.13)
Revised Draft
report
submitted on
05.04.2013
and same
was
examined.
The
consultant is
to submit
Draft Final
Report.
Completed
Completed
PP&D/RVNL/Ten
der/NandgaonUmroli/2013
06.08.2013 Bankability
Study of Umroli
Station
to
Nandgaon Port
new line project
in
Western
Railway.
RVNL/PP&D/Model/
Agreement/2012
Dated 03.01.2013
PP&D/RVNL/Tender/N
andgaon-Umroli/2013
Dated 17.09.2013
M/s HSA
Advocates (
Hemant
Sahai
Associates)
M/s Deloitte
Touche
Tohmatsu
India Pvt.Ltd.
37,50,000.00
Services to
Develop
various
Participative
Model
Agreements of
new Policy in
Rail
connectivity
and capacity
augmentation
projects.
40,00,000.00
27.12.2012 Consultancy
12,92,140/-
5.
RVNL/PP&D/Model/A
greement/2012
12,68,544/-
4.
N.A.
16 weeks from
acceptance of
CVs of key
professionals.
CVs not yet
accepted.
Preliminary
draft of
DFCMO
Model &
DBFMT
Model sent to
Railway
Board on
31.05.2013
and
preliminary
draft UFA
Model sent to
Railway
Board on
10.06.2013
for approval.
Inception
Report
submitted on
17.10.2013.
Detail of Contract awarded upto NOVEMBER, 2013
1.
Tender No.
Date of
opening
(Tender)
Description of
work/study
PP&D/RVNL/SIOBGIMB/Bank/2012
24.07.2012 Bankability
RVNL/PP&D/Model/A
greement/2012
27.12.2012 Consultancy
study of
Samkhyali –
Gandhidham
3rd Line project
in WR.
Contract No. &
date (LOA)
Contractor’s
Name
PP&D/RVNL/SIOBGIMB/Bank/2012
Dated: 21.08.2012
M/s.
Feedback
Infrastructure
Services Pvt.
Ltd.
RVNL/PP&D/Model/
Agreement/2012
M/s HSA
Advocates (
Hemant
Sahai
Associates)
Estimated
cost of
work
(Rs.)
15,20,000.00
Sr.
No.
Tendere
d cost
(Rs.)
Scheduled
completion
date
11,89,892.00
Project Planning & Development Department
(16 weeks from
the date after
acceptance of
CVs of key
professionals.
CVs accepted
on 31.08.2012)
Physical
Progress
( upto
30.11.13)
Revised Draft
Final Report
submitted on
11.11.2013
and same is
under
examination.
06.08.20 13 Bankability
Study of Umroli
Station
to
Nandgaon Port
new line project
in
Western
Railway.
PP&D/RVNL/Tender/N
andgaon-Umroli/2013
Dated 17.09.2013
M/s Deloitte
Touche
Tohmatsu
India Pvt.Ltd.
37,50,000.00
12,92,140/-
PP&D/RVNL/Ten
der/NandgaonUmroli/2013
Dated 03.01.2013
12,68,544/-
3.
Services to
Develop
various
Participative
Model
Agreements of
new Policy in
Rail
connectivity
and capacity
augmentation
projects.
40,00,000.00
24.12. 2012
2.
N.A.
(16 weeks from
the date after
acceptance of
CVs of key
professionals.
CVs accepted
on 08.10.2013)
26.01. 2014
Final NGR,
JV , DBFOT,
draft DBFMT
and Annuity
Model
submitted to
Railway
Board.
Inception
Report
submitted on
17.10.2013.
Detail of Contract awarded upto DECEMBER, 2013
1.
Tender No.
Date of
opening
(Tender)
Description of
work/study
PP&D/RVNL/SIOBGIMB/Bank/2012
24.07.2012 Bankability
RVNL/PP&D/Model/A
greement/2012
27.12.2012 Consultancy
study of
Samkhyali –
Gandhidham
3rd Line project
in WR.
Contract No. &
date (LOA)
Contractor’s
Name
PP&D/RVNL/SIOBGIMB/Bank/2012
Dated: 21.08.2012
M/s.
Feedback
Infrastructure
Services Pvt.
Ltd.
RVNL/PP&D/Model/
Agreement/2012
M/s HSA
Advocates (
Hemant
Sahai
Associates)
Estimated
cost of
work
(Rs.)
15,20,000.00
Sr.
No.
Tendere
d cost
(Rs.)
Scheduled
completion
date
11,89,892.00
Project Planning & Development Department
(16 weeks from
the date after
acceptance of
CVs of key
professionals.
CVs accepted
on 31.08.2012)
Physical
Progress
( upto
31.12.13)
Completed
06.08.2013 Bankability
Study of Umroli
Station
to
Nandgaon Port
new line project
in
Western
Railway.
PP&D/RVNL/Tender/N
andgaon-Umroli/2013
Dated 17.09.2013
M/s Deloitte
Touche
Tohmatsu
India Pvt.Ltd.
37,50,000.00
12,92,140/-
PP&D/RVNL/Ten
der/NandgaonUmroli/2013
Dated 03.01.2013
12,68,544/-
3.
Services to
Develop
various
Participative
Model
Agreements of
new Policy in
Rail
connectivity
and capacity
augmentation
projects.
40,00,000.00
24.12. 2012
2.
N.A.
(16 weeks from
the date after
acceptance of
CVs of key
professionals.
CVs accepted
on 08.10.2013)
26.01. 2014
Final draft for
NGR, JV,
DBFOT and
initial draft for
DBFMT and
Annuity
Model
submitted to
Railway
Board.
Draft Interim
Report
submitted on
09.12.2013.
Detail of Contract awarded upto JANUARY, 2014
2.
3.
PP&D/RVNL/Ten
der/NandgaonUmroli/2013
Services to
Develop
various
Participative
Model
Agreements of
new Policy in
Rail
connectivity
and capacity
augmentation
projects.
06.08.2013 Bankability
Study of Umroli
Station
to
Nandgaon Port
new line project
in
Western
Railway.
Contractor’s
Name
RVNL/PP&D/Model/
Agreement/2012
M/s HSA
Advocates (
Hemant
Sahai
Associates)
Dated 03.01.2013
PP&D/RVNL/Tender/N
andgaon-Umroli/2013
M/s Deloitte
Touche
Tohmatsu
India Pvt.Ltd.
Dated 17.09.2013
PP&D/RVNL/Bina - 06.11.2013 Bankability
PP&D/RVNL/Bina - M/s Balaji
Study
of
Bina
–
Kota/Tender/2013.
Kota/Tender/2013 Railroad
Kota doubling in
West
Central
railway.
Dated: 28.01.2014
Systems Ltd.
( BARSYL)
Estimated
cost of
work
(Rs.)
Tendere
d cost
(Rs.)
Scheduled
completion
date
37,50,000.00
27.12.2012 Consultancy
Contract No. &
date (LOA)
N.A.
12,92,140/-
RVNL/PP&D/Model/A
greement/2012
Description of
work/study
13,89,000/-
1.
Date of
opening
(Tender)
12,68,544/-
Tender No.
14,19,412/-
Sr.
No.
40,00,000.00
Project Planning & Development Department
(16 weeks from
the date after
acceptance of
CVs of key
professionals.
CVs accepted
on 08.10.2013)
26.01. 2014
(10 weeks from
the date of LOA
on 28.01.2014)
09.03. 2014
Physical
Progress
( upto
31.01.14)
Final draft for
NGR, JV,
DBFOT and
initial draft for
DBFMT and
Annuity
Model
submitted to
Railway
Board.
Draft Interim
Report
submitted on
09.12.2013.
Final
Estimate
awaited from
CPM/Mumbai
.
PP&D/RVNL
/Rewari – Manheru
/RFP/2013
Dated: 28.01.2014
PP&D/RVNL /
Rewar – Manheru
/ RFP/2013
Dated: 31.01.2014
M/s Balaji
Railroad
Systems Ltd.
( BARSYL)
M/s Balaji
Railroad
Systems Ltd.
( BARSYL)
13,89,000/-
PP&D/RVNL/HBJ ET/Tender/2013.
14,19,412/-
08.11.2013 Bankability
Study
of
Habibganj
–
rd
Itarsi 3
line
(Excluding Budni
to
Barkhera
section) in West
Central Railway.
08.11.2013 Bankability
Study of Rewari
to
Manheru
doubling
in
North Western
Railway.
13,89,000/-
5.
PP&D/RVNL/HBJ ET/Tender/2013.
14,19,412/-
4.
(10 weeks from
the date of LOA
on 28.01.2014)
09.03. 2014
(10 weeks from
the date of LOA
on 28.01.2014)
09.03. 2014
Detail of Contract awarded upto FEBRUARY, 2014
2.
3.
PP&D/RVNL/Ten
der/NandgaonUmroli/2013
Services to
Develop
various
Participative
Model
Agreements of
new Policy in
Rail
connectivity
and capacity
augmentation
projects.
06.08.2013 Bankability
Study of Umroli
Station
to
Nandgaon Port
new line project
in
Western
Railway.
Contractor’s
Name
RVNL/PP&D/Model/
Agreement/2012
M/s HSA
Advocates (
Hemant
Sahai
Associates)
Dated 03.01.2013
PP&D/RVNL/Tender/N
andgaon-Umroli/2013
M/s Deloitte
Touche
Tohmatsu
India Pvt.Ltd.
Dated 17.09.2013
PP&D/RVNL/Bina - 06.11.2013 Bankability
PP&D/RVNL/Bina - M/s Balaji
Study
of
Bina
–
Kota/Tender/2013.
Kota/Tender/2013 Railroad
Kota doubling in
West
Central
railway.
Dated: 28.01.2014
Systems Ltd.
( BARSYL)
Estimated
cost of
work
(Rs.)
Tendere
d cost
(Rs.)
Scheduled
completion
date
37,50,000.00
27.12.2012 Consultancy
Contract No. &
date (LOA)
N.A.
12,92,140/-
RVNL/PP&D/Model/A
greement/2012
Description of
work/study
13,89,000/-
1.
Date of
opening
(Tender)
12,68,544/-
Tender No.
14,19,412/-
Sr.
No.
40,00,000.00
Project Planning & Development Department
(16 weeks from
the date after
acceptance of
CVs of key
professionals.
CVs accepted
on 08.10.2013)
26.01. 2014
(10 weeks from
the date of LOA
on 28.01.2014)
09.04. 2014
Physical
Progress
( upto
28.02.14)
Final draft for
NGR, JV,
DBFOT and
initial draft for
DBFMT and
Annuity
Model
submitted to
Railway
Board.
Draft Interim
Report
submitted on
09.12.2013.
Final
Estimate
awaited from
CPM/Mumbai
.
Inception
Report
submitted on
20.02.2014.
8.
Dated: 06.02.2014
Dated: 06.02.2014
PP&D/RVNL /TMZ - 07.11.2013 Bankability
PP&D/RVNL /TMZ
Study
of
Tamluk
BYSA /RFP/2013
- BYSA /RFP/2013
to
Basulaya
Sutahata
doubling
in
South Eastern
Railway.
M/s Balaji
Railroad
Systems Ltd.
( BARSYL)
Dated: 06.02.2014
Systems Ltd.
( BARSYL)
M/s Diloitte
Touche
Tohmatsu Pvt.
Ltd.
13,89,000/13,89,000/14,80,000/-
PP&D/RVNL /GOI - M/s Balaji
Railroad
MOU /RFP/2013
Dated: 31.01.2014
14,19,412/-
06.11.2013 Bankability
Study
of
Goilkera
to
rd
Manoharpur 3
in South Eastern
Railway.
M/s Balaji
Railroad
Systems Ltd.
( BARSYL)
14,19,412/-
PP&D/RVNL /RANI
- kESHAVGANJ /
RFP/2013
PP&D/RVNL /
Rewar – Manheru
/ RFP/2013
15,20,000/-
PP&D/RVNL /GOI MOU /RFP/2013
07.11.2013 Bankability
Study of Rani to
keshavganj
doubling
in
North Western
Railway.
Dated: 28.01.2014
M/s Balaji
Railroad
Systems Ltd.
( BARSYL)
14,95,792/-
7.
PP&D/RVNL /RANI
- kESHAVGANJ /
RFP/2013
PP&D/RVNL/HBJ ET/Tender/2013.
14,19,412/
6.
PP&D/RVNL
/Rewari – Manheru
/RFP/2013
08.11.2013 Bankability
Study
of
Habibganj
–
rd
Itarsi 3
line
(Excluding Budni
to
Barkhera
section) in West
Central Railway.
08.11.2013 Bankability
Study of Rewari
to
Manheru
doubling
in
North Western
Railway.
14,19,412/
5.
PP&D/RVNL/HBJ ET/Tender/2013.
14,19,412/
4.
(10 weeks from
the date of LOA
on 28.01.2014)
Inception
Report
submitted on
20.02.2014.
09.04. 2014
(10 weeks from
the date of LOA
on 31.01.2014)
Inception
Report
submitted on
20.02.2014.
12.04. 2014
(10 weeks from
the date of LOA
on 06.02.2014)
Inception
Report
submitted on
20.02.2014.
17.04. 2014
(10 weeks from
the date of LOA
on 06.02.2014)
Inception
Report
submitted on
10.03.2014.
17.04. 2014
(10 weeks from
the date of LOA
on 06.02.2014)
17.04. 2014
Inception
Report
submitted on
19.02.2014.
PP&D/RVNL
/Tiruvallur Arakkonam /
RFP/2013
11.11.2013 Bankability
Study
of
Tiruvallur
to
th
Arakkonam 4
line in Southern
Railway.
PP&D/RVNL
/Tiruvallur Arakkonam /
RFP/2013
M/s Balaji
Railroad
Systems Ltd.
( BARSYL)
Dated: 07.02.2014
Dated: 07.02.2014
M/s Balaji
Railroad
Systems Ltd.
( BARSYL)
12,45,000/-
PP&D/RVNL
/Guntur - Tenali
/RFP/2013
14,19,412/
11.11.2013 Bankability
Study of Guntur
to
Tenali
doubling with
RE in South
Central Railway.
12,45,000/-
10.
PP&D/RVNL
/Guntur - Tenali
/RFP/2013
14,19,412/
9.
(10 weeks from
the date of LOA
on 07.02.2014)
Inception
Report
submitted on
20.02.2014.
18.04. 2014
(10 weeks from
the date of LOA
on 07.02.2014)
18.04. 2014
Inception
Report
submitted on
20.02.2014.
Detail of Contract awarded upto March, 2014
2.
3.
PP&D/RVNL/Ten
der/NandgaonUmroli/2013
Services to
Develop
various
Participative
Model
Agreements of
new Policy in
Rail
connectivity
and capacity
augmentation
projects.
06.08.2013 Bankability
Study of Umroli
Station
to
Nandgaon Port
new line project
in
Western
Railway.
Contractor’s
Name
RVNL/PP&D/Model/
Agreement/2012
M/s HSA
Advocates (
Hemant
Sahai
Associates)
Dated 03.01.2013
PP&D/RVNL/Tender/N
andgaon-Umroli/2013
M/s Deloitte
Touche
Tohmatsu
India Pvt.Ltd.
Dated 17.09.2013
PP&D/RVNL/Bina - 06.11.2013 Bankability
PP&D/RVNL/Bina - M/s Balaji
Study
of
Bina
–
Kota/Tender/2013.
Kota/Tender/2013 Railroad
Kota doubling in
West
Central
railway.
Dated: 28.01.2014
Systems Ltd.
( BARSYL)
Estimated
cost of
work
(Rs.)
Tendere
d cost
(Rs.)
Scheduled
completion
date
37,50,000.00
27.12.2012 Consultancy
Contract No. &
date (LOA)
N.A.
12,92,140/-
RVNL/PP&D/Model/A
greement/2012
Description of
work/study
13,89,000/-
1.
Date of
opening
(Tender)
12,68,544/-
Tender No.
14,19,412/-
Sr.
No.
40,00,000.00
Project Planning & Development Department
(16 weeks from
the date after
acceptance of
CVs of key
professionals.
CVs accepted
on 08.10.2013)
26.01. 2014
(10 weeks from
the date of LOA
on 28.01.2014)
09.04. 2014
Physical
Progress
( upto
31.03.14)
Final draft for
NGR, JV,
DBFOT and
initial draft for
DBFMT and
Annuity
Model
submitted to
Railway
Board.
Draft Interim
Report
submitted on
09.12.2013.
Final
Estimate
awaited from
CPM/Mumbai
.
Inception
Report
submitted on
20.02.2014.
8.
Dated: 06.02.2014
Dated: 06.02.2014
PP&D/RVNL /TMZ - 07.11.2013 Bankability
PP&D/RVNL /TMZ
Study
of
Tamluk
BYSA /RFP/2013
- BYSA /RFP/2013
to
Basulaya
Sutahata
doubling
in
South Eastern
Railway.
M/s Balaji
Railroad
Systems Ltd.
( BARSYL)
Dated: 06.02.2014
Systems Ltd.
( BARSYL)
M/s Diloitte
Touche
Tohmatsu Pvt.
Ltd.
13,89,000/13,89,000/14,80,000/-
PP&D/RVNL /GOI - M/s Balaji
Railroad
MOU /RFP/2013
Dated: 31.01.2014
14,19,412/-
06.11.2013 Bankability
Study
of
Goilkera
to
rd
Manoharpur 3
in South Eastern
Railway.
M/s Balaji
Railroad
Systems Ltd.
( BARSYL)
14,19,412/-
PP&D/RVNL /RANI
- kESHAVGANJ /
RFP/2013
PP&D/RVNL /
Rewar – Manheru
/ RFP/2013
15,20,000/-
PP&D/RVNL /GOI MOU /RFP/2013
07.11.2013 Bankability
Study of Rani to
keshavganj
doubling
in
North Western
Railway.
Dated: 28.01.2014
M/s Balaji
Railroad
Systems Ltd.
( BARSYL)
14,95,792/-
7.
PP&D/RVNL /RANI
- kESHAVGANJ /
RFP/2013
PP&D/RVNL/HBJ ET/Tender/2013.
14,19,412/
6.
PP&D/RVNL
/Rewari – Manheru
/RFP/2013
08.11.2013 Bankability
Study
of
Habibganj
–
rd
Itarsi 3
line
(Excluding Budni
to
Barkhera
section) in West
Central Railway.
08.11.2013 Bankability
Study of Rewari
to
Manheru
doubling
in
North Western
Railway.
14,19,412/
5.
PP&D/RVNL/HBJ ET/Tender/2013.
14,19,412/
4.
(10 weeks from
the date of LOA
on 28.01.2014)
Inception
Report
submitted on
20.02.2014.
09.04. 2014
(10 weeks from
the date of LOA
on 31.01.2014)
Inception
Report
submitted on
20.02.2014.
12.04. 2014
(10 weeks from
the date of LOA
on 06.02.2014)
Inception
Report
submitted on
20.02.2014.
17.04. 2014
(10 weeks from
the date of LOA
on 06.02.2014)
Inception
Report
submitted on
10.03.2014.
17.04. 2014
(10 weeks from
the date of LOA
on 06.02.2014)
17.04. 2014
Draft Final
Report
submitted on
19.03.2014.
PP&D/RVNL
/Tiruvallur Arakkonam /
RFP/2013
11.11.2013 Bankability
Study
of
Tiruvallur
to
th
Arakkonam 4
line in Southern
Railway.
PP&D/RVNL
/Tiruvallur Arakkonam /
RFP/2013
M/s Balaji
Railroad
Systems Ltd.
( BARSYL)
Dated: 07.02.2014
Dated: 07.02.2014
M/s Balaji
Railroad
Systems Ltd.
( BARSYL)
12,45,000/-
PP&D/RVNL
/Guntur - Tenali
/RFP/2013
14,19,412/
11.11.2013 Bankability
Study of Guntur
to
Tenali
doubling with
RE in South
Central Railway.
12,45,000/-
10.
PP&D/RVNL
/Guntur - Tenali
/RFP/2013
14,19,412/
9.
(10 weeks from
the date of LOA
on 07.02.2014)
Inception
Report
submitted on
20.02.2014.
18.04. 2014
(10 weeks from
the date of LOA
on 07.02.2014)
18.04. 2014
Inception
Report
submitted on
20.02.2014.
Detail of Contract awarded upto April, 2014
Project Planning & Development Department
3.
PP&D/RVNL/Ten
der/NandgaonUmroli/2013
06.08.2013 Bankability
Study of Umroli
Station
to
Nandgaon Port
new line project
in
Western
Railway.
RVNL/PP&D/Model/
Agreement/2012
M/s HSA
Advocates (
Hemant
Sahai
Associates)
Dated 03.01.2013
PP&D/RVNL/Tender/N
andgaon-Umroli/2013
M/s Deloitte
Touche
Tohmatsu
India Pvt.Ltd.
Dated 17.09.2013
PP&D/RVNL/Bina - 06.11.2013 Bankability
PP&D/RVNL/Bina - M/s Balaji
Study
of
Bina
–
Kota/Tender/2013.
Kota/Tender/2013 Railroad
Kota doubling in
West
Central
railway.
Dated: 28.01.2014
Systems Ltd.
( BARSYL)
Estimated
cost of
work
(Rs.)
Tendere
d cost
(Rs.)
37,50,000.00
Services to
Develop
various
Participative
Model
Agreements of
new Policy in
Rail
connectivity
and capacity
augmentation
projects.
Contractor’s
Name
12,92,140/-
2.
27.12.2012 Consultancy
Contract No. &
date (LOA)
13,89,000/-
RVNL/PP&D/Model/A
greement/2012
Description of
work/study
40,00,000.00
1.
Date of
opening
(Tender)
12,68,544/-
Tender No.
14,19,412/-
Sr.
No.
Scheduled
completion
date
N.A.
(16 weeks from
the date after
acceptance of
CVs of key
professionals.
CVs accepted
on 08.10.2013)
26.01. 2014
(10 weeks from
the date of LOA
on 28.01.2014)
09.04. 2014
Physical
Progress
( upto
30.04.14)
Final Report
for NGR, JV,
DBFOT
submitted to
Railway
Board on
23.10.2013
and Final
report for
DBFMT and
Annuity
Model
submitted to
Railway
Board on
28.05.2013
by HSA.
Draft Report
submitted on
11.04.2014.
Report under
examination.
Inception
Report
submitted on
20.02.2014.
8.
Dated: 06.02.2014
Dated: 06.02.2014
PP&D/RVNL /TMZ - 07.11.2013 Bankability
PP&D/RVNL /TMZ
Study
of
Tamluk
BYSA /RFP/2013
- BYSA /RFP/2013
to
Basulaya
Sutahata
doubling
in
South Eastern
Railway.
M/s Balaji
Railroad
Systems Ltd.
( BARSYL)
Dated: 06.02.2014
Systems Ltd.
( BARSYL)
M/s Diloitte
Touche
Tohmatsu Pvt.
Ltd.
13,89,000/13,89,000/14,80,000/-
PP&D/RVNL /GOI - M/s Balaji
Railroad
MOU /RFP/2013
Dated: 31.01.2014
14,19,412/-
06.11.2013 Bankability
Study
of
Goilkera
to
rd
Manoharpur 3
in South Eastern
Railway.
M/s Balaji
Railroad
Systems Ltd.
( BARSYL)
14,19,412/-
PP&D/RVNL /RANI
- kESHAVGANJ /
RFP/2013
PP&D/RVNL /
Rewar – Manheru
/ RFP/2013
15,20,000/-
PP&D/RVNL /GOI MOU /RFP/2013
07.11.2013 Bankability
Study of Rani to
keshavganj
doubling
in
North Western
Railway.
Dated: 28.01.2014
M/s Balaji
Railroad
Systems Ltd.
( BARSYL)
14,95,792/-
7.
PP&D/RVNL /RANI
- kESHAVGANJ /
RFP/2013
PP&D/RVNL/HBJ ET/Tender/2013.
14,19,412/-
6.
PP&D/RVNL
/Rewari – Manheru
/RFP/2013
08.11.2013 Bankability
Study
of
Habibganj
–
rd
Itarsi 3
line
(Excluding Budni
to
Barkhera
section) in West
Central Railway.
08.11.2013 Bankability
Study of Rewari
to
Manheru
doubling
in
North Western
Railway.
14,19,412/-
5.
PP&D/RVNL/HBJ ET/Tender/2013.
14,19,412/-
4.
(10 weeks from
the date of LOA
on 28.01.2014)
Inception
Report
submitted on
20.02.2014.
09.04. 2014
(10 weeks from
the date of LOA
on 31.01.2014)
Inception
Report
submitted on
20.02.2014.
12.04. 2014
(10 weeks from
the date of LOA
on 06.02.2014)
Inception
Report
submitted on
20.02.2014.
17.04. 2014
(10 weeks from
the date of LOA
on 06.02.2014)
Inception
Report
submitted on
10.03.2014.
17.04. 2014
(10 weeks from
the date of LOA
on 06.02.2014)
17.04. 2014
Final Report
submitted on
19.04.2014.
Report under
examination.
PP&D/RVNL
/Tiruvallur Arakkonam /
RFP/2013
11.11.2013 Bankability
Study
of
Tiruvallur
to
th
Arakkonam 4
line in Southern
Railway.
PP&D/RVNL
/Tiruvallur Arakkonam /
RFP/2013
M/s Balaji
Railroad
Systems Ltd.
( BARSYL)
Dated: 07.02.2014
Dated: 07.02.2014
M/s Balaji
Railroad
Systems Ltd.
( BARSYL)
12,45,000/-
PP&D/RVNL
/Guntur - Tenali
/RFP/2013
14,19,412/-
11.11.2013 Bankability
Study of Guntur
to
Tenali
doubling with
RE in South
Central Railway.
12,45,000/-
10.
PP&D/RVNL
/Guntur - Tenali
/RFP/2013
14,19,412/-
9.
(10 weeks from
the date of LOA
on 07.02.2014)
Inception
Report
submitted on
20.02.2014.
18.04. 2014
(10 weeks from
the date of LOA
on 07.02.2014)
18.04. 2014
Inception
Report
submitted on
20.02.2014.
Detail of Contract awarded upto May, 2014
Project Planning & Development Department
3.
PP&D/RVNL/Ten
der/NandgaonUmroli/2013
06.08.2013 Bankability
Study of Umroli
Station
to
Nandgaon Port
new line project
in
Western
Railway.
RVNL/PP&D/Model/
Agreement/2012
M/s HSA
Advocates (
Hemant
Sahai
Associates)
Dated 03.01.2013
PP&D/RVNL/Tender/N
andgaon-Umroli/2013
M/s Deloitte
Touche
Tohmatsu
India Pvt.Ltd.
Dated 17.09.2013
PP&D/RVNL/Bina - 06.11.2013 Bankability
PP&D/RVNL/Bina - M/s Balaji
Study
of
Bina
–
Kota/Tender/2013.
Kota/Tender/2013 Railroad
Kota doubling in
West
Central
railway.
Dated: 28.01.2014
Systems Ltd.
( BARSYL)
Estimated
cost of
work
(Rs.)
Tendere
d cost
(Rs.)
37,50,000.00
Services to
Develop
various
Participative
Model
Agreements of
new Policy in
Rail
connectivity
and capacity
augmentation
projects.
Contractor’s
Name
12,92,140/-
2.
27.12.2012 Consultancy
Contract No. &
date (LOA)
13,89,000/-
RVNL/PP&D/Model/A
greement/2012
Description of
work/study
40,00,000.00
1.
Date of
opening
(Tender)
12,68,544/-
Tender No.
14,19,412/-
Sr.
No.
Scheduled
completion
date
N.A.
(16 weeks from
the date after
acceptance of
CVs of key
professionals.
CVs accepted
on 08.10.2013)
26.01. 2014
(10 weeks from
the date of LOA
on 28.01.2014)
09.04. 2014
Physical
Progress
( upto
31.05.14)
Final Report
for NGR, JV,
DBFOT
submitted to
Railway
Board on
23.10.2013
and Final
report for
DBFMT and
Annuity
Model
submitted to
Railway
Board on
28.05.2013
by HSA.
Draft Report
submitted on
11.04.2014.
Cost of the
project is yet
to be
finalized.
Inception
Report
submitted on
20.02.2014.
8.
Dated: 06.02.2014
Dated: 06.02.2014
PP&D/RVNL /TMZ - 07.11.2013 Bankability
PP&D/RVNL /TMZ
Study
of
Tamluk
BYSA /RFP/2013
- BYSA /RFP/2013
to
Basulaya
Sutahata
doubling
in
South Eastern
Railway.
M/s Balaji
Railroad
Systems Ltd.
( BARSYL)
Dated: 06.02.2014
Systems Ltd.
( BARSYL)
M/s Diloitte
Touche
Tohmatsu Pvt.
Ltd.
13,89,000/13,89,000/14,80,000/-
PP&D/RVNL /GOI - M/s Balaji
Railroad
MOU /RFP/2013
Dated: 31.01.2014
14,19,412/-
06.11.2013 Bankability
Study
of
Goilkera
to
rd
Manoharpur 3
in South Eastern
Railway.
M/s Balaji
Railroad
Systems Ltd.
( BARSYL)
14,19,412/-
PP&D/RVNL /RANI
- kESHAVGANJ /
RFP/2013
PP&D/RVNL /
Rewar – Manheru
/ RFP/2013
15,20,000/-
PP&D/RVNL /GOI MOU /RFP/2013
07.11.2013 Bankability
Study of Rani to
keshavganj
doubling
in
North Western
Railway.
Dated: 28.01.2014
M/s Balaji
Railroad
Systems Ltd.
( BARSYL)
14,95,792/-
7.
PP&D/RVNL /RANI
- kESHAVGANJ /
RFP/2013
PP&D/RVNL/HBJ ET/Tender/2013.
14,19,412/-
6.
PP&D/RVNL
/Rewari – Manheru
/RFP/2013
08.11.2013 Bankability
Study
of
Habibganj
–
rd
Itarsi 3
line
(Excluding Budni
to
Barkhera
section) in West
Central Railway.
08.11.2013 Bankability
Study of Rewari
to
Manheru
doubling
in
North Western
Railway.
14,19,412/-
5.
PP&D/RVNL/HBJ ET/Tender/2013.
14,19,412/-
4.
(10 weeks from
the date of LOA
on 28.01.2014)
Inception
Report
submitted on
20.02.2014.
09.04. 2014
(10 weeks from
the date of LOA
on 31.01.2014)
Draft Final
Report
submitted on
19.05.2014.
12.04. 2014
(10 weeks from
the date of LOA
on 06.02.2014)
Inception
Report
submitted on
20.02.2014.
17.04. 2014
(10 weeks from
the date of LOA
on 06.02.2014)
Inception
Report
submitted on
10.03.2014.
17.04. 2014
(10 weeks from
the date of LOA
on 06.02.2014)
17.04. 2014
Final Report
submitted on
19.04.2014.
Report under
examination.
PP&D/RVNL
/Tiruvallur Arakkonam /
RFP/2013
11.11.2013 Bankability
Study
of
Tiruvallur
to
th
Arakkonam 4
line in Southern
Railway.
PP&D/RVNL
/Tiruvallur Arakkonam /
RFP/2013
M/s Balaji
Railroad
Systems Ltd.
( BARSYL)
Dated: 07.02.2014
Dated: 07.02.2014
M/s Balaji
Railroad
Systems Ltd.
( BARSYL)
12,45,000/-
PP&D/RVNL
/Guntur - Tenali
/RFP/2013
14,19,412/-
11.11.2013 Bankability
Study of Guntur
to
Tenali
doubling with
RE in South
Central Railway.
12,45,000/-
10.
PP&D/RVNL
/Guntur - Tenali
/RFP/2013
14,19,412/-
9.
(10 weeks from
the date of LOA
on 07.02.2014)
Inception
Report
submitted on
20.02.2014.
18.04. 2014
(10 weeks from
the date of LOA
on 07.02.2014)
18.04. 2014
Inception
Report
submitted on
20.02.2014.